HomeMy WebLinkAboutCOM2007-00060 - COM Engineering / Geo-Tech Reports - 12/13/2007 WIS DATE 1/21/08 NO. 8071
WELDING INSPECTION SERVICES
PROJECT Maintenance Facility Building#3
Inspection, NOE,Testing
P.O.BOX 1044 LOCATION Mason County, Shelton WA
SUGUAMISH,WASHINGTON 98392
(360) 697-1771 CONTRACTOR Rognlin OWNER Mason County
FAX (360) 697-7316
WEATHER Clear TEMP. 29 F
TO PRESENT AT SITE Contractor
Krazan and Associates,Inc.
Rognlin Inc. — —
PERMIT NO. COM2007-00060 Building#3
Building Official-Mason County
Krazan Job No. 106-07-228 SPECIAL HS BOLTING INSPECTION
Requested by Krazan for Code required special HS bolting inspection at the project. Arrived at the site 0900
hours. Reviewed drawing details,pre-engineered building, Behlen Mfg. #M5983. Eleven(11) frames with
installed A325 HS bolted connections. Findings:
1. Specifications call for"snug tight"tensioning A325 bolted connections, main and end frames.
2. A325 3/4x2 %2 HS bolts installed,YHC Mfg.
3. VT(visual) inspected HS bolted connections, HS bolts installed per specifications and connection plates
tight together.
4. HS bolting conforms to requirements.
AM;
QG 1
IMWETFi A.UAVENS
9306 91
Ken Havens, Senior Inspector, AWS/CW1, ASNT III SIGNED
(10/28/2008) Larry Waters-CONCRETE.pdf Page 7
Krazan & Associates, Inc. 1230 Finn Hill Rd NW Suite A, Poulsbo, WA 98370 (360)-598-2126
Project No. 106-07228 Cyl.Code P13592 Pour Date 12-13-2007 Report No. 28156
weather OVERCAST Jurisdiction MASON COUNTY Permit No. BLD 2007-00060
Project MASON C OU N TY MAIN T FAC. Engineer r�
Location SH ELTON, WA Architect
client MASON COUNTY PW contractor R OGL INS
Field Data Site FAx Reported Batch Data
Supplier MILES Plant No. 208 Cement Type I &II
Concrete X Mortar Grout Flex Beams Design Actual X
Prisms Grouted Ungrouted Other Nx No. 02550
Conc. Air Corn.lbs. 514
Temp. Temp. Unit F.Ash lbs. -
Tme Truck# Ticket# %Au Skimp (F) (F) WL
8:15 M022 135420 5 65 37 - C.agg.lbs. -
C.agg.lbs.2 1854
C.age.lbs.3 -
Sand lbs. 1486
Water 28
Placemern Area
Admixture 16
Footings Walls Columns Grade Beams Other 30
SlablDeck Slab Pilings Other
Air Ent.(oLcwt.)
Grids BLDG 3 SLAB ON GRADE -EAST LINES C-L, 1-3.
INSPECTED PUMP PLACEMENT, VIBRATION Water Added on Job(gals.) 10
R ESTEEL IN SPEC TED BY P.SEELY ON 12-12-7 Field Test Methods
Remarks SAMPLED AT 50 YAR D S OF 110 YAR D S PLAC ED AT ASTM C143 ®, ASTM C138 ❑,
G-H, 1-3 ASTM C1064 [R, ASTM C173 ❑.
