HomeMy WebLinkAboutCOM2008-00148 Bldg 4B Carport Portion - COM Permit / Conditions - 11/20/2008 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)327-7262
Mason County Bldg. 3 426 W. Cedar P.E*Box 186 Phone: (360)427-9670,ext.352
IrP4 Shelton, WA 98584 - LD&
COMMERCIAL BUILDING PERMIT COM2008-00148
OWNER: MASON COUNTY PUBLIC WORKS RECEIVED: 11/20/200E
CONTRACTOR: LICENSE: EXP: ISSUED: 11/20/200E
SITE ADDRESS: 100 W PUBLIC WORKS DR BLDG C SHELTON EXPIRES: 5/20/2009
PARCEL NUMBER: 420021000010
LEGAL DESCRIPTION: PCL 2 OF BLA#06-72 PTN OF W1/2 NE.
PROJECT DESCRIPTION: AZECTIONSTOSIT — -- -----____._ .. _-_ _..►
Carport portion originally proposed under COM2007-00061 - to
BUILDING 4 p0 DC�
General Information Construction &Occupancy Information
Type of Use: COMMERCIAL Insp.Area: No.of Units: Type of Constr.: J/No.of Bathrooms: Occ. Group:
Valuation: 5�
Type Work: ACC Fire Dist.: 13 No.of Stories: / Occ. Load:
al :Sf_� +� �
9 -R ti —
�G�O� ��t�G � �C.
Buildin9 Height: ,_
74-
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp. Plan Desg.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2008-00148 Please refer to the following pages for conditions of this permit. 1 of 8
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone; (360)427-9670,ext.352
Shelton,WA 98584
0
o
COMMERCIAL BUILDING PERMIT COM2008-00148
OWNER: MASON COUNTY PUBLIC WORKS RECEIVED: 11/201200E
CONTRACTOR: LICENSE., EXP: ISSUED: 11/201200E
SITE ADDRESS: 100 W PUBLIC WORKS DR BLDG C SHELTON EXPIRES: 5/20/2009
PARCEL NUMBER: 420021000010
LEGAL DESCRIPTION: PCL 2 OF BLA#06-72 PTN OF W1/2 NE
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
open portion originally proposed under COM2007-00061 - 100 W. PUBLICE WORKDS DRIVE - BUILDING 4B.
BUILDING 46
170 x 72
E General Information Construction&Occupancy Information
Type of Use: COMMERCIAL Insp.Area: No.of Units: Type of Constr.: II
a Type of Work: NEW Fire Dist.: 13 No. of Bathrooms: Occ, Group: S2
Valuation: $ 0.00 No.of Stories: 1 Occ. Load; 1
z
Building Height: 26
0
Pre-Manufactured Unit Information Square Footage information
Make: Length: Lot Size: open area only: 12,240
Model: Width: Building:
00 Year: Serial No.: Basement: Parking Spaces:
Setback Information
Zhore4ine-&-Planning IRformatlen = -
Front; Ft. Shoreline: Ft.
o Rear: Ft. Slope: Ft. Water Body; Shoreline Desig.:
Side 1: Ft. SEPA?: Comp.Plan Desig.:
Side 2: Ft.
� Firy Ps�iar{ivn v- ivri;�-.:rv.ni:ivir
T
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
co Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
c Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
N
COM2008-00148 Please refer to the following pages for conditions of this permit. 1 of 8
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty, TYPE Qty. Type By Date Amount Receipt
N
0
o Total
Please sign, date, initial all
CASE NOTES FOR COM200$-00148 conditions and mail back
to me,
THANK YOU
CONDITIONS FOR
COM2W8-00148
1) Owner/Agen�i/se' ible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
14.28. ,[(
H
X
2) ALL CONS UCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUI EMEIM AND
a OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE 'IO��C�IJ,PANCY WOULD
0
RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE.x r /
3) Changes to ap r ved building plans that affect compliance to the current Washington State Energy Code(WSEC),ventilation and Indoor Air
0 Quality Code A ), ilding/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
X
4) Deferred bmittal has been approved as follows:
1) Building structural calculations,prepared by the structure engineer, AND final foundation design,prepared by PCS Structural Solutions,shall be
submitted and approved by the Mason County Building Department prior to foundation inspection reques(s.
c
ti 2) Special t ection authorization shall be submitted and approved prior to inspection requests.
CIA X
0 5) Any changes in construction shall be reviewed by engineer of record and submitted In writing to the Mason County Building Department prior to
n construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are
removed, proval will not be granted. In addition, a reinspection fee, based on the current fee schedule_ minimum one-hour will he rhsrnsri anti
w collected Me son County Building Department prior to any further Inspections being performed or approvals granted.
o X N
0
Go
0
0
N
.r
�' COM2008-00148 2 of 8
6) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
o conformance wit a international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
CD Mason County nq?[�spector shall be made prior to requesting additional inspections.
