71 MASON COUNTY q/93 ENVIRONMENTAL H C ECKLIST Purpose of Checklist: The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You mu n must answer each question accurately and carefully, to the best of our knowledge. Y Y g In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of Checklist for Non-project Proposals: Complete this checklist for non-project proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL ACTIONS (part D). There is a $100.00 fee required for the processing of the checklist. Please make your check payable to "Mason County Treasurer." For non-project actions. the references in the checklist to the works "project", "applicant", and "propertyor site" should be read as " " proposal "proposer", ''affected geographic area", respectively. TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY A. BACKGROUND: 1. Name of proposed project, if applicable: 2. Name of applicant: -51,-7 ,&v,e,///C:W 3. Address b phone number of applicant b contact person: �u- 3vGz i��s' • 4. Date checklist prepared: 9�";;Iiw 93 �2 ._44 ? 5. Agency requesting checklist: 6. Proposed timing or schedule (including phasing, if applicable) : 7. Do you have any plans for future expansion, or further activity related /to or connected with this proposal? If yes, explain. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. 114, "� ", 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description. ) .J, / c' ��a �P� � 47 � v/L jet 42/ 1 TO BE COMPLETED BY APPLICANT EVALUATION FOR AMCY USE ONLY 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one) : Flat, _roling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? t - � C. What general types of soils are found on the site (for example, clay,__sand, Gravel, peat, muck)? If you know the classification of agricultural soils, specify theca and not any prime farmland. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. 2 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGMICY USE ONLY e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. NJ g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? Al- //0 h h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any. : S/pfp,.� 2. AIB: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. 4/0"� b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. � 1Ya h-P_ C. Proposed measures to reduce or control emissions or other impacts to air, if any: f y 3 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3. WATER: a. Surface: 1) Is there any surface rater body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. u 11j < ('`f e-'X" 2) Will the project require any work over, in, or adjacent to (within 200 feet) of the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicated the source of fill material. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 4/N ��d 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. L 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. 4 TO HE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Ground: 1) Will ground rater be withdrawn, or will rater be discharged to ground water? Give general description, purpose, and approximate quantities, if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example, Domestic sewage: Industrial, containing the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. �0 h C. Water Runoff (including storm water) : 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If no, describe. , /() 2) Could waste materials enter ground or surface waters? If so generally describe. ,,j 0 d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar pine, other T - shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, others water plants: water lily, eelgrass, milfoil, other 5 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. What kind and amount of vegetation will be removed or altered? C. List threatened or endangered species known to be on or near the site. /;Yah d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, -if any: -�--y�e J - j S 5. ANIMALS: a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: harkk - her eagle, other mammals: �pger, be �eoej���er fish: bass, salmon, herring, shellfish, other b. List any threatened or endangered speci s known to be on or near the site. � C. Is the site part of a migration route? If so, explain. ��,/)e/j/d W 4/ d. Proposed measures to preserve or enhance wildlife, if any: e6 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. 