Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
COM2007-00132 Final Entry Sign - COM Permit / Conditions - 8/20/2008
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext 352 ` Shelton, WA 98584 COMMERCIAL BUILDING PERMIT COM2007-00132 OWNER: MASON COUNTY PUBLIC WORKS RECEIVED: 12/7/2007 CONTRACTOR: LICENSE: EXP: ISSUED: SITE ADDRESS: 100 W PUBLIC WORKS DR BLDG A SHELTON EXPIRES: PARCEL NUMBER: 420021000010 LEGAL DESCRIPTION: PCL 2 OF BLA 06-72 PROJECT DESCRIPTION: DIRECTIONS TO SITE: MONUMENT ENTRY SIGN Nortthwest corner of Highway 101 and Highway 1102 (Dayton Airport Rd) General Information Construction&Occupancy Information Type of Use: Insp.Area: No. of Units: Type of Constr.: of Bathrooms: Occ. Group: Type of Work: SGN Fire Dist.: 11 No. Valuation: $ 3,000.00 No. of Stories: Occ. Load: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: E 20.00 Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp.Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2007-00132 Please refer to the following pages for conditions of this permit. 1 of 4 Plumbing Fixtures Mechanical Fixtures FEES Ty;;e Qty. Type Qty. Type By Date Amount Receipt Total CASE NOTES FOR COM2007-00132 CONDITIONS FOR COM2007-00132 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential ris nd m netary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647- 982. r signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be Mcr;rd7� ollected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 3) Owner/Agen s es o sible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. 4) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL NOT be granted. 1 ddi o , a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County Buil ing a t prior to any further inspections being performed or approvals granted. X 5) Any changes 4 construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are removed, app val will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collect b a n County Building Department prior to any further inspections being performed or approvals granted. X 6) ALL CO STRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQU MENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE CC ANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 7) Changes to app d bui ing plans that affect compliance to the current Washington State Energy Code (W C), ventilation and Indoor Air Quality Code ( Q) B ding/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X COM2007-00132 2 of 4 1 8) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance wit international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason unty u pector shall be made prior to requesting additional inspections. X 9) All property Ines shall be clearly identified at the time of foundation inspection. X 10) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request I I ins ection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant w ounty ordinances and building regulations. X 11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for enod.n t exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit hol h ve evented action from being taken. No more than one extension may be granted. X 12) Pressure treate od ma ufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, con o n flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 13) This parc is to i smoke management zone. Please contact a fire warden at(360) 427-9670 ext. 459 for further information. X This permit becomes nu(land void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress ins tion.The owiler or the ent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property an str ture for revie a in pection. OWN ER OR AGENT: ` DATE: I O COM2007-00132 3 of 4 O tK CONCRETE MECHANICAL MANUFACTURED HOME f N _ _._ p Dale By 0 Footings!Setbacks Gag Piping ' Ribbons Z o Interior Date By Interior-Date By Data By n w Exteror Date'� !bl D it g ( O N Y �iY�1V Exterior Date _ B Set-up INSULATION z Point Load 1lsolated Footings Date t3y Z BG I SLAB INSULATION -A Date By Data By FIRE DEPARTMENT < Foundation Walls C Floors Date gY C Date By Data By DECKS W FRAMING walls Date By n Date By Data By PROPANE TANKS PLUMBING vault Date 13y_. 