ASTM C31 ®. Other
inspector JON ATH AN BAAS Reviewed By
Laboratory Data Design Strength 4000 Date Specimens Rec'd. 12-14-2007
Cyl. Test Dia Length Max. comp. Tested Break Lab Test Method
Code Date Age Din. Area Load Str.(psi) Set# By Type ASTM C39 ❑
P13592- 1220ro7 7 4X8 12.57 52135 4,150 TBH 1 ASTM C109 ❑
P13592- 01/10/08 28 4X8 12.54 69675 5,560 JS 5 ASTM C El
ASTM C123231 ❑
P13592- 01/10/08 28 4X8 12.54 69400 5,530 JS 5 ASTM C1019 ❑
P13592- 01/10/08 28 4X8 12.54 69535 5,545 JS 5 Other
P13592-
Compressive
P13592-
Flexural
P13592-
P13592- Test Results
Remarks FIR91710 Conforming
Non-Conforming
Results Reviewed By Date Reviewed
Codes for Break Types: 1.Cone X
2.Cone&Split 0 3.Cone&Shear A 4.Shear 5.Columnar(Split)
(10/28/2008) Larry Waters- CONCRETE.pdf Page 13
Krazan & Associates, Inc. 1230 Finn Hill Rd NW Suite A, Poulsbo, WA 98370 (360)-598-2126
Project No. 106-07228 Cyl.Code P13638 Pour Date 12-21-2007 Report No. 33310
weather OVERCAST Jurisdiction MASON COUNTY Permit No. COM 2007-00060
Project MASON C OU N TY PW MAIN T FAC Engineer
Location SH ELTON, WA Architect
client MASON COUNTY PW contractor R OGN L IN S
Field Data Site Mix Reported Batch Data
supplier MILES Plant No. 208 Cement Type III
Concrete X Mortar Grout Flex Beams Design Actual X
Prisms Grouted Ungrouted Other Nix No. 0255A
Conc. Air Cem.lbs. 512
Temp. Temp. Unit F.Ash lbs. -
Tme Truck# Ticket# %Air Slump (F) (F) wt.
7:35 M081 24231 5.1 5 55 36 - C.age.lbs. 1873
C.agg.lbs.2 -
C.ape.lbs.3 -
Sand lbs. 1415
Water 26.1
Placement Area
Admixture 62.0
Footings walls Columns Grade Beams
Other 16
SlablDeck Slab Pilings Other
Air Ent.(ozlcwt.) 2.1
Grids MON O SLAB A TO C AN D 1 TO 3. SAMPLED AT B, 1
TO 2. Water Added on Job(gals.) 10
Field Test Methods
Remarks 27 YAR D S PLAC ED BY PU MP, MEC H C ON SOL ASTM C143 ASTM C1064 R, ASTM C1, ASTM C173 ❑,
❑,
W/C=.41 ASTM C31 ®• Other
Inspector WILLIAM U GOLIN I Reviewed By
Laboratory Data Design Strength 4000 Date Specimens Rec'd. 12-24-2007
Cyl. Test Dia Length Max. Comp. Tested Break Lab Test Method
Code Date Age Din. Area Load Str.(psi) Set# By Type ASTM C39 ❑
P13638- 1228ro7 7 4X8 12.59 45350 3,600 TBH 1 ASTM C109 0
P1363& 01/18/08 28 4X8 12.56 61415 4,890 AC 2 ASTM C617 0
ASTM C1231 ❑
P13638- 01/18/08 28 4X8 12.56 63680 5,070 AC 2 ASTM C1019 ❑
P13638- 01/18/08 28 4X8 12.56 62545 4,980 AC 1 Other
P13638
Compressive
P1363&
Flexural
P13638-
P13638- Test Results
Remarks FR 92026 Conforming
Non-Conforming
Results Reviewed By Date Reviewed
Codes for Break Types: 1.Cone X 2.Cone&Split 0 3.Cone&Shear N 4.Shear 5.Columnar(Split)
Krazan & Associates, Inc. 20714 State Hwy. 305 N.E. Suite 3C, Poulsbo, WA 98370 (360)-598-2126
Project No. 106-07228 Cyl. Code P13592 Pour Date 12-13-2007 Report No. 28156
weather OVERCAST Jurisdiction MASON COUNTY Permit No. BLD 2007-00060
Project MASON COUNTY MAINT FAC. Engineer
Location SHELTON, WA Architect
Client MASON COUNTY PW Contractor ROGLINS
Field Data Site Mix Reported Batch Data
Supplier MILES Plant No. 208 Cement Type I & II
Concrete X Mortar Grout Flex Beams Design Actual X
Prisms Grouted Ungrouted Other Mix No. 02550
Conc. Air Cam.lbs. 514
Temp. Temp. Unit F.Ash lbs. -
Time Truck# Ticket# %Air Slump (F) (F) Wt.