6 rO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Mould you project affect the potential use of solar energy by adjacent properties? If so, generally describe. ! r e4 C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. No 1) describe special emergency services that might be required. 4 e)&Z-7- 2) Proposed measures to reduce or control environmental health hazards, if any: 1^44 b. Noise. 1) What types of noise exists in the area which may affect your project (for example: traffic, equipment operation, other)? 2) What types of levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. _ 1 S �� 7 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3) Proposed measures to reduce or control noise impacts, if any: !/,5:1 "& ` //,, �� `� e ",'7 cr C�lJ / til cry /✓ 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? t` SC b. Has the site been used for agriculture? If so, describe. ^/ C. Describe any structures on the site. hVdh -E- d. Will any structures bey ddemolished? If so, what? // e. What is the currmA classification of the site? j� -,F '�C j— f /N,�.'- f. What is the current comprehensive plan designation of the site? g. If applicable, what is the current shoreline master program designation of the site? h. Has any part of the site been classified as an `environmentally sensitive• area? If so, specify. /'y Ull i. Approximately how many people would reside or work in the completed project? &v,tJ�6-7 j. Approximately how may people would the completed project displace? 8 7O BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY k. Proposed measures to avoid or reduce displacement impacts, if any: 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 9. HOUSING: a. Approximately how may units, if any, would be provided? Indicate whether high, middle, or low- income housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low- income housing. C. Proposed measures to reduce or control housing impacts, if any: F 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? b. What views in the immediate vicinity would be altered or obstructed? /yo C. Proposed measures to reduce or control aesthetic impacts, if any: NO 1-7 -e,-- 11. LIGHT AND GLARE: a. What type of light or glare will the proposal produce? What time of day would it mainly occur? �Cg Al 9 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Could light or glare from the finished project be a safety hazard or interfere with viers? C. What existing off-site sources of light or glare may affect your proposal: d. Proposed measures to reduce or control light and glare impacts, if any: 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? 110N--- b. Would the proposed project displace any existing recreational uses? If so, describe. N um c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: C�/V 6- 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so generally describe. ^j0 b. Generally describe any landmark or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. 1 C. Proposed measures to reduce or control impacts, if any: / 1e TT :Aug ;T 'sjosdwT uoT4e}sod9uss4 TOJ4uoo so aonpas o4 sasnseam pasodosd •b •sn000 pTnoA saunTon Nead uagA a,4eoTpuT 'uAouM 3I 14oafoad palaTdwoo aq4 dq pa}eiauab aq pTnoA Asp sad sdTs} seTnoTgan dusty AoH •; •agTsosap dTTeaauab os 3I LuoTIe4sodsue.z4 1Ts so 'TTes 'sagee (;o d4TuToTn alsTpawmT aq4 uT sn000 jo) asn joafosd ayT TTTM 'a •(agenTsd so oTTgnd sag4agA a4eoTpuT) agTsosap dTTesauab 'os 3I LsdeNanTsp buTpnTouT IOU '84aas-}8 so speos buT4sTxa o4 s}uawanosdmT so 's}aasls so speos Aau Aug asTnbas Tesodoad 8q4 TTTM 'p LageuTmTTa 4oaCosd aqq pTnoe dUBW AoH Lansq 4oarosd pagaTdwoo aql pTnoA saoeds buTxsed dUem AoH •o •due 3T 'sueTd ajTs uo AogS •ma}sds 4aasls 5uT4sTxa aqj of aouejeTp alemTxosdde aqT sT 4egA '4ou II LITSUB14 oTTgnd dq paAaas dT-�uas.zno a4Ts sI •q 'Aug IT 'sueTd a}Ts uo A04S •wa4sds Taaals 6uT4sTxa aqj o4 ssaooe pasodosd agTsosap Pus aTTs a4l buTAjas sdeAgbTq pus 94aaj4s oTTgnd d;Tluapl •e :NOIlVlHOdSNVSl •VT nN0 asn L3N39v Ii03 NOIivn'iva IKVOIlddV 19 a3lMdQO3 39 OIL 1 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 15. PUBLIC SERVICES: a. Mould the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so generally describe. b. Proposed measures to reduce or control direct impacts on public services, if any: 16. UTILITIES: a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. /XvivC7 b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. 