Loading...
HomeMy WebLinkAboutFIR2008-00004.00005,00006,00007,00008,00009 - FIR Letters / Memos - 8/25/2008 Case Activity Listing 10/28/2009 2:33:03PM Case#: FIR2008-00004 IP4u, Assigned Done — Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By FIRA010 Application Received 2/6/2008 2/6/2008 None DONE: KKK 2/6/2008 KKK FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW The application was incomplete,I called the contractor and ask for more information.Seismic cal's,bracing details,gate valve spec's,double check valve,flow switch and dry pipe valves.He said that I will receive it by the 19th. FIRA40 Approved for Issuance 2/25/2008 2/25/2008 None DONE CMH 2/25/2008 CMH FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK FIRA600 Inspection 7/22/2008 7/29/2008 None FAIL CJH 7/31/2008 KDM BLDG#1 FIRE SPRINKLER HYDRO:PSIG 1 LEAK IN NW 1/4 RM# 7/30/08 216 PSIG FIRA600 Inspection 7/30/2008 7/30/2008 None PASS CJH 7/31/2008 KDM GWB HARD COVER:OK TO HARD COVER WITHOUT GWB IN AREAS NOT UTILIZING SUSPENDED CEILINGS OR OPEN CEILING. FIRA200 Inspection 8/25/2008 8/26/2008 None DONE LAW 8/27/2008 KDM SPRINKLER HYDRO:LEAK REPAIRED. II 2 ,100 Page 1 of 1 CaseActivity•rpt Case Activity Listing 10/28/2009 2:34:01 PM Case#: FIR2008-00005 i� f,3 --j" A'149 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By FIRA40 Approved for Issuance 2/25/2008 None 2/25/2008 CMH FIRA010 Application Received 2/6/2008 2/6/2008 None DONE KKK 2/6/2008 KKK FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW The application was incomplete,I called the contractor and asked for more information.Seismic calc's for the bracing,bracing details,spec's for the flow switch,gate vales,dry pipe valve,and double check valves.He said that I would be receiving it by Tue.the 19th. FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK FIRA600 Inspection 8/8/2008 8/12/2008 None PASS CJH 8/13/2008 KDM HYDRO BUILDING#2"B" FIRA600 Inspection 8/25/2008 8/26/2008 None DONE LAW 8/27/2008 KDM SPRINKLER HYDRO:LUBE AND HYDROLICS AREA. Page 1 of 1 CaseActivity..rpt Case Activity Listing 10/28/2009 Case #: FIR2008-00006 2:34:57PM I� Assigned Done Activity Description Date 1 E Date Da te 3 Hold Disp To By Updated Updated By FIRA100 Fire Marshal Review 2/6/2008 None DONE CJH LAW 2,25i2008 LAW The plans submitted were incomplete,I called the contractor and asked for more information.Seismic calc's for the bracing,bracing details,manufactures spec's on the dry pipe valve,flow switch,double check valve and gate valves.He stated that he would have them to me by the 19th. FIRA010 Application Received 2/6/2008 2/6/2008 None DONE KKK 2/6/2008 KKK FIRA40 Approved for Issuance 2/25/2008 2/25/2008 None DONE CMH 2/25/2008 CMH FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK 12 1(7 0 Page 1 of 1 CaseActivity..rpt 10/28/2009 Case Activity Listing 10/2/2009 11P4 Case#: FIR2008-00007 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By FIRA010 Application Received 2/6/2008 2/6;2008 None DONE KKK 2/6/2008 KKK FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW The application was incomplete,I called the contractor and asked for more information.Seismic calc's,bracing details,gate valves,double check valve,flow switch,dry pipe valves.He said that I will receive it by the 19th. FIRA40 Approved for Issuance 2/25/2008 2/25/2008 None DONE CMH 2/25/2008 CMH FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK FIRA91 0 Meeting 10/30/2008 10/31/2008 None LAW 11/4/2008 KDM FINAL PENDING:WASH BAY AREA ONLY,REINSPECTION OK'D ON DRAM DOWN. ('Ze3 q �� 6q Page 1 of I Ca-Activity..rpt Case Activity Listing 10/28/2009 2:36:32PM Case #: FIR2008-00008 " r rr� Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By FIRA010 Application Received 2/6/2008 2'6'2008 None DONE KKK 2 6 2008 KKK FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW The application was incomplete,I called the contractor and asked for more information.Seismic calc's,bracing details,gate valves,double check valve,flow switch and dry pipe valve.He said that I should be receiving it by the 19th. FIRA40 Approved for Issuance 2/26/2008 2/26/2008 None DONE CMH 2/26/2008 CMH FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK 12-/1-7 08 CZ1 Page 1 of 1 CawActivity..cpt Case Activity Listing 10/28/2009 2:37:11 PM Case#: FIR2008-00009 1' Hold Disp FIRA010 Application Received 2/6/2008 2/6/2008 None DONE KKK 2/6/2008 KKK FIRA200 Inspection 2/28/2008 2/16/2008 None PASS CJH CJH 2/28/2008 CJH Hydro Pass of underground fire loop,purple pipe,and sprinkler riser underground.Several attempts were required due to a dead end section of piping having trapped air in it with no immediate provision to bleed off the air.Pressure @ 1223-202 PSIG and upon return to the site @ 1446-201 PSIG. FIRA100 Fire Marshal Review 2/28/2008 2/28/2008 None DONE LAW 2/28/2008 LAW FIRA40 Approved for Issuance 2/29/2008 2/29/2008 None DONE CMH 2/29/2008 CMH FIRA20 Issue Permit 3/5/2008 None DONE KKK 3/5/2008 KKK FIRA25 Print Inspection Card 3/5/2008 None DONE KKK 3/5/2008 KKK Va(9� � ri-- 6 Page 1 of 1 CaseActivity•Ipt