HomeMy WebLinkAboutCOM2007-00060 Building 3 Final Sign Shop - COM Permit / Conditions - 1/5/2010 • MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 edar P.O. Box 186 Phone: (360)427-9670,ext.352
IP4 Shelton, WA 98584
COMMERCIAL BUILDING PERMIT COM2007-00060
OWNER: MASON COUNTY PUBLIC WORKS RECEIVED: 5/25/2007
CONTRACTOR: ROGNLIN'S, INC. LICENSE: ROGNL**342LF EXP: 8/1/2009 ISSUED: 9/21/2007
SITE ADDRESS: 100 W PUBLIC WORKS DR BLDG E SHELTON EXPIRES: 3/21/2008
PARCEL NUMBER: 420021000010
LEGAL DESCRIPTION: PCL 2 OF BLA 06-72
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
SIGN SHOP - Building 3 Intersection of Hwy 101 & Hwy 102.
General Information Construction&Occupancy Information
No.of Units: Type of Constr.: II
Type of Use: sign shop Insp.Area:Type of Work: NEW Fire Dist.: 16 No. of Bathrooms: 1 Occ. Group: F1/S2
Valuation: $ 404,147.44 No.of Stories: 1 Occ. Load: 28
Building Height: 22
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size: cov stg: 1,232
Model: Width: Building: 6,884
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp. Plan Desig.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2007-00060 Please refer to the following pages for conditions of this permit. 1 of 8
Plumbing Fixtures Mechanical Fixtures FEES
Type, Qty. Type Qty. Type By Date Amount Receipt
Lavatories 1 Unit Heater 1 EH Plan Review TIn/ siA/,>nn7 T.75 nn C1,nn7nn
Water Closets(Toilets) 1 Ventilation Fan 1 Plan Check Fee ni r` 7/1,A/7nn7 T,1 75R 1a C1gnn7nn
Water Heaters 1 Non-Res. Energy Code ni r. 7/1Annn7 4tad nn R17nn7nn
Drinking Fountain 1 UFC Plan Check Fee ni r 7/1,A/7nn7 -ZA7R n7 C1 gnn7nn
Building State Fee ni r 7/1'A/7nn7 u cm C17nn7nn
Building Permit Fee ni r. 7H,A/9nn7 .50 7n1 7r, C19nn7nn
Mechanical Fee ni r 7/1'3/7nn7 T.7d 75 C17nn7nn
Mechanical Base Fee ni r. 7/1 4/7nn7 An C1,2nn7nn
Plumbing Fee ni r. 7/1A/7nn7 -in An C17nn7nn
Plumbing Base Fee ni r. 7/1'119nn7 nn c1')nn7nn
Total $5,581.81
CASE NOTES FOR
COM2007-00060
CONDITIONS FOR
COM2007-00060
COM2007-00060 2 of 8
1) 1. A stormwater site plan with low impact development features such as pervious paving, rain garden infiltration and native vegetation, will be
created and implemented prior to development, clearing, grading or construction of any portion of the proposed development.
2. The proposal shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed
should be restored to prevent erosion and other environmental impacts.
3. Site is within a portion of the county designated as Class II Critical Aquifer Recharge Area, under Critical Aquifer Recharge Area Chapter
17.01.080 of the Mason County Resource Ordinance. All provisions of the CARA chapter shall be followed including obtaining a Mason
Environmental Permit, application of Best Management Practices on site, and an engineered stormwater site plan in compliance with Ecology's
stormwater, water quality, Hazardous Waste, wetland and solid waste program BMP, and BMPs from the departments of Health, Agriculture,
Transportation and State Conservation District Office.
4. Project applicant shall develop in compliance with Geotechnical report completed for this site by Aspect Consulting dated January 22, 2007 and
updated March 26, 2007.
5. In accordance with discussion between Squaxin Tribe and Mason County at meeting on April 9 2007, Mason County and the Public Works
department propose to work with the Squaxin Indian Tribe to craft a Memorandum of Understanding between the two governments, relating to
proposed project measures, which further reduce impact to the aquifer beyond that of usual development impact through a series of additional
measures. These proposed measures and the memorandum are being developed, but would include such measures as low impact development,
and minimizing water withdrawal through conservation measures, pervious pavement, stormwater infiltration, rain gardens and native vegetation,
and proposing to h ok u "to City of Shelton water when it becomes available. Although this proposed Memorandum of Understanding is still under
way as of this dat it�ise understanding of the parties that it shall be completed and in place prior to the issuance of building permits for this
project.x
2) Owner/Agen is re7ponsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
14.28. I
X 1'
3) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND
OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OfZ�f�C r PANCY WOULD
RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x
4) Changes to appr ved bu)lding plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air
Quality Code ( I Q) ilding/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
X �-
5) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to
construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are
removed, ap pval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and
collected be on County Building Department prior to any further inspections being performed or approvals granted.
