HomeMy WebLinkAboutCOM2007-00061 Building 4 Final Vehicle Wash - COM Permit / Conditions - 1/5/2010 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
NPMason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
Shelton,WA 98584
4 COMMERCIAL BUILDING PERMIT COM2007-00061
OWNER: MASON COUNTY PUBLIC WORKS RECEIVED: 5/25/2007
CONTRACTOR: ROGNLIN'S, INC. LICENSE: ROGNL*'342LF EXP: 8/1/2009 ISSUED: 10/15/200E
SITE ADDRESS: 100 W PUBLIC WORKS DR BLDG C SHELTON EXPIRES: 4/15/2009
PARCEL NUMBER: 420021000010
LEGAL DESCRIPTION: PCL 2 OF BLA#06-72 PTN OF W1/2 NE
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
VEHICLE WASH, bldg 4 Intersection of Hwy 101 & Hwy 102.
General Information Construction &Occupancy Information
No. of Units: Type of Constr.: II
Type of Use: wash bldg Insp.Area: No. of Bathrooms: 0 Occ. Group: s2
Type of Work: NEW Fire Dist.: 13
Valuation: $ 931,871.85 No. of Stories: 1 Occ. Load: 1
Building Height: 26
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building: 19,045
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp. Plan Desig.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2007-00061 Please refer to the following pages for conditions of this permit. 1 of 8
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty, Type By Date Amount Receipt
Hosebibs 3 Unit Heater 4
Total
CASE NOTES FOR
COM2007-00061
CONDITIONS FOR
COM2007-00061
1) 1. A stormwater site plan with low impact development features such as pervious paving, rain garden infiltration and native vegetation, will be
created and implemented prior to development, clearing, grading or construction of any portion of the proposed development.
2. The proposal shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed
should be restored to prevent erosion and other environmental impacts.
3. Site is within a portion of the county designated as Class II Critical Aquifer Recharge Area, under Critical Aquifer Recharge Area Chapter
17.01.080 of the Mason County Resource Ordinance. All provisions of the CARA chapter shall be followed including obtaining a Mason
Environmental Permit, application of Best Management Practices on site, and an engineered stormwater site plan in compliance with Ecology's
stormwater, water quality, Hazardous Waste, wetland and solid waste program BMP, and BMPs from the departments of Health, Agriculture,
Transportation and State Conservation District Office.
4. Project applicant shall develop in compliance with Geotechnical report completed for this site by Aspect Consulting dated January 22, 2007 and
updated March 26, 2007.
5. In accordance with discussion between Squaxin Tribe and Mason County at meeting on April 9 2007, Mason County and the Public Works
department propose to work with the Squaxin Indian Tribe to craft a Memorandum of Understanding between the two governments, relating to
proposed project measures, which further reduce impact to the aquifer beyond that of usual development impact through a series of additional
measures. These proposed measures and the memorandum are being developed, but would include such measures as low impact development,
and minimizing water withdrawal through conservation measures, pervious pavement, stormwater infiltration, rain gardens and native vegetation,
and proposing to o Y
to City of Shelton water when it becomes available. Although this proposed Memorandum of Understanding is still under
way as of this d t , ie understanding of the parties that it shall be completed and in place prior to the issuance of building permits for this
project.x (,
2) Owner/Agent1;7sible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
14.28.
X
COM2007-00061 2 of 8
3) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND
OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD
RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x
4) Changes to a oved b ilding plans that affect compliance to the current Washington State Energy Code(WSEC), ventilation and Indoor Air
Quality Cod ( A ilding/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
X
5) Deferred Lbmittal has been approved as follows:
1) Building structural calculations, prepared by the structure engineer, AND final foundation design, prepared by PCS Structural Solutions, shall be
submitted and approved by the Mason County Building Department prior to foundation inspection requests.
2) Special I (ec ion authorization shall be submitted and approved prior to inspection requests.
X 1� '(
6) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to
construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are
removed, ap vaI w. ''I not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and
collect d b on County Building Department prior to any further inspections being performed or approvals granted.
X
7) CONS UCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conformanc§yvith the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Maso Co lui g Inspector shall be made prior to requesting additional inspections.
X
8) All buil ing permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to requgsi a fi a inspection or to obtain approval will be documented in the legal property records on file with Mason County
P PP 9 P P Y ou ty as being
non-co pli i�h on County ordinances and building regulations.