X JJ
7) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration.The
failure to requ t a final inspection or to obtain approval will be documented In the legal property records on file with Mason County as being
non-corn it Mgjon County ordinances and building regulations.
X )lam(
8) A separate p it is requlred for the fire alarm system,application must be made and the permit issued prior to the installation of the system. The
System mus FP 72 compliant and fully monitored by a UL certified monitoring Co.
X
A separate p it is required for the fire sprinkler system, the system is required to be NFPA 13 compliant. Application must be made and the
permit i e ri�r the installation of the system.
X
3A2013C fire yVinguis he rs are required to be installed. The maximum distance of travel can not exceed 75 feet in any direction. The maximum
N height ov ,eto o the top of the unit is 60 inches.
X
w
CD
Fire protection equipement shall be identified in an approved manner. Rooms containing controls for air-conditioning systems,sprinkler risers,
U valves or fire deector, suppression or control elements shall be identified for the use of the fire department.Approved signs required to Identify fire
z protectio em nt I lion,shall be constructed of durable materials, permanently installed and readily visible.
X
A key box ' r itto b#stalled per 2003 IFC chapter 5 section 506. Please contact the local fire district for more information an Inspection,
X Please sign, (fiat_-, initial ail
A sepa �trrri)it is re fired for any exterior fuel storage tanks. conditions anal mail baclk
OD X to me,
q
The and amounts of chemicals stored "shall not"exceed 2 ai.ef_formli THANK YU
late�Jiquid rpduct-or 100 lbg, gf�=pr.odu,n_per_yearrAU sty
- -in the Ie,_ft6rTr^Alien Eaton with public Works to Susan Payne of Helix design. This letter stated that the products are ordered about 4 times a
year so e a nis stored at any one time is 1/4 the amounts listed above.
o X
m
M
9) PER TIT E 14 MASON COUNTY BUILDING CODE -CHAPTER 14.17. STANDARDS FOR FIR APPARATI_LS ACr_.FSS RnnnS _ 1e_17.11n:
w
o A fire aDoara access road in exrenq of 1 Q% nrarle nnri more than_ 9 rn-tg ncur rw&;e4anyivl
sprinklers to inst led. Contact the Mason County Fire Marshal at(360)427-9670, extension 273, for further information.iiiry lair aiicniranc, rnr
o `
.1
0
x
N10) The use, handling and storage of hazardous materials or a rile and combustible liquids in excess of 10 gallons is not allowed without the
N approval of the Mason County Fire Marshal. X ✓7``I
COM2008-00148 3 of 8
11) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely
impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements
of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
For further Information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a
o driveway or access connectin from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450.
19 For any construction which ' roposed to be located within 25' of a Mason County road right of way,it is suggested to contact that office to review
future planned work whic y#ect your project.
X �(
12) IF CITY R NOT AVAILABLE AT TIME OF OCCUPANCY ANON SITE SEPTIC SYSTEM MUST BE INSTALLED.
X
13) All dIpproved plans are required to be on-site for inspection purposes. if inspection is called for and pla " re not on site,Approval WILL NOT be
granted. fn addition, a reinspection fee,based on the current fee schedule, minimum one-hour will b rge ' nd collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X c
14) All property IInes shall be clearly identified at the time of foundation inspection.X
15) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division.There are potential ris end monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-09 2. et
signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X �(
16) Per IRC -SECTIO 905-REQUIREMENTS FOR ROOF COVERINGS- R905.1 Roof covering application. Roof coverings shall be applied in
a. accordance with p li able provisions of this section and the manufacturer's installation instructions.
o X
v
0 17) Per 2003 IRC!SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind aEis pr scribed herein. Decreases in wind load shall not be made for the effect of shfelding by other structures. Per FIGURE
1609 BAS!,r ED(3-SECOND GUST)the wind speed for Mason County Is 85 MPH.
X
18) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site,Approval WILL
NOT be granted./tr addit' n, a reinspection fee, based on the current fee schedule,minimum one-hour will be charged and collected by the Mason
OD County Buildin pt t prior to any further inspections being performed or approvals granted.