8:15 M022 135420 5 65 37 - C.agg.lbs. -
C.agg.lbs.2 1854
C.agg.lbs.3 -
Sand lbs. 1486
— -- - - - Water 28
Placement Area Admixture 16
Footings Walls Columns Grade Beams Other 30
Slab/Deck Slab Pilings Other Air Ent.(oz/cwt.)
Grids BLDG 3 SLAB ON GRADE - EAST LINES C-L, 1-3. - --
INSPECTED PUMP PLACEMENT, VIBRATION Water Added on Job(gals.) 10
RESTEEL INSPECTED BY P. SEELY ON 12-12-7 Field Test Methods
Remarks•SAMPLED AT 50 YARDS OF 110 YARDS PLACED AT ASTM C143 ® ASTM C138 p
ASTM C1064 ® ASTM C173 O
G-H, 1-3 ASTM C31 ® Other —�
Items Inspected
Inspector JONATHAN BAAS Reviewed By16 <Conforming Non-Conforming
Laboratory Data Design/Strength 4000 Date Specimens Rec'd. 12-14-2007
Cyl. Test Dia Length Max. Comp. Tested Break Lab Test Method
Code Date Age Dim. Area Load Str.(psi) Set# By Type ASTM C39 �(
P13592- 12/20/07 7 4X8 12.57 52135 4,150 TBH 1 ASTM C109 0
P13592- 01/10/08 28 4X8 12.54 69675 5,560 JS 5 ASTM C617 Q
ASTM C1231 39
P13592- 01/10/08 28 4X8 12.54 69400 5,530 JS 5 ASTM C1019 0
P13592- 01/10/08 28 4X8 12.54 69535 5,545 JS 5 Other
P13592-
Compressive
P13592-
Flexural
P13592-
P13592- Test Results
X Conforming
Remarks FR 91710
Non-Conforming
Results Reviewed By ID1111 Date Reviewed ) 1 N
Codes for Break Types: 1. Cone 2.Cone&Split 3. Cone&Shear 4. Shear11 5. Columnar(Split)
Krazan & Associates, Inc. 20714 State Hwy. 305 N.E. Suite 3C, Poulsbo, WA 98370 (360)-598-2126
Project No. 106-07228 Cyl.Code P13638 Pour Date 12-21-2007 Report No. 33310
Weather OVERCAST Jurisdiction MASON COUNTY Permit No. COM 2007-00060
Project MASON COUNTY PW MAINT FAC Engineer
Location SHELTON, WA Architect
Client MASON COUNTY PW Contractor ROGNLINS
Field Data Site Mix Reported Batch Data
Supplier MILES Plant No. 208 Cement Type I I I
Concrete X Mortar Grout Flex Beams Design Actual X
Prisms Grouted Ungrouted Other Mix No. 0255A
Conc. Air Cem.lbs. 512
Temp. Temp. Unit F.Ash lbs. -
Time Truck# Ticket# %Air Slump (F) (F) Wt.
7:35 M081 24231 5.1 5 55 36 - C.agg.lbs. 1873
C.agg.lbs.2 -
C.agg.lbs.3 -
Sand lbs. 1415
Water 26.1
Placement Area Admixture 62.0
Footings Walls Columns Grade Beams 16
Other
Slab/Deck Slab Pilings Other
Air Ent.(ozJcwt.) 2.1
Grids MONO SLAB A TO C AND 1 TO 3. SAMPLED AT B, 1 TO 2. Water Added on Job(gals.) 10
Field Test Methods
Remarks 27 YARDS PLACED BY PUMP, MECH CONSOL ASTM C143 ® ASTM C138
O
ASTM C 1064 ® ASTM C 173 ❑.