X
COM2007-00061 3 of 8
9) PER TITLE 14 MASON COUNTY BUILDING CODE-CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS - 14.17.110:
A fire appara access road in excess of 14% grade and more than 150' to new residential or commercial structures will require an automatic fire
sprinkler sy teyn i lied. Contact the Mason County Fire Marshal at(360)427-9670, extension 273, for further information.
x
10) The use, handling and storage of hazardous materials or f ry( ble and combustible liquids in excess of 10 gallons is not allowed without the
approval of the Mason County Fire Marshal. X //
11) Provisions for surface/subsurface drainage control mu be implemented with new construction or development on site and MUST NOT adversely
impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements
of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a
driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450.
For any construc4NAVVAILABLE
h is,, roposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review
future planned w 1' affect your project.
X
12) IF CITY SE IR AT TIME OF OCCUPANCY AN ON SITE SEPTIC SYSTEM MUST BE INSTALLED.
X J W
13) All approved plans are required to be on-site for inspection purposes. If inspection is called for and Ve
re not on site, Approval WILL NOT be
granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will and collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X
14) All property lines shall be clearly identified at the time of foundation inspection. X
15) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential r ks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-(3982 he pe n signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
16) Per 2003 IR SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS- R905.1 Roof covering application. Roof coverings shall be
applied i a c r a e with the applicable provisions of this section and the manufacturer's installation instructions.
X
17) Per 2003 IRC -SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the
minimum wi loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE
1609 B N PEED (3-SECOND GUST) the wind speed for Mason County is 85 MPH.
X f`(
18) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL
NOT be grante . n addit o , a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason
County Bu ep rt rt prior to any further inspections being performed or approvals granted.
X
19) Recyclable mater4rs Solid Waste Storage: Space shall be provided for the storage of recycled materials and solid waste. The storage area
shall be design d o e t h needs of the occupancy, efficiency of pick-up, and shall be available to occupants and
haulers.X
COM2007-00061 4 of 8
20)' International Buildig Code CHAPTER 17: IN ADDITION TO THE INSPECTION REQUIRED IN IBC, SECTION 109, THE OWNER OR THE
ENGINEER R ARCHITECT OF RECORD ACTING AS THE OWNER'S AGENT SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS
WHO SH L ROVIDE INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF WORK LISTED UNDER CHAPTER 17. THE SPECIAL
INSPECT �UZS & RESPONSIBILITIES SHALL BE AS SPECIFIED IN CHAPTER 17.
X
21) Washin ton State Energy Code Compliance is approved as follows:
ENVELOPE: Prescriptive Table 13-1, Other fuels
The building envelope shall be insulated as follows:
Wall insulation R-19, Ceiling insulation R-30, slab insulation min R-10, windows U-.45 or less, doors U-.60 or less. All insulation shall be installed
to the full depth of required R-value. The evidence of u-factor for windows and doors shall be available for inspection. Slab insulation shall be
installed around the entire perimeter of the heated space and shall be installed at the top of the slab and extend downward to the top of footing.
MECHANICAL SYSTEM:
Approved as shown on approved building plans.
LIGHTING:
Approve s show on approved building plans.
X
22) The mechanical system for which energy consumption, performance, or mode of operation are regulated by the 2001 Washington State Energy
Code (WSEC) and Ventilation And Indoor Air Quality Code (VIAQ) shall be tested to ensure that control devices, equipment and systems are
calibrated, adjusted and operate in accordance with approved plans and specifications. Drawings and notes shall require commissioning in
accordance with WSEC section 1416.4.
Lighting controls shall be tested to ensure that control devices, components, equipment and systems are calibrated, adjusted and operate in
accordance with the approved plans and specifications. A complete report of test procedures and results shall be prepared and filed with the
owner. Dr Ang notes s all require commissioning in accordance with WSEC 1513.7.
X N�'/J )
23) Acces ble route within the site shall be provided from public transportation stops, accessible parking and accessible passenger loading zones. At
least one accessible route shall connect accessible buildings, accessible facilities, accessible elements and accessible spaces on the same site.
An accessible route shall be provided to each portion of the building and to accessible building entrances.
All accessible elements shall be identified by the International Symbol of Accessiblity as specified in the 2003 International Building Code, Section
1110.
At least 505 f all entrances shall be accessible to persons with disabilities. Where provided, thresholds at doorways shall be 1/2-inch max.
hAroject)'I
es in eight greater than 1/2-inch in height shall shall be ramped.