ti
ti
ti - - 19) Recy-ptabta-mate ials- -Solid Waste.Storage: -Space shall be-provic)�d-l'or--the stQrage-of rer4clednaterials-and-solid waste- The-storage area
shall be deslgned t t t needs of the occupancy,efficiency of pick-up, and shall be available-to occupants and
c haulers.X
m
20) International ding Code CHAPTER 17: IN ADDITION TO THE INSPECTION REQUIRED IN IBC,SECTION 109, THE OWNER OR THE
ENGINEER OR ARCHITECT OF RECORD ACTING,AR THE OW WWR ArF_NT RHGI I FpepLnY WHIP np nenaE cDFr-lei inicoErTnoe
WHO SHALL P VIDE NSPECTIONS DURING CONSTRUCTION ON THE TYPES OF WORK LISTED UNDER CHAPTER 17. THE SPECIAL
11�ICPFC`Tn"Rr) T RESPOA�CfR�i`1Tl`C CUAL� Qc AC C�chICICII ttil nunnrcn ��
S c..r_ .—ta..,�i vrr i"U tv v.lAr r Lr♦ r i.
o X
.-1
c Please sign, datec, initial a!!
0
N conditiorLs and mail bac'i:
to me.
N
THANK YI§U
'� COM2008-00148 4 of 8
21) Washington State Energy Code Compliance is approved as follows:
• i ENVELOPE: Prescriptive Table 13-1,Other fuels
The building envelope shall be insulated as follows:
o Wall insulation R-19, Celling insulation R-30, slab insulation min R-10,windows U-.45 or less, doors U-.60 or less. All Insulation shall be installed
o to the full depth of required R-value. The evidence of u-factor for windows and doors shall be aval table for inspection, Slab insulatlon shall be
installed around the entire perimeter of the heated space and shall be installed at the top of the slab and extend downward to the top of footing.
MECHANICAL SYSTEM:
Approved as shown on approved building plans. Plea] a Sign, vats, Initial a'a
LIGHTING:
conditiogs and mail bac"-,
to me.Approved ass o pproved building plans. ?HANK YOU
X
22) The mechanical system for which energy consumption, performance, or mode of operation are regulated by the 2001 Washington State Energy
Code(WSEC)and Ventilation And Indoor Air Quality Code(VIAQ) shall be tested to ensure that control devices, equipment and systems are
calibrated, adjusted and operate in accordance with approved plans and specifications.Drawings and notes shall require commissioning in
accordance with WSEC section 1416.4.
Lighting controls shall be tested to ensure that control devices,components, equipment and systems are calibrated,adjusted and operate In
E-' accordance with approved plans and specifications. A complete report of test procedures and results shall be prepared and Filed with the
owner. Drawin in tejs shall require commissioning in accordance with WSEC 1513.7.
a X S /�
0
v
z 23) Accessible route within the site shall be provided from public transportation stops, accessible parking and accessible passenger loading zones. At
o least one accessible route shall connect accessible buildingsr accessible facilities, accessible elements and accessible spaces on the same site.
An accessible route shall be provided to each portion of the building and to accessible building entrances.
Alt accessible elements shall be identified by the International Symbol of Accessiblity as specified in the 2003 International Building Code, Section
1110.
00 At least 50% of all entrances shall be accessible to persons with disabilities. Where provided, thresholds at doorways shall be 112-inch max.
height. Ch es in height greater than 1I2-inch in height shall shall be ramped.
- --X _ -
d'
0 24) This project is approved with a fire-sprinkler and monitored alarm system installed in accordance to Eire Marshal approval. The sprinkler system
shall be Instal o and inspected prior to the framing Inspection performed by the Mason County Building Dept.
X
Please sign, uatZ, initial all
00 conditiops and mail bac'-,
0
N
to me.
?HANK YOU
N
COM2008-00148
5of8
25)
1. A stormwater site plan with low impact development features such as pervious paving, rain garden infiltration and native vegetation, will be
created and implemented prior to development,clearing,grading or construction of any portion of the proposed development.
0 2. The proposal shall be required to control erosion during construction, Removal of vegetation should be minimized and any areas disturbed
should be restored to prevent erosion and other environmental Impacts.
3. Site is within a portion of the county designated as Class II Critical Aquifer Recharge Area,under Critical Aquifer Recharge Area Chapter
17.01.080 of the Mason County Resource Ordinance. All provisions of the CARA chapter shall be followed including obtaining a Mason
Environmental Permit, application of Best Management Practices on site, and an engineered stormwater site plan in compliance with Ecology's
stormwater,water quality, Hazardous Waste, wetland and solid waste program BMP, and BMPs from the departments of Health, Agriculture,
Transportation and State Conservation District Office.
4. Project applicant shall develop in compliance with Geotechnical report completed for this site by Aspect Consulting dated January 22, 2007 and
updated March 26, 2007.