X
6) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conformance wfth the iptgrnational codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Mason C u tSr �it inA Ospector shall be made prior to requesting additional inspections.
COM2007-00060 3 of 8
7) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
non-compliant w" h Mas County ordinances and building regulations.
X
8) A separate p�P';_'_w
s required for the fire alarm system, application must be made an the permit issued prior to installation. The system must be
NFPA 72 coan ully monitored by a UL certifed monitoring Co.
Xo"
A separate permit i required for the fire sprinkler system, application must be made and the permit issued prior to installation. The system must be
NFPA 13 co pli
X
3A20BC fire extinguis rs are required to be installed, the maximum travel distance in any direction is 75 feet. The unit is required to be mounted
no more than inc abov the floor to the top of the unit.
X
A key box is required to be installed on the e r of ' building per 2003 IFC chapter 5 section 506. Please contact the local fire district for
information and inspection. X �_.r��
Fire protection equipement shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and
valves or fire detec-4i6 , suppression or control elements shall be identified for use of the fire department. Approved signs required to identify fire
protection equ t n equipement location, shall be constructed of durable materials, permanently installed and readily visible.
X
9) PER TITLE 14 MASON COUNTY BUILDING CODE-CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS- 14.17.110:
A fire apparatus access road in excess of 14% grade and more than 150'to new residential or commercial structures will require an automatic fire
sprinkler system i 'called. Contact the Mason County Fire Marshal at(360)427-9670, extension 273, for further information.
x
10) The use, handling and storage of hazardous materials or flammabl fl cpmbfistible liquids in excess of 10 gallons is not allowed without the
approval of the Mason County Fire Marshal. X
11) The approval of this project is subject to the recommendations and specifications outlined in the attachedF
otechnical report or assessment.
Structures and/or land modifications (grading, cuts, fills, etc.) required in the geotechnical report/ass qt, a require a seperate permit.
The geotechincal report/assessment shall remain attached to the approved building plans. X
12) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely
impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements
of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a
driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450.
For any construction which i , posed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review
future planned work which a t your project.
X
COM2007-00060 4 of 8
13) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are t on site, Approval WILL NOT be
granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be char d nct�bllected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X L
14) All property lines shall be clearly identified at the time of foundation inspection. X
15) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-0982. The pe n si ning this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
16) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-098 he pperson signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
17) Retaining walls needed to support a surcharge such as structur s oadsl r to support slopes, shall require a separate building permit and
approval prior to construction of the retaining wall. X
18) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL
NOT be granted. In adjdition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason
County Building Dep ent iiir to any further inspections being performed or approvals granted.
X
19) Recyclable materials & Solid Waste Storage: Space shall be provided for the storage of recycled materials and solid waste. The storage area
shall be designed to rr t the ne ds of the occupancy, efficiency of pick-up, and shall be available to occupants and
haulers.X
20) International Buildig Code CHAPTER 17: IN ADDITION TO THE INSPECTION REQUIRED IN IBC, SECTION 109, THE OWNER OR THE
ENGINEER OR ARCHITECT OF RECORD ACTING AS THE OWNER'S AGENT SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS
WHO SHALL PROVIDE INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF WORK LISTED UNDER CHAPTER 17. THE SPECIAL
INSPECTORS DUE I? & rONSIBILITIES SHALL BE AS SPECIFIED IN CHAPTER 17.
X ` /
21) Washington State Energy Code Compliance is approved as follows:
ENVELOPE: Prescriptive, Table 13-1. Electric- Rooms 301 & 303, Other fuels rooms 304, 305, 306, 307, & 308. All other rooms shall be
unheated.
The building envelope shall be insulated as follows:
Wall insulation R-19, Ceiling insulation R-30, slab insulation min R-10, windows U-.40 or less (U-.45 u-factor in rooms heated by other than electric
fuels), doors U-.60 or less. All insulation shall be installed to the full depth of required R-value. Evidence of u-factor for windows and doors shall
be available for inspection. Slab insulation shall be insulated around the entire perimeter of the heated space.
MECHANICAL SYSTEM:
Approved as shown on approved building plans.
