Loading...
HomeMy WebLinkAboutSWG2000-00156 - SWG Inspections Design Review Checklist II IJ 'P Applicant: L 0,(11'7 C Designer: ' u ❑ Is drairdi ld placed in the area of the tepstholes7 application rate the Sarre? 8jh,55(S"rSIY¢� L' arG�S /❑ Is soil aPP r -1 __:� llla-S a pf�0O-M - Y U /❑ Is the norther of bedrooms the same? � 4 g6/ g J �0 I' �4 ba ' lJ y 2� f(,)[ TO"t ❑ Is infiltration area the same? bk•1 S X 3 b ❑ Is reserve area adequate? lU" 44, r'tS�a C Is installation in and depth correct? SA 4 + 31O = G 8 • \ In.�a�Y1�4 col'.�s? on adequate for system design? 31 M PD 0 is vcnical sePmad � - ❑ Do tanks have risers to the surface and an effluent filter or pump screen? 1s the pump tank 1.75 x&4-tlow1 !2-n ItOD lw re observation ports and cleanouts adequate? ❑ Are horizontal setbacks adequate?Is transport Pipe double casing need (wells,surface water,property line., easements,buildings) C JQy� ,H Is a notice to title needed? /IS a variance or waiver requested? (lave all fortes been supplied? 0 Is lateral length correct? ❑ Is orifice number correct? 4 7S 3 = toS.1�= 3=A.2��3n3 � 1o9 0 TS g,p.m.(@ total prssure head)correct?(total orif msx 0.59 at 16, OR total orif ces x 0.41 at 1/8) 6ti K • S1 c(p ,11 0 Is preferred manifold configuration used?Are check valves needed and used? 0 Is total Pressure head(tdh)correct? Transport Pipe frictions head calculations(Hazen William Formula): F=A(B I C)t" F=transport pipe f icbon head A =transport pipe length in feet B =pump robs pressure head(gpm pump capacity) C=K for transport pipe diametedschedule +` Elevation between pump and uppermost orifice +Residual head infect(2ftlrfor 3116"orifices. 5 feet far l/8"orifices) +7),amparl pipe f fiction head 0 'V1 +0.6 not ietion loss in distribution stem (1 0 s =feet total discharge head(CDH)