17. SIGNATURE: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: 9-3 12 'n 1 WASHINGTON STATE DEPARTMENT OF o Natural Resources L;F B 1 04 v '�� JENNIFER M.BELCHER G0 '1@F&missioner of Public Lands KALEEN COTfINGHAM February 18, 1994 Supervisor Gary Yando, Director Mason County, Department of Community Development Planning-Solid Waste-Utilities P.O. Box 578 Shelton, WA 98584 RE: John Burnett's Proposed Gravel Mining Operation Dear Mr. Yando: Last month, your office requested that Mason County be designated lead agency for the SEPA environmental review, should Mr. Burnett seek a Surface Mining Reclamation Permit. Under authority vested through WAC 197-11-942, the Department of Natural Resources (DNR) will designate Mason County as lead agency under SEPA. The Departments of Ecology and Wildlife have concurred with this decision. Mason County is, and should be, in this lead role to adequately address what will be primarily "operational " issues such as noise, dust, etc. , pertaining to this proposal . DNR's role in surface mining is limited to reclamation activities. Enclosed is information DNR has received from Mr. Burnett. You should plan to process the reclamation plan, that DNR will ultimately approve, concurrently through your SEPA process. DNR is working with Wayne Brown of Quigg Brothers, operator of the site, to correct deficiencies on the proposed reclamation plan. Once the plan is acceptable, it will be forwarded to you as part of your SEPA review for the entire proposal . Please contact me at 825-1631 if you have questions. Sincerely, Bonnie B. Bunning Region Manager Warren Warfield Assistant Region Manager Resource Protection and Services WW/bh JAN94. 102 Enclosures c: Geology & Earth Resources; Gloria Mitchell , Department of Wildlife John Burnett; Scott Morrison, Department of Ecology Department of Fisheries; Skokomish Indian Tribe Don Brush, Mason County; Dave Pierce, DNR; Region File SOUTH PUGET SOUND REGION 1 28329 SE 448 ST 1 PO BOX 68 1 ENUMCLAW,WA 98022-0068 ® ,a Equal Opportunity/Affirmative Action Employer recycled paper�� '. I >LICATION FOR WASHINGTON STATE DEPARTMENTOF SURFACE MINING x.. Natu ra I Resources RECLAMATION PERMIT (Form SM-2) This application is for(check one): ❑ new permit O revision of existing permit O transfer of permit. NAME OF COMPANY OR INDIVIDUAL APPLICANT(S) TOTAL ACREAGE OF PERMIT AREA APPLIED FOR This will be the name on the permit. (Type or print in Ink.) (Include all acreage to be disturbed by mining,setbacks and buffers,and � �j 4Q )f:J�__00 �l'1 C associated activities during the life of the mine.) / i1(/� �rCj• �� ���'� `-� acres MAILING ADDRESS �f COUNTY 4�j sn AC • n-- ' .7U 2 No attachments will be accepted.Legal description of permit area: fl berd ee v) ZJ a v ivw rj lv F rY iC cxr-jG e 61 ky ec / jwn oho PfT- q -1d Telephone 5-3 3 1/4 1/4 Section Township Range SURFACE OWNERSHIP 1 S Give names, addresses, and signatures of all individuals with possessory 114 F I intereyct Iqq land.(Attach sign d copies of this document if more than one.) .� pinv� IhQ� 710 ;slur. Lµke- OrIVe 61,,e I +-ot,% W q$S£sY 1 verify that the applicant has my permission to mine from my land. Signature of owne� e Date Application fee of$650.00 for a new "� reclamation permit is herewith attached? Yes O No OWNERSHIP O IGHTS TO REMOVE MINERALS BY SURFACE Street address and milepost of surface mine MINING Give es,addresses,and signatures of all individuals with .-� f I rights.(Attach signed copies of this document more than one.) �( 001 y i Gro s Pt C Of-"\W I Ck -Ti C. P, ?o -> Id 7 y0 Zl Awd Liz ?a 0 e in W IA- "�j P I.k%', LA)A u 1 verify that the applicant has my permission to mine from this land. C(�5 � 1 Signature of owner Date Distance(miles) Direction from Nearest co unity Do you or any p n, partnership,or corporation associat Method of mining Maximum depth of mine with you now ho ,or have pyou ermit? held,a surface mining N 7e'-+ �n ' +irk ; T+ operating or reclamation permit. Yes No O,, V�Y1p( If you answered yes to the above,please list: Expected start date of mining Estimated annual production 1-75W ❑tons,or Permit Active Reclamation current Acu yds number operation or complete Estimated number of years Yes No Yes No Minerals to be mined Total quantity to be mined over life lli4ijowjo of mine(estimated): �'UC=.� ❑tons,or (�1 Ji.cu yds Have you ever had a surface mining operating or reclamation permit revoked? O Yes 2No Have you ever had a reclamation security forfeited? 