LIGHTING:
Approved as shown app ved building plans.
X
COM2007-00060 5 of 8
22) The mechanical system for which energy consumption, performance, or mode of operation are regulated by the 2001 Washington State Energy
Code (WSEC) and Ventilation And Indoor Air Quality Code (VIAQ) shall be tested to ensure that control devices, equipment and systems are
calibrated, adjusted and operate in accordance with approved plans and specifications. Drawings and notes shall require commissioning in
accordance with WSEC section 1416.4.
Lighting controls shall be tested to ensure that control devices, components, equipment and systems are calibrated, adjusted and operate in
accordance with the approved plans and specifications. A complete report of test procedures and results shall be prepared and filed with the
owner. Drawing not 'shall require commissioning in accordance with WSEC 1513.7.
X �1
23) This project is approved with a fire-sprinkler and monitored alarm system installed in accordance to Fire Marshal approval. The sprinkler system
shall be installed and ipspected prior to the framing inspection performed by the Mason County Building Dept.
X '
24) Deferred submittal has been approved as follows:
1) Building structural calculations, prepared by the structure engineer, AND final foundation design, prepared by PCS Structural Solutions, shall be
submitted and approved by the Mason County Building Department prior to foundation inspection requests.
2) Special Inspectio uthorizetion shall be submitted and approved prior to inspection requests.
X
25) Accessible route within the site shall be provided from public transportation stops, accessible parking and accessible passenger loading zones. At
least one accessible route shall connect accessible buildings, accessible facilities, accessible elements and accessible spaces on the same site.
An accessible route shall be provided to each portion of the building and to accessible building entrances.
All accessible elements shall be identified by the International Symbol of Accessiblity as specified in the 2003 International Building Code, Section
1110.
At least 50% of all entrances shall be accessible to persons with disabilities. Where provided, thresholds at doorways shall be 1/2-inch max.
height. Changes in ighX greater than 1/2-inch in height shall shall be ramped.
x
b
COM2007-00060 6 of 8
26)
1. A stormwater site plan with low impact development features such as pervious paving, rain garden infiltration and native vegetation, wiN be
created and implemented prior to development, clearing, grading or construction of any portion of the proposed development.
2. The proposal shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed
should be restored to prevent erosion and other environmental impacts.
3. Site is within a portion of the county designated as Class II Critical Aquifer Recharge Area, under Critical Aquifer Recharge Area Chapter
17.01.080 of the Mason County Resource Ordinance. All provisions of the CARA chapter shall be followed including obtaining a Mason
Environmental Permit, application of Best Management Practices on site, and an engineered stormwater site plan in compliance with Ecology's
stormwater, water quality, Hazardous Waste, wetland and solid waste program BMP, and BMPs from the departments of Health, Agriculture,
Transportation and State Conservation District Office.
4. Project applicant shall develop in compliance with Geotechnical report completed for this site by Aspect Consulting dated January 22, 2007 and
updated March 26, 2007.
5. Subject to provisions of intergovernental agreement between Mason County and Squaxin Tribe.
27) 'Owner or engineer or architect of record acting as the owners's agent shall employ a n independent civil engineer, licensed in the state of
Washington -to inspect the installed stormwater features for consistency with the attached stormwater plans and BMPs. That civil engineer shall
submit written statements to the Mason County Pla 'ng partment indicating that the inspections(s) have been made, and that the final
installation is consistent with the plans. x
28) This parcel is locate in)a smoke management zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information.
X —�'
29) Retaining walls needed to support a surcharge such as structuress, rjto support slopes, shall require a separate building permit and
approval prior to construction of the retaining wall. X - ` �
30) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to
ensure these structu meet the setback conditions listed.
X C .f
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress ins ection.The owner or a agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described property an ucture for review d inspection.
if,
OWN ER OR AGENT: DATE:
COM2007-00060 7 of 8
Fr
CONCRETE MECHANICAL gy L MANUFACTURED HOME
Footings (Setbacks DateGasPlpfng Ribbons
interior Date By Interior-Date By Dale By
Exterior Date By Exterior-Date B Set-up
Point Load I Isolated Footings INSULATION Data By
Date By Data SLAB INSULATION
By f1RE DEPARTMENT
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault Data lay
Data By OTHER
Groundwork Attic
Date By Date By Type:
Date By
D.W.v DRYWALL Type:
Int Brace Wall irate By
-v Date By Date By FINAL INSPECTION _
2 Water Line Firs Soperatlon
8 Bate By Date By Date By
Pass or Request Inspect.
