HomeMy WebLinkAboutFIR2008-00004.00005,00006,00007,00008,00009 - FIR Letters / Memos - 8/25/2008 Case Activity Listing 10/28/2009
2:33:03PM
Case#: FIR2008-00004
IP4u,
Assigned Done —
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
FIRA010 Application Received 2/6/2008 2/6/2008 None DONE: KKK 2/6/2008 KKK
FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW
The application was incomplete,I called the contractor and ask for more information.Seismic cal's,bracing details,gate valve spec's,double check valve,flow switch and dry pipe valves.He said that I will
receive it by the 19th.
FIRA40 Approved for Issuance 2/25/2008 2/25/2008 None DONE CMH 2/25/2008 CMH
FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK
FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK
FIRA600 Inspection 7/22/2008 7/29/2008 None FAIL CJH 7/31/2008 KDM
BLDG#1 FIRE SPRINKLER HYDRO:PSIG 1 LEAK IN NW 1/4 RM#
7/30/08 216 PSIG
FIRA600 Inspection 7/30/2008 7/30/2008 None PASS CJH 7/31/2008 KDM
GWB HARD COVER:OK TO HARD COVER WITHOUT GWB IN AREAS NOT UTILIZING SUSPENDED CEILINGS OR OPEN CEILING.
FIRA200 Inspection 8/25/2008 8/26/2008 None DONE LAW 8/27/2008 KDM
SPRINKLER HYDRO:LEAK REPAIRED.
II
2 ,100
Page 1 of 1 CaseActivity•rpt
Case Activity Listing 10/28/2009
2:34:01 PM
Case#: FIR2008-00005
i� f,3 --j" A'149
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
FIRA40 Approved for Issuance 2/25/2008 None 2/25/2008 CMH
FIRA010 Application Received 2/6/2008 2/6/2008 None DONE KKK 2/6/2008 KKK
FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW
The application was incomplete,I called the contractor and asked for more information.Seismic calc's for the bracing,bracing details,spec's for the flow switch,gate vales,dry pipe valve,and double check
valves.He said that I would be receiving it by Tue.the 19th.
FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK
FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK
FIRA600 Inspection 8/8/2008 8/12/2008 None PASS CJH 8/13/2008 KDM
HYDRO BUILDING#2"B"
FIRA600 Inspection 8/25/2008 8/26/2008 None DONE LAW 8/27/2008 KDM
SPRINKLER HYDRO:LUBE AND HYDROLICS AREA.
Page 1 of 1 CaseActivity..rpt
Case Activity Listing 10/28/2009
Case #: FIR2008-00006 2:34:57PM
I�
Assigned Done
Activity Description Date 1
E Date
Da
te 3 Hold Disp To By Updated Updated By
FIRA100 Fire Marshal Review 2/6/2008 None DONE CJH LAW 2,25i2008 LAW
The plans submitted were incomplete,I called the contractor and asked for more information.Seismic calc's for the bracing,bracing details,manufactures spec's on the dry pipe valve,flow switch,double
check valve and gate valves.He stated that he would have them to me by the 19th.
FIRA010 Application Received 2/6/2008 2/6/2008 None DONE KKK 2/6/2008 KKK
FIRA40 Approved for Issuance 2/25/2008 2/25/2008 None DONE CMH 2/25/2008 CMH
FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK
FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK
12 1(7 0
Page 1 of 1 CaseActivity..rpt
10/28/2009
Case Activity Listing 10/2/2009
11P4 Case#: FIR2008-00007
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
FIRA010 Application Received 2/6/2008 2/6;2008 None DONE KKK 2/6/2008 KKK
FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW
The application was incomplete,I called the contractor and asked for more information.Seismic calc's,bracing details,gate valves,double check valve,flow switch,dry pipe valves.He said that I will receive
it by the 19th.
FIRA40 Approved for Issuance 2/25/2008 2/25/2008 None DONE CMH 2/25/2008 CMH
FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK
FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK
FIRA91 0 Meeting 10/30/2008 10/31/2008 None LAW 11/4/2008 KDM
FINAL PENDING:WASH BAY AREA ONLY,REINSPECTION OK'D ON DRAM DOWN.
('Ze3 q
�� 6q
Page 1 of I Ca-Activity..rpt
Case Activity Listing 10/28/2009
2:36:32PM
Case #: FIR2008-00008
" r rr�
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
FIRA010 Application Received 2/6/2008 2'6'2008 None DONE KKK 2 6 2008 KKK
FIRA100 Fire Marshal Review 2/6/2008 2/25/2008 None DONE CJH LAW 2/25/2008 LAW
The application was incomplete,I called the contractor and asked for more information.Seismic calc's,bracing details,gate valves,double check valve,flow switch and dry pipe valve.He said that I should
be receiving it by the 19th.
FIRA40 Approved for Issuance 2/26/2008 2/26/2008 None DONE CMH 2/26/2008 CMH
FIRA20 Issue Permit 2/27/2008 None NJP 2/27/2008 KKK
FIRA25 Print Inspection Card 2/27/2008 None NJP 2/27/2008 KKK
12-/1-7 08 CZ1
Page 1 of 1 CawActivity..cpt
Case Activity Listing 10/28/2009
2:37:11 PM
Case#: FIR2008-00009
1' Hold Disp
FIRA010 Application Received 2/6/2008 2/6/2008 None DONE KKK 2/6/2008 KKK
FIRA200 Inspection 2/28/2008 2/16/2008 None PASS CJH CJH 2/28/2008 CJH
Hydro Pass of underground fire loop,purple pipe,and sprinkler riser underground.Several attempts were required due to a dead end section of piping having trapped air in it with no immediate provision to
bleed off the air.Pressure @ 1223-202 PSIG and upon return to the site @ 1446-201 PSIG.
FIRA100 Fire Marshal Review 2/28/2008 2/28/2008 None DONE LAW 2/28/2008 LAW
FIRA40 Approved for Issuance 2/29/2008 2/29/2008 None DONE CMH 2/29/2008 CMH
FIRA20 Issue Permit 3/5/2008 None DONE KKK 3/5/2008 KKK
FIRA25 Print Inspection Card 3/5/2008 None DONE KKK 3/5/2008 KKK
Va(9� � ri-- 6
Page 1 of 1 CaseActivity•Ipt