0 Yes)a No If you answered yes to the above,give permit number(s) Are all of these mines now In compliance with RCW 78.44, WAC 332-18,and conditions of the permits? ❑Yes ❑No The applicant shall be considered as the permit holder for this surface mine and shall be responsible for compliance with RCW 78.44,WAC 332-18, the approved reclamation plan(Form SM-8A and attachments),and the conditions of the permit if issued by the Department of Natural Resources. Signature of company representative or individual applicant(s) Name and title of company representative (please print) Date signed # Arewo y FOR DEPARTMENT USE ONLY: Date accepted Accepted by Reclamation Permit No. 2(!;�o Application for Surface Mining Reclamation Permit(SM-2) Revised 9/93 Copy distribution:White.Olympia,Yellow-Region,Pink.Applicant STArE = x Department of Natural Resources y" OLYMPIA, WASHINGTON BRIAN BOYLE CommiWoner of Public Land, I� 9� 1889 �O 98504 1 t ENVIRONMENTAL CHECKLM Purpose of'Checklist: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions lilr Applicanis: This environmental checklist asks you to describe some basic information about your proposal. Governmental agen- cies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of' an EIS. Answer the questions briefly, with the most precise information known, or give the best de- scription you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you rcally do not know the answer, or if a question does not apply to your proposal, write "do.not know" or "does not ap- pl%". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. l'llc checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental cl'f'ccts. The agency to which you submit this checklist may ask you to explain your answers or provide additional in- formation reasonably related to determining if there may be significant adverse impact. I se ul'ehecklist for nonproject proposals: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN AD- Ilt t tt'\, cotllplele the SUPPLEMENTAL SHEET FOR NONPROIECT ACTIONS (part D). or nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read its "proposal," "proposer," and "affected geographic area," respectively. A. tt,%( RciRot ntt I. Name of proposed project, if applicable: �7 U Y tit to l f '. \.'file of applicant: QVI�S IJYOJ V ' e L)oo'►A1� i. Address :t d phone number of applicant and contact person: C U (Z4etc 7t w,, Qi;i 1,9, S3 f S-36 frg�e -deems �`�`Jel� f3rc�c,� S3� -iS3c/ )-{o►.v� e 4. Date checklist prepared: !�' �,. y3 LMV�3i 3 5. Agency requesting checklist: f,. Proposed tinting or schedule (including phasing, if applicable): 7. I)o you have an • plans for future additions, expansion, or further activity related to or connected with this proposal'' If yes, explain. � Jr ��� assI .1ns ��&410 Tru �� o�' cIt W��5L, S� 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. /'1 �FSa�. C O �v��,�p w� ev► �� ( C' i.�t�h 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting. the property covered by your proposal'? If yes, explain. /l��jj C7 10. List any government approvals or permits that will_be needed I'or your proposal, if known. O# K ,�1� POE -- No��c e ca� To4rYxi J'1f 56o, C,; -- cvto, votHe KAY41 C L. c C K II-0 11. Give brief, complete description of your proposal, including the proposed uses and the size of the hrolect and silc. There arc several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include aldditiunaI spec fie it for- mation on project description.) P y'Aj I /+ �t S C )I I'-e l� �a�� /\�o s5 r /C C'f vs -i�f�U � I��� w-ie ! 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your pro- posed project, including a street address, if anv. and section, township, and range, if known. If .t proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicini1 n)al), and topographic map. if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 710 o f 4 A& t fe C Cr d -� �f�► t��S IPo'� o v% 25 L� (lie4 44 T I ) ,e o(�- 4 k e Le-�1 s i 4C a s t►4>n J�TO BE COMPLETED BY APPLICANT FVAI UAFION- IOR 1 B. ENVIRONMENTAL ELEMENTSA(&NCY I JI I1\I 1. Earth a. General description of the site (circle on : Flat, rolling, hilly, steep slopes, mountainous, other b. What is thq steepest slope on the site (approximate percent slope)'? e � TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime L farmland. 