X
24) Tpproved with a fire-sprinkler and monitored alarm system installed in accordance to Fire Marshal approval. The sprinkler system
shall be in e-dI and ' spected prior to the framing inspection performed by the Mason County Building Dept.
X v�
COM2007-00061 5 of 8
25)
1. A stormwater site plan with low impact development features such as pervious paving, rain garden infiltration and native vegetation, will be
created and implemented prior to development, clearing, grading or construction of any portion of the proposed development.
2. The proposal shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed
should be restored to prevent erosion and other environmental impacts.
3. Site is within a portion of the county designated as Class II Critical Aquifer Recharge Area, under Critical Aquifer Recharge Area Chapter
17.01.080 of the Mason County Resource Ordinance. All provisions of the CARA chapter shall be followed including obtaining a Mason
Environmental Permit, application of Best Management Practices on site, and an engineered stormwater site plan in compliance with Ecology's
stormwater, water quality, Hazardous Waste, wetland and solid waste program BMP, and BMPs from the departments of Health, Agriculture,
Transportation and State Conservation District Office.
4. Project applicant shall develop in compliance with Geotechnical report completed for this site by Aspect Consulting dated January 22, 2007 and
updated March 26, 2007.
5. Subject to provisions of intergovernental agreement between Mason County and Squaxin Tribe.
26) Owner or engineer or architect of record acting as a owners's agent shall employ a n independent civil engineer, licensed in the state of
Washington -to inspect the installed stormwater turps for consistency with the attached stormwater plans and BMPs. That civil engineer shall
submit written statements to the Mason Count n g Department indicating that the inspections(s) have been made, and that the final
installation is co tent with the plans. x
27) This parcel is o a smoke manage ent zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information.
X
28) Landings d Airs mus meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approve S* e I n" ensure these structures are shown and meet the setback conditions listed.
X
29) By definition, p ane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to
ensure these tur s eet the setback conditions listed.
X
COM2007-00061 6 of 8
30) 1. A stormwater site plan with low impact development features such as pervious paving, rain garden infiltration and native vegetation, will be
created and implemented prior to development, clearing, grading or construction of any portion of the proposed development.
2. The proposal shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed
should be restored to prevent erosion and other environmental impacts.
3. Site is within a portion of the county designated as Class II Critical Aquifer Recharge Area, under Critical Aquifer Recharge Area Chapter
17.01.080 of the Mason County Resource Ordinance. All provisions of the CARA chapter shall be followed including obtaining a Mason
Environmental Permit, application of Best Management Practices on site, and an engineered stormwater site plan in compliance with Ecology's
stormwater, water quality, Hazardous Waste, wetland and solid waste program BMP, and BMPs from the departments of Health, Agriculture,
Transportation and State Conservation District Office.
4. Project applicant shall develop in compliance with Geotechnical report completed for this site by Aspect Consulting dated January 22, 2007 and
updated March 26, 2007.
5. In accordance with discussion between Squaxin Tribe and Mason County at meeting on April 9 2007, Mason County and the Public Works
department propose to work with the Squaxin Indian Tribe to craft a Memorandum of Understanding between the two governments, relating to
proposed project measures, which further reduce impact to the aquifer beyond that of usual development impact through a series of additional
measures. These proposed measures and the memorandum are being developed, but would include such measures as low impact development,
and minimizing w r withdrawal through conservation measures, pervious pavement, stormwater infiltration, rain gardens and native vegetation,
and proposing to o up to City of Shelton water when it becomes available. Although this proposed Memorandum of Understanding is still under
way as of this the understanding of the parties that it shall be completed and in place prior to the issuance of building permits for this
project.x
31) Building 4 &6 will n hav a covered parking area. This was an alternate
and was not acce b e county. The scope of work will be from grid
lines A-E 1-3.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress in§pection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress insp on.The owner or the gent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and ru ure for revi and i spection.