W/C=.41 ASTM C31 ® Other
Items Inspected
Inspector WILLIAM UGOLINI Reviewed ByQ� X Conforming Non-Conforming
Laboratory Data Design Strength
Strength 4000 Date Specimens Rec'd. 12-24-2007
Cyl. Test Dia Length Max. Comp. Tested Break Lab Test Method
Code Date Age Dim. Area Load Str.(psi) Set# By Type ASTM C39
P13638- 12/28/07 7 4X8 12.59 45350 3,600 TBH 1 ASTM C109 ❑
P13638- 01/18/08 28 4X8 12.56 61415 4,890 AC 2 ASTM C617 0
ASTM C1231
P13638- 01/18/08 28 4X8 12.56 63680 5,070 AC 2 ASTM C1019 ❑
P13638- 01/18/08 Other
28 4X8 12.56 62545 4,980 AC 1
P13638- —
J� Compressive
P13638-
P13638- Flexural
P13638- Test Results
Remarks FR 92026 i Conforming
Results Reviewed By * Date Reviewed 3LJ-)kfJ Non-Conforming
Codes for Break Types: 1. Cone N 2. Cone&Split 11 3. Cone&Shear R 4. Shear F1 5. Columnar(Split)
WIS DATE 1/21108 NO. 8071
WELDING INSPECTION SERVICES
PROJECT Maintenance Facility Building#3
Inspection,NDE,Testing
P.O. BOX 1044
SUQUAMISH,WASHINGTON 98392 LOCATION Mason County, Shelton WA
(360) 697-1771 CONTRACTOR Rognlin OWNER Mason County
FAX (360) 697-7316
WEATHER Clear TEMP. 29 F
TO PRESENT AT SITE Contractor
Krazan and Associates, Inc.
Rognlin Inc.
PERMIT NO. COM2007-00060 Building#3
Building Official-Mason County
Krazan Job No. 106-07-228 SPECIAL HS BOLTING INSPECTION
Requested by Krazan for Code required special HS bolting inspection at the project. Arrived at the site 0900
hours. Reviewed drawing details, pre-engineered building, Behlen Mfg. # M5983. Eleven(11) frames with
installed A325 I IS bolted connections. Findings:
I. Specifications call for"snug tight" tensioning A325 bolted connections, main and end frames.
2. A325 3/4x2 '/2 HS bolts installed, YHC Mfg.
3. VT(visual) inspected HS bolted connections, HS bolts installed per specifications and connection plates
tight together.
4. HS bolting conforms to requirements.
Qc 1
I(EUPIUll A.HAVENS
00f 091
Ken Havens, Senior Inspector, AWS/CWI, ASNT III SIGNED
FIELD REPORT NO:
V%,raZarl & Associates , Inc .
GEOTECHNICAL ENGINEERING • -ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING AND INSPECTION
> CONTRACTOR:
DATE: ! l ? CO PL
PROJECT#: 14!7� 0 7 JURISDICTION:
PROJECT: t,46 C'-�� e e��f ff PERMIT#: �,�/� •�C'�'' 7`^D ���cC'
LOCATION: 129 Pd: `S, INSPECTOR: A--.'
KRAZAN PROJECT MANAGER: WEATHER: CSC/
TEMP:
07
411
2 Y 624 V s
(2 (JS,4 Y lj�` 5�"r�.E ny CS 1L) l —fin �-•r�
Equipment/Asset Number(s):
To the best of my knowledge,the above OASWAS NOT performed in accordance with the approved plans,specifications,and regulatory requirements.
Superintendent/Representative: Technician:
Serving the Western United States
1501 Field Repori.doc Revision 1
Effective Date:5125/05
Th.{..k.....wuno nmvu,•d.M lbi reoon k nre—d for the exchrsivr.n.cr.of ihr.diem.This woort may not be reproduced in anv formal without the written perndssion of the client and Krazan&Assceiates. `
_=- FIELD REPORT NO:
K aZM & Associates , Inc .