5. Subject to provisions of intergovernental agreement between Mason County and Squaxin Tribe. x
26) Owner or engineer or architect of record acting as the owners's agent shall employ a n independent civil engineer,licensed in the state of
Washington-to Inspect the installed stormwater fe res for consistency with the attached stormwater plans and BMPs. That civil engineer shall
submit written statements to the Mason County P ng f epartment Indicating that the inspections(s) have been made,and that the final
installation is consistent with the plans. x J'
F
27) Landings and rs must meet the same setback conditions as any permitted structure;and,must be shown on your site plan. Please check your
w Approved Si I n t ensure these structures are shown and meet the setback conditions listed.
a x
0
Z 28) By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your"Approved Site Plan"to
ensure the ctures meet the setback conditions listed.
o
x L /
FleaS
•,�e Sign, �.ua� , initial
condtti011s and mail WC '
Y-011.
0
m
M
w
0
co
0
0
N
rt'
N
COM2008-00148
6of8
29) 1.A stormwater site plan with low impact development features such as pervious paving, rain garden Infiltration and native vegetation, will be
created and implemented prior to development, clearing, grading or construction of any portion of the proposed development.
2.The proposal shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed
o should be restored to prevent erosion and other environmental impacts.
0
3.Site is within a portion of the county designated as Class 11 Critical Aquifer Recharge Area, under Critical Aquifer Recharge Area Chapter
17.01.080 of the Mason County Resource Ordinance. All provisions of the CARA chapter shall be followed including obtaining a Mason
Environmental Permit,application of Best Management Practices on site, and an engineered stormwater site plan in compliance with Ecology's stormwater, water quality, Hazardous Waste, wetland and solid waste program BMP, and BMPs from the departments of Health,Agriculture,
Transportation and State Conservation District Office.
4, Project applicant shall develop in compliance with Geotechnical report completed for this site by Aspect Consulting dated January 22,2007 and
updated March 26,2007.
5. In accordance with discussion between Squaxin Tribe and Mason County at meeting on April 9 2007,Mason County and the Public Works
department propose to work with the Squaxin Indian Tribe to craft a Memorandum of Understanding between the two governments,relating to
proposed project measures, which further reduce impact to the aquifer beyond that of usual development impact through a series of additional
measures. These proposed measures and the memorandum are being developed, but would include such measures as low impact development,
and minimizing water withdrawal through conservation measures, pervious pavement, stormwater infiltration,rain gardens and native vegetation,
and proposing to k7.1understan
oCity of Shelton water when it becomes available. Although this proposed Memorandum of Understanding is still under
way as If this d i i ding of the parties that it shall be completed and In place prior to the issuance of building permits for this
project.x
a 30) Building 4 & will not have a covered parking area. This was an alternate
o and was not acce by the county. The scope of work will be from grid
lines A-E& -3.
z X
0
This permit beoomes null and vofd if work orconstrucUon authorized is not commenced within 180 days,or If oonslruction or work is suspended for ape Hod of 180 days at anytime after work Is
commenced. Evl dance ofoontinuationof work Isa progress ins pectic,nwl thin the 180 day pedod, F1 nal I nspect Ion must be a pproved be fore bui Id Ing ca n be oocupi ad.Proof of con gnu ation of
work is by means of a progress fnspQtlon.The myna or kr agent on the owners behalf, represents that the informallon provided is accurate and grants employees of Mason County access to
the above described property an st cture for re iew a d nspectio n.
OD OWN ER OR AGENT:
DATE;
0
n
e}
- - - - - - - - --- Nie@se sign, pats, initial .all', - -
h conditiOA5 anal mail bac',..
`o me. 'UA%IV Vol
N
O
.-i
Cd
O
O
N
N
.4 COM2008-00148
7of8
O
CONCRETE MECHANICAL MANUFACTURED HOME
N _
Date
C) Footings l Setbacks Gas Piping By
Ribbons Z
o Intenor Date By Interior-Date By Dale By
�
Exterior Date By Exterior-Date By Set-up O
INSULATION ,____ c
Point Load I Isolated Footings Date By Z
BG I SLAB INSULATION
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Dale By C
Date By Data By DECKS IOU
FRAMING Walls Date By (�
Date By Da1e By PROPANE TANKS
PLUMBING vault Date By O
Date By X
OTHER X
Groundwork Attic U)
Date By Date By Type.
Date By
D.W.V DRYWALL 0
Type. O
Int.Brace Wall
Date By, Date By
Date By FINAL INSPECTION C)
WaterWater Line Fire Seperation p
Date By. Date By Dale By 9
0
Pass or Request Inspect.
Type of Insp. Fail Date Gate Done By Comments co
�4c5 SPeca,l c' .s vr(
co
0
Co