5 i4v1oC J GYIRUP/ b.,!i 7 � �`► n /f �� L�9y �r o � c� � c•�=�� d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. n b c. Describe the purpose, type, and ap roximate quantities of an filling or grading pro- oscd. Ind P , / / p Indicate source of fill. �c55; 7 i� ,V Tom,p;�� / t p� .,ri >/ f o h w v I- e d i V1 4ci r r �'C e�]4vrt+q {e t M'A rt 41 /y1J�fer;r9� �ist6'}Y f l9ev, - 5'�Y(Jc >�t�As tie►e�;n a Ir< l y �cgvfeo� f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 1*7 oN e h. Propose)d)measures to reduce or(control erosion, or other impacts to the earth, if any: ✓� hur� fe Yx c e s a )6LA f; 4 vl y Ale//y¢Hers a /ovt� !�✓/ 7<� (�-r/� 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. / 1 tA b. Are there any off—site sources of emissions or odor that may affect your proposal? If so, generally describe. �CJ c. Proposed measures to reduce or control emissions or other impacts to air, if any: hG� e I, TO BE COMPLETED BY APPLICANT EVALUATION FOR 3. Water AGENCY USE ONI Y 3. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year—round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. yes _ 3o1NA Greece 635 , v, 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. �1 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. In- dicate the source of fill material. 4) Will the proposal require surface water withdrawals or diversions? Give general de- scription, purpose, and approximate uantities if known. S, e h �ak� Jrol me wre t 0e65 e v.,I J9.e V S 'e S f Y9 tM i T(4,� �j,f r e ¢ J G'✓t r0 v9j S G t i 1 a 1� C f U$ n 5) Does the proposal lie within a 100—year floodplain? If so, note location on the site plan. �o 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. UI b. Ground: 1) Will ground water be. withdrawn, or will water be discharged to ground water? Give s general description, purpose, and approximate quantities if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals . . .• agricultural; etc.). Describe the general size of the.system, the number of such systems, the number of houses to be served (if applicable),or the number of animals or humans the system(s) are expected to serve. Po��te -4- rU 111: COMM I:TI;D BY APPLICANT EVALUATION FOR AGENCY USE ONLY C. Water Runoff (including storm water): I) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water n flow into other waters? If so, describe. t ��J�� 4 Xpj�(j� t.J��e� }O }�2 �t tCln ed t,n o fi e Y\'A f 16 QmCdZ '1 Could waste materials enter ground or surface waters'? If so, generally describe. AC) d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Qv\ 4. Plank a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine. other shrubs �C grass _ pasture _ crop or grain _ wct soil plants: cattail, buttercup, bullrush, skunk cabbage, other _ water plants: water lily, celgrass, milfoil, other _ other types of vegetation b. What kind and amount of vegetation will be removed or a tere 2 r rack f eMe�'t4 ' �uev � 5c_thlpc�� a�-� GJh �'Je-Te�e P9 S V C. List threatened or endangered species known to be on or near the site. i l' O +r`—E'_ d. Proposed landscaping, use of native plants, or other measures to preserve or enhance c vegetation on the site, if any: PIt4CtK , C,C (b1f-pl I jt /2t MN4rI A I {G be (Nfec N a�,ew ayla i. Animals :I. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: 11:Iw , cro eagle on b' other: m-11111 lals- bea��o , Ik ve , other: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . fish: bass, salmon, herring, shellfish, other: . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . b. List anv threatened or endangered species known to be on or near the site. ou l TO BE COMPLETED BY APPLICANT INAI IAIION IOR A(;I.N('1 l'St. om 1 c. Is the site part of a migration route? If so, explain. I o d. Proposed measures to preserve or enhance wildlife, if any: �I►' ceVV e6N Q� � t� � �0JSet' C' /�+r�e� s� ►4�tC�lLtc)a `YIe 115 6rPvN PrWdlc-c (3r 4is 51 4., o,r 2 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs'? Describe whether it will be used for heating, manu- facturing. etc. L) V1 t b. Would your project affect the potential use of solar energyb adjacent properties'? 1 s generally describe. Y 1 P P f o, c. What kinds of energy conservation features are included in the plans of this proposal'? List other proposed measures to reduce or control energy impacts, if any: Y1 OVI e 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as q result of this proposal'? 11 If so, describe. �pAt O+keV "/-�nV�b� c� ne.