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING AND INSPECTION
_ r
DATE. t 2.� C� CONTRACTOR: �4�rt/c A S
PROJECT '_ 0 JURISDICTION: (/t'1cCSO t eJt
PROJECT: C^, SgLO Z- Sk L&t PERMIT#: 1!!p 1W) —.On00 c7 tZf06 3
LOCATION: Sh,al 4v'. INSPECTOR: ,; _
KRAZAN PROJECT MANAGER: SI"j WEATHER: C TEMP: kjp
�c.t h 'CJ^tiL'l.C° Gr T
s cJ a I ff
1 C.� l C_✓��. �Gj_ ��. �L< F�_t /V 4�.(° 1'L"4:f^ L".f't.S Q�1.r'". !'E'r a/J 1, l)
Equipment/Asset Number(s):
To the best of my knowledge,the abov�&WAS NOT performed in accordance with the oved pl s,specifications,and regulatory requirements.
Superintendent/Representative: Technician:
Serving the Western United States ,�y�
C�
1501 FWd Reporr.doc Revision 1
Effective Date:52511)5
The infomtation provided on this report is prepared for the exclusive use of the client.This report may not he reproduced in any formal without the written permission of the client and Krazan&Associates.
COMPACTION
"lliamKraZan & Associates , Inc . REPORT NO.: 20639
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING AND INSPECTION
l �
DATE: i.� 'J � 77 -_ CONTRACTOR: t
PROJECT#: to 0 Z Z` PERMIT NO: 00 6 0
PROJECT: /12, 15 D�� 5 l di INSPECTOR:_&�L�
LOCATION: 1 C -G9�1 _ _ JURISDICTION: Megsvq ('a'.
KRAZAN PROJECT MANAGER: -__ ___ - ____. WEATHER: _-C-1 e ,-— --- TEMP_ yCJ c`
❑ WASHINGTON DENSOMETER ❑ SANDCONE 2 NUCLEAR TEST ❑ OTHER qSI 3O
LOCATION MAP (�j Paved Areas (circle one): Sub /Agg /Asphalt -
ET Building Pad (s)
❑ Other
C ElTrenches (circle one): Sewer/Water/Storm Drain/Utly
- - - -� ��� 3 Curve Unified Soils Classification Max Dry Opt
Density Moisture
o- Al-,
F4-) �S
Test Elevation Location(Comments) Curve Mode& Density Moist Percent Required
Depth % Compaction
q 4 s zsz �' " r Y Cf b �l
.7 q 7 _.—
,x 2- 7 Cl Ire
Map Location: Curve Test Method: This testing does not preclude the possibility that the soil or hot-mix asphalt may be loosened by future
construction activities or rainfall events.The compaction tests were performed at the approximate
Attached Daily Avg.Stcl locations and elevations shown and indicate relative compaction at those locations. Horizontal and
Count Densities (__ vertical limits of the compacted area were determined by others.Our firm does not guarantee earthwork
Daily vg-Sta or paving construction,nor does our work relieve the contractor's responsibility to conform to the
Count moisture (D S`L.-_
approved project plans and specifications-
a�ug — 7 0
To the best of my knowledge,the abov IAS)WAS NOT performed in accordance with the app ved p ,specifications,and regulatory requirements.
Superintendent/Representative: Technician:
Serving the Western United States
1501 compaction Repmt.doc Revision 1
Effective D.IcA I/3ft
-.�-...f..�......�...,....MA...r4:.......w...e....ri fn..���r.l...............f.M d{e...T1.:..................,..t.........,.e.,,..d�..9...,r.......,fi6.....fib. .....n,.............�,.nnh.�ii...,—d V m -e k A ec i.—
Ft_-D REPORT NO: ' �.
;Czff(rZZM & Associates , Inc .