0 Date By Groundwork Attic OTHER N Date By Type Dale By Date By DRYWALL Type 0 o.w.v � Int.Brace Wall Date B Date g y _... ____ __ ____ Date By FINAL INSPECTION CD Water Line Fire Separation O Date By Date By Date y1� Pass or Request Inspect. Type of Insp. Fail Date Date Done By Comments N t��� �.y h (✓ ✓vim ►n�rJl�- GSS 7 1<bK -] rS%6 j-bY' -fu C0_4CrrZG ,•Gt� c3+1 wjti IpdIL eat ✓tlJvC 0 SHEET NOTES SITE PLAN SYMBOLS 1 STMBMI NOTE DESCRIPTION I s"m AID TEXT DESCRIPTION I 5YMWIL AND TEXT DESCRIPTION I SYMBOL AND TEXT 1 FIRE ANNA"TOR PANEL PWPf.RTY LINE ww PARM STALL AND LOCATION(SEE BUWNG Wn$h(R) N 5OV000•N MCNR1ENT Ism S A LANDSCAPE RIMER FLOOR RAN) 040(Nrwv) eee*awI p R L Drum,E,� - ENTRY SIGN �" LF H © WQJMM llE FRONT TARD h#cd-(C), BASE BD 04CL.UDM deEc�:tia�ad SETBACK TRANSFORMER whew dap C GRADING,FENCING AND eelborSc dlefaoe wh"hMoAW, R-7 GATES, UD�ROUD bwwra Octm o,a,A yrb 9 LmLITIES AND P rBNG TO cmmots pad-aea*.As ❑T (--t ti PW..,to.) END ALTERNATE AA-S dl iwippUa�, Blll�l aAth dwctrkd 2 PROVIDE CONCRETE WORK R R jm BID U.N GEI EIIATM IWDKAPPED PA I"n". DRAINAGE AS REGiARED vwvtw-azrdFW with ® rm wA, 2 FOR CANOPY R FIIM TAW-5, COVERED PARKINGhadr�Stdl (W-CMkPf FUEL TANKS, mly r Yiwry I'[�OLINC4.EGUIPE'BfT n calla A acerb,KIMP1Tlr CaFLPE C 15-� ��k IS I��p a dhr��� � �b AMERICAN 1N -- DRAYUNGS FOR DETAILS. bid dtarrde unA. r medxrYad dautge NC m ` a mal Q FUEL ISLAND SPILL TAW ENDS OF C5TREET NAME c-,dk t4 with akwbiod eLP dl dincthr (PART OF BD ALT.AA-5) see wacif dj" FENCE x x— �eoas EDGE OF NaAo FLAG POLE Q I l p MIECIWOCAL ENCLOSURE � see pedikdlem ����� VC NLINC 3 PAVEMENT Q 3 GENERATOR R HASTE OIL FIRE RTDRANT 4FA. TANG CURB C04OM7E I ALK © PAVE STATE PAVEMENT BRPSTER cat-lty�xl4m eMlu1 --- RD •B imled.IoMb,t19kd-� Q PAIR IV CHAIN LINK GATES, TUNLwLr wam REF. PT. WEST SIDE MAINTENANCE IRON PIPE YARD: PAVING, BY MAINTENANCE YARD PAVING: AL7f:RNATE AA-4 PAVING AT EMPLOYEE PARKING OTHERS/ N.I.C. AND VISITOR PARKING ALTERNATE AA-2 4 GENERAL NOTES t PUBLMP. 7 Z i MP t NOTE j WELL HOUSE 1. FOIR Ca METE DE9CRIPraN OF BD ALTERNATES,SEE SPECIFICATIONS t ;�Y 2. FOR C ITRASTING ILATCN PATTERNS 5 OF BD ALTERNATE PAVNGS,SEE t .F,F1, _ — 1 CIVIL DRANNGS. I_ 5 if I —____-- — __J_ BID ALTERNATE AA-3 t_ I t �{ (� UN, r.i — w ,a - I - t , t � .�t'� PLANNING �� !1 I BID LTERNATE AA- r — a I _ t RO.N. SITE ,. ':: ��k1rr y s I _ _I EMPLO E l 1 'rpRwErmRrs- } _ :_ t�Id SF�E e I _t SEE CIVIL ' ;d JET. �t:���OVAL ���s I -- � T.O.C. I PARKS I DRAWINGg L -- I 6 . I I ----- _ _ DOA RAG 1 1 1 1, ray I z i HEdTE � ' � O I I i COVERED PARKI I —�BLpG.I 4 CJIT f i BLDG. 2 a�i G. t I ENICLE MAINTENANCE ,5 s ✓,ALL S BACKS ARE MEASURED ALT TRLlCK FR�M THE FURTHEST PROJECTION OF THE BUILDING 1 PAVING-F.H. CONC.PAVING I IA - --- PUB 8 ���.—. ._. I I INISTRAT i 8 4 MA T _ I5 F- vislTo� Y VING •7Lt_—r-�=.' �-v=1Ck-w-w-w-w�. N� BARKING_ — SNEL CONC.PAVING REVISION PAVING AT EMPLOYEE PARKING ACCE 3 AND VISITOR PARKING / ✓" _~•— ALTERNATE AA-2 UMFOR SATE 9 '-•-._,,._ urxrs PAVI M-s PeaT1T 9 '1 -5M DTt eFiAaos DATE 7-25-07 ---� -r_,�_,y_.`�• I I 5 ROAD LEI 51T ONSTRUCTION+NET FUEL ISLAND 2 _ ¢ 10 ALTERNATE AA-5 10 SITE PLAN / �'"TE� EDREMA scRLE�1.iO' a alr laa DRAWING A I B I C I D ( J I K Case Activity Listing 10/28/2009 Case#: COM2007-00132 2:21:43PM M0NuftV,7ZA__ Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By COMA010 Application Received 12/7/2007 None DONE KS 12/7/2007 KS COMB130 Planning Review 12/7/2007 12/10/2007 None DONE PBC PBC 12/10/2007 PBC Balance of project including buffer plantings reviewed under earlier permits for the proposed facility. COMB110 Building Plan Review 12/7/2007 12/18/2007 None DONE ARC 12/18/2007 ARC FEES DUE COMA100 Approved for Issuance 12/19/2007 None DONE CMH 12/19/2007 CMH Notified Kelle at Public Works. COMA510 Reprint Commerical Permit 12/19/2007 None DONE KKK 12/20/2007 KKK Permit issued. Done by reprinting due to paying by PO and Ben not avalible. COMA540 Print Inspection Card 12/19/2007 None DONE KKK 12/19/2007 KKK COMA200 HOLD 12/19/2007 12/20/2007 Hold DONE KKK 12/20/2007 KKK Please have applicant/contractor make out new application removing Helix. Helix is a consultant not an engineer. COMC 110 Footing Inspection 7/15/2008 7/16/2008 None PASS LDK 7/17/2008 KDM SIGN CHANGE FROM METAL TO CONCRETE PROVIDE ENGINEER DETAIL ON REBAR AND SIZE CALL OUTS ON SIGN WILL LOOK AT PRIOR TO POURING SIGN. COMC155 Final Inspection-Passed 8/20/2008 8/20/2008 None PASS LDK 8/21/2008 KDM Page 1 of 1 CaseActivity..rpt