$$, a I C c��r41�( -�I(J(d �?'cYtn ca, Passt �(e b>roketi. IntclrsAu(Ic -0oid I�'� e �'-� q,, y 1 Descr ibe nbe s cial emergency v' p g services that might be gg g required. P0efrolevW,, 600fk -f6we(s to Ise (n 4e ?) Proposed measures to reduce or control environmental health hazards, if any: Y) o yr b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)'? 2) What types and levels of noise would be created by or.associated with the project on a short—term or a long—term basis (for example: traffic, construction, 1217 operation, other)? Indi- cate what hours noise would come from the site. j�i�uG,� 70 -"4!T i e !.v i// o �c U✓. �Pr/F�hIS 7,/ t 46 �� r rM �Grs f G'*.fe 5CeY?Arlo (Y �/>> A 1d 10 111 COMPI.I!T1.1) BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3) proposed measures to reduce or control noise impacts, if a y: P �yt b)e Pt,,& �J�rr� �6 be- be 14- clo,,, �s ,� d/-, -tee t hes 5 e C to rr no I 5 e (e v cl.5 4 tr e rh Pi I w►Iw to f,it t $ (mac 1r 8. Land and Shoreline Use a. What is the current use of b/ of three site and adjacent properties? \ 2eck P' T Al/let /4�z, I3 //ts:y�l9fr� rc5t Lyftn 1 b. I lax the site been used for agriculture? If so, describe. L t� PS i � 1n�5 h e�,�. :,� i,! j � c�S c� �fi1✓1 S/M!>?3 jar ��rn� c. Describe any structures on the site. V1 U V1 e d. Will any structures be demolished? If so, what? V1 � c. Whal is the current zoningclassification of the e site? I'. What is the current co�lm_��prehe live plan designation of the site'? &e (�t � WiT►'� ec4 a?t►cvs rt�MtiS FcC GAv►5frtitk5 +Ye,v-, 1P1'( W` L. If applicable, what is the current shoreline master program designation of the site? �L)V\ h. I lax any part of the site been classified as an. "environmentally sensitive" area? If so, specify. ���5. ��e Bowe f (.w of JAjACJ5 �oCc�e f I v5 C(, i. Approximately how many people woo d reside or work in the completed project'? �Q yrw I. Approximately how many people would the completed project displace? 11 LIV 'e, k. proposed measures to avoid or reduce displacement impacts, if any: I. prolx,sed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: -7— TO BE COMPLETED Bl APPLICANT AGI•N('l l'XI (1\I 1 9. Housing a. Approximately how mane units would be provided, if any'? Indicate whether high, mid- die, or low-income housing. In O b. Approximately how many units, if any, would be eliminated'? Indicate whether high, middle, or low--income housing. V\. C) c. Proposed measures to reduce or control housing impacts, if any: P1 C) in 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas, what is the principal exterior building material(s) proposed? V10A0,7_ b. What views in the immediate vicinity would be altered or obstructed'? nC11A _Q1, c. Proposed measures to reduce or control aesthetic impacts, if any: YA Q_ I. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur'? V) U 0 -1,-- b. Could light or glare from the finished project be a safety hazard or interfere with views? V*\GV\. 4-,-_1 c. What existing off-site sources of light or glare may affect your proposal? Y\oV\ e d. Proposed measures to reduce or control light and glare impacts, if any: noV e 12. Recreation a. What designated and infp al recreational op�rtunitics a c in the immediate vicinity'? (� ?l I L' v iSi tOt�S o� C1ir 4110- Xrle rJiPw�H f b. Would the proposed project displ ce any existing recreational uses? If so, describe. -s- IO HI ( OM1111'.711) BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Vroposed measures to reduce or control impacts on recreation, including recreation op- portunities to be provided by the project or applicant, if any: /OA 13. historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preser- vation registers known to,be on or next to the site? If so, generally describe. hvhe- b. Generally describe any landmarks or evidence of historic, archaeological, scientific• or cultural importance known to be on or next to the site. c. I roposcd measures to reduce or control .impacts, if any: Y >n VA -e 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. -S wNnd C^kC Drive d— s b. Is site currently served by public transit'? If not, what is the approximate distance to the nearest transit stop? In 6 _ c. Ilo++ many parking spaces would the completed project have? How many would the project eliminate! 1A6rk t d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, ge eralll escribe Indicate whet f r ublic or privalel. �S //f'k !J� A.)1 4 lfI q > GSUIJ� O r e flee c. Will the project use (or occur in the immediate vicinity of) water, rail, or air transporta- tion? If so. generally describe. / OO I. Ilo++ many vehicular trips per day would be generated by the completed roject" If knu++n. indicate when peak volumes would occur. 