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING AND INSPECTION
DATE: CONTRACTOR: P-06rt/1-llrAl
PROJECT#: JURISDICTION: 60 e
PROJECT: G4 PERMIT#: 60/� —dDO 0
LOCATION: INSPECTOR: �1�QJQJ
KRAZAN PROJECT MANAGER: U16 WEATHER: 6C',4 57'- TEMP: 3f- y(�
o l S tTr, Af � � TO �1�i/C� :P�in�1zAjQ ro✓vel ff Z 3 t,�LG� .
I�C5L�r3Ci fi ��1��4 cr�Nt�e�T' /'3yv ),h iC"w;-t P ¢ 10e,, ¢xA4z7a 6- 6eh6oz, 0-47-i o
o D / Z16S 6e /k l da-
d G - fi 40
«JlR S
!0-7
1 SEr 0E y� ra �/1-e'er Sc�1A� s-r/1�3
d r
e=e
To Pr-1 6am?2 es4
Equipment/Asset Number(s):
To the best of my knowledge,the a e WAS WAS NOT performed in accordance with the a roved plans,specifications,and regulatory requirements.
Superintendent/Representative: Technician:
Serving the Western United &es
1501 Field Report.d- Revision I /
Effective Date:5R5/05
n_._�_______....._•...,.�.,._.,,,..,...»..,..n u.,rt....a,,.;.,.„e.,.i.t.�G..,Thfa....nrt may nrx he rcrxnduced in env format without the written ocrmission of the cfient and Krazan&Associates.
(11/13/2007) Debbera Coker- FW: Building 3-shop drawings Page 1
From: "Gary Beckner' < beckner cs-structural.com> .
I� ry 9 @p
To: <Dlc@co.mason.wa.us>, <ken.hawk@wcs-inc.com>
Date: 11/12/2007 4:39 PM
Subject: FW: Building 3-shop drawings
CC: "Bjorn Gilje" <Bjorng@HelixDesignGroup.net> v
goo
From: Gary Beckner
Sent: Tuesday, October 23, 2007 1:25 PM
To: 'Bjorn Gilje'
Subject: RE: Building 3-shop drawings
We have reviewed the Behlen submittal M5983 10/1/07 with respect to our foundation design B3.S100
permit submittal. We find that the foundation is compatible with the Behlen design, with slight comment.
1. Detail 5a/S200 for this building: '/2'A.B. with D = 7" and '/."A.B. with D = 12". No bearing angles are
required.
From: Bjorn Gilje [mailto:Bjorng@HelixDesignGroup.net]
Sent: Thursday, October 11, 2007 3:12 PM
To: Gary Beckner
Subject: FW: Building 3-shop drawings
Importance: High
Please see below note from Rognlin's this is submittal for Bldg 3 not that indicated before.
Bjorn Gilje HELIX DESIGN GROUP
bjorng@helixdesigngroup.net<mailto:rbjorng@helixdesigngroup.net> I helixdesigngroup.net
<http://www.helixdesigngroup.net/>
p.253.922.9037 I f.253.922.6499
6021 12th St E Suite 201 1 Tacoma, WA 98424
(11/13/2007) Debbera Coker- FW_Building 3-shop drawings — _ Page 211
PCS Structural Solutions
Gary Beckner, S.E., Project Manager
tacoma 253.383.2797
seattle 206.292.5076
gbeckner@pcs-structural.com
www.pcs-structural.com
From: Ryan Walsh [mailto:ryan@rognlins.com]
Sent: Thursday, October 11, 2007 3:06 PM
To: Bjorn Gilje; Lowell Cate
Cc: ken.hawk@wcs-inc.com; Floyd Plemmons
Subject: Building 3-shop drawings
Importance: High
Bjorn,
Sorry about the last email. That is not building 4. It is building 3. Please disregard.
RYAN WALSH
ASSISTANT PROJECT MANAGER
ROGNLINS, INC
321 WEST STATE STREET
ABERDEEN, WA 98520
360-532-5220
360-532-5761 FAX