° Type of nsp. Fail Date Date Done By Comments
Z Dr L-01,
o
o
CD
th
.. .. ._. .....
Wit
0
IA i � J Spy
' go
1 n�11 r
CONCRETE MECHANICALCei arm MANUFACTURED HOME
N CA
o Date �/410$ By O
Footin • ack Gas Piping Ribbons z
o Interior Date By Interior-Date By Date By 0
CF)o Exterior Date By Exterior-Date B Set- 0
Point load l Isolated Footings INSULATION Date By z
BG 1 SLAB INSULATION
Date By Data By FIRE DEPARTMENT
Foundation Walls C
Floors Date BY C
Date, By Data BY DECKS ca
FRAMING walls Date By n
Date It Ito 6,6/ By LZI( Data By PROPANE TANKS
PLUMBING vault Date By O
Date By
Groundwork wo ii n, D� Attic OTHER
Date By Date By Type.Data By
o.w.v
DRYWALL Type. O
Date B l Int.Brace Wall Date Byic
y Date By N
6 FINAL INSPECTION O
Water Line Fire Soperation O
Date By 1,. Date By Date I j IU By �Q�C_ 4
O
Pass or Request Inspect. CD
Type of Insp. Fail Date Date Done By Comments c
-4 o -ems`u� 14,
-7 36 10c"
ay— -5 09 ai 1,41C/ I,5 A�A1te is OV- As
13A C"-fr,c(cre- t„J, t ,p1� o �,rurjrt�
0 ,
Z)w v e. s S 61161o . w z b
�cs'C .J— -
u
1,0 cl i"n tJJ,l k;- vi ►Ili CVA IY.
co
oD
v
ROO k 4sz
r�
/00 &q " s'9 N slid�
Building Permit # MASON COUNTY
BUILDING 111 426 W. CEDAR
SHELTON, WASHINGTON 98584
(360) 427-9670
CORRECTION NOTICE
Job Location 106 a
This structure has been inspected b Mason Count Building Department
P Y Y 9 p
and the following VIOLATION of County Laws and Ordinances has been
found: Items Listed below must be corrected to gain code compliance
pre)
1 I
<2N
,'- del-
L21focluraP ob5exyahpnn vita
�b' &&e rloAthn
You are hereby notified that the above corrections shall be made
BEFORE PROCEEDING WITH ANY FURTHER WORK
*,Call for re-inspection when corrections are made before continuing
❑ Make corrections, items will be checked on next inspection
❑ OK to
❑ This is not a complete inspection Department g L6
Date �Il �I Inspector
moos NOT MOV THINom, T ' ,*w
TAC Systems DATE 12/4108
� PAGE 3
UNIT EF-302
AIR MOVING EQUIPMENT DATA
AREA O�D 4. 2
SERVED: BLDG 3 MAINTNANCE
FAN EF-302 EQUIPMENT MFG. GREENHECK
EQUIP. LOCATION ROOF MODEL LBP-14-3-X
TYPE/SIZE SERIAL NUMBER 1136 1997 0806
FAN DATA
SPECIFIED ACTUAL FAN SHEAVE 5"O.D.
TOTAL CFM-FAN 1800 1792 FAN SHAFT 3/4"
TOTAL CFM-OUTLET 1800 1792 BELT SIZE 41-420R
FAN RPM 1118 1080 QUANTITY 1
ESP 0.38 0.06 SHAFT C/C 14 1/4"
SUCTION SP 0.05
DISCHARGE SP 0.01 MOTOR SHEAVE VP34S
MOTOR SHAFT 1/2"
SHEAVE ADJ. 1/2 TO
MOTOR DATA
MOTOR MFG. MARATHON SPECIFIED ACTUAL
MOTOR HP 1/3 VOLTAGE 115 119
SERVICE FACTOR 1.15 AMPERAGE 6.6 6.47
PHASE/Hz 1/60 BHP
HEATER SIZE/RATING THERMALLY PROTECTED MOTOR RPM 1725 1755
MOTOR FRAME# 56Z I ISPEED
DIFFUSER AND GRILLE TEST SHEET
AREA SERVED NO. CODE SIZE AK DESIGN INITIAL FINAL
FPM CFM FPM CFM FPM CFM
302 E1 OPNG 16X12 1.26 714 900 492 619 661 832
302 E2 OPNG 16X12 1.26 714 900 499 628 762 960
1800 1247 1792
REMARKS:
FORM 2A