OWNER OR AGENT: DATE:
COM2007-00061 7 of 8
CONCRETE MECHANICAL MANUFACTURED HOME D
pDate B y —...__.. O
Footings/Setbacks Gag Piping Ribbons
o Z
y n
Interior Date By Interior-Date• *N616 BY Date B
Z�1� '
Exterw Date By Exterior-Date By Set-up O
Point Load/Isolated Footings INSULATION Data By Z
BG/SLAB INSULATION ------- I
Date By Data By FIRE DEPARTMENT
Foundation Walls C
Floors Date By C
DAMP. By Data By DECKS co
r
FRAMING Walls Date By f7
Date I 1 hp pis By to Data By PROPANE TANKS
PLUMBING vault Date _ By tl _..� _— 0
L't �, Date By OTHER X
Groundwork I It,101 Attic C/)
Date By Date By Type
Date By
o.w.v DRYWALL Type: O
Date BY ` Int.Brace Wall Date By 0
17
Date By FINAL INSPECTION p
Water Line Fire Sops ration V
Date By Date By Data 110 By K� C
Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By - Coirriments
.S'
6 � . a
e 1 L I I I't I I I io cr1 l,d�
AX4 4S S 114140 I S� 10
00
0
00
CO M D-? klis h �y
Building Permit # ���0
MASON COUNTY
BUILDING III 426 W. CEDAR
SHELTON, WASHINGTON 98584
(360) 427-9670
CORRECTION NOTI E
Job Location 100 P k% i C 1,i bi'k; �,
This structure has been inspected by Mason County Building Department
and the following VIOLATION of County Laws and Ordinances has been
found: Items Listed below must be corrected to gain code compliance
Hi I uu-et, Covce, ov% Altirtk Ijzi(
.H vcc-(' �'ti ,',L
awl Droa%' S
1 C
1?9 U► 'fJ CC>LA 01 t cc 1 T� tic&
C.
4
c
J
r �
You are hereby notified that the above corrections shall be made
BEFORE PROCEEDING WITH ANY FURTHER WORK
�1 Call for re-inspection when corrections are made before continuing
(❑�Make corrections, items will be checked on next inspection
❑ OK to
❑ This is not a complete inspection Department
Date Inspector
01040 N44T MnV THFolk, T
" ,�'
67
Building Permit # MASON COUNTY
BUILDING 111 426 W. CEDAR
SHELTON, WASHINGTON 98584
(360) 427-9670
CORRECTION NOTICE
Job Location rkl ' Wdf V- 3 2d
This structure has been inspected by Mason County Building Department
and the following VIOLATION of County Laws and Ordinances has been
found: 1�11 Items Listed below must be corrected to gain code compliance
6. j-J 111, -ok
4, 1 1'yv,'��� �. c,> a� ►'c/�d� 6 ti STll•+.w� t G✓Z Sew. +1
Il
You are hereby notified that the above corrections shall be made
BEFORE PROCEEDING WITH ANY FURTHER WORK
❑ Call for re-inspection when corrections are made before continuing
❑ Make corrections, items will be checked on next inspection
❑ OK to
❑ This is not a complete inspection Department /�w
Date Inspector j ►t�
■ *0 NOOT F, MOOV THI, TALL*
TACSystems PDATE AGE 12/4/08
- UNIT EF-402
AREA
AIR MOVING EQUIPMENT DATA cm
SERVED: L'' CHEM STORAGE 402,VEHICLE STORAGE 403
FAN EF-402 EQUIPMENT MFG. GREENHECK
EQUIP. LOCATION ROOF MODEL LBP-21-10-X
TYPE/SIZE SERIAL NUMBER 1136 1999 0806
FAN DATA
SPECIFIED ACTUAL FAN SHEAVE AK64
TOTAL CFM-FAN 5000 4123 FAN SHAFT 3/4"
TOTAL CFM-OUTLET 5000 4123 BELT SIZE AP48
FAN RPM 883 869 QUANTITY 1
ESP 0.25 .07" SHAFT C/C 17 1/2"
SUCTION SP .06,
DISCHARGE SP .01" MOTOR SHEAVE VP34S
MOTOR SHAFT 5/8"
SHEAVE ADJ. 0 TO
MOTOR DATA
MOTOR MFG. MARATHON SPECIFIED ACTUAL
MOTOR HP 1 VOLTAGE 115 119
SERVICE FACTOR 1 AMPERAGE 13.4 11.8
PHASE/Hz 1/60 BHP
HEATER SIZE/RATING THERMALLY PROTECTED MOTOR RPM 1725 1755
MOTOR FRAME# 56Z SPEED
DIFFUSER AND GRILLE TEST SHEET
AREA SERVED NO. CODE SIZE AK DESIGN INITIAL FINAL
FPM CFM FPM CFM FPM CFM
402 E1 EG 24X16 2.53 988 2500 1547 3913 833 2107
403 E2 EG 24X16 2.53 988 2500 158 399 797 2016
5000 4312 4123
REMARKS:
FORM 2A