7y "7&e"Jt It � q N y �/&"x IC -9— TO BE COMPLETED B1 APPLICANT 1 VALUAI'I()N UOR AGI NCN l'11 l)NI 1 g. Proposed measures to reduce or control transportation impacts, if any: U�r Passe �Je �e� d�,P Iti+ ;S dotAlVNI 15. Public Services a. Would the project result in an increased need for public services (for example: fire pro- tection, police protection, health care, schools, other)? If so, generally describe. j1 b b. Proposed measures to reduce or control direct impacts on public services, if any. �orJ P 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse scrv- ice, telephone, sanitary sewer, septic system, other. 'WC)V1 e b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate viAY4 which mi ht be needed. ©SSI 1o1e 6 C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relyin on them to ke/its decision. q ' Signature: .....C..... ...... /�... ............ QU ► .�-�.ro .. 'Qovt 44JCSt 4 Date Submitted: ..�P?".�. ........................................ Approved by: ..... ...... .. ............................. ...... ............. Title: .......... ............. ..... Date: ... .. ......... . ............................................ ......... -10- "',r TANDARD . iINGTOIv MATE DEPARTMENTOF �!. .. 'Natural Resources RECLAMATION PLAN (Form SM-8A) DO I NEED TO FILE A RECLAMATION PLAN? r Mines with working faces higher than 30 feet The Surface Miring Act(RCW 78.44), as amended in 1993, and steeper than 45e requires you to file a reclamation plan for: You must file a reclamation plan for mines with Mines more than three acres in size working faces that are both higher than 30 feet and You must file a reclamation plan for mines in which steeper than 1 foot horizontal to 1 foot vertical(45�, three or more acres(including highwalls, pit floors, unless there is a pre-existing natural hazard in the area. stockpiled areas, side-cast areas, and processing-plant Note: Lands that have already been reclaimed to the standards sites)will be or have been disturbed by mining. given In RCW 78.44 should not be included when calculating the A disturbed area is any place where operations in disturbed-area or face-height thresholds. preparation for or during surface mining physically This form will help you by providing a checklist of the infor- disrupt, cover, compact, move, or otherwise alter the mation required. Even so, it is not uncommon for applicants characteristics of soil, bedrock, or topography that to have to modify their original plan before it is acceptable to existed prior to such operations. Disturbed areas may the Department. include, but are not limited to: working faces, excavated Note: This form is also available on disk. water bodies, pit floors, processing plant sites, stockpile Note: When signed by the applicant and approved by the Depart- sites, spoil-pile sites, and equipment staging areas. ment of Natural Resources,this document and the associated maps, Disturbed areas do not include mine access roads cross sections,and other attachments will be the approved reclama- unless these roads have characteristics of topography, tion plan for this permit that the permit holder must follow for the drainage, slope stability, or ownership that make mine site. Variation from the approved reclamation plan may re- quire that a new plan be submitted to the Department for approval. reclamation necessary. Please answer all questions legibly in ink and sign. NAME OF APPLICANT/PERMIT HOLDER(S) (Type or print In ink.) NAME OF INE n This will be the name(s)on the permit and performance security. I/V 1 Y1 11/l U i Street address and milepost of surface mine MAILING ADDRESS Distance(miles) Direction from Nearest community ��o? � I` .Sheba e;C1 e eV\ 'LOJk COUNTY No attachments will be accepted.Legal description of permit area: D 1/4 1/4 Section Township Range Telephone S3 ' v L a SURFACE OWNERSHIP J Give names and addresses of all individuals with possessory interest in land. (Continue on another sheet if more space is needed.) Qut�r� �� +��� MINING AREA TO BE DISTURBED YJ Ol (,3 (Include all acreage to be disturbed by mining,reclamation setbacks,and 50 associated activities during the life of the mine.) In the following 36 months v acres Total during the life of the mine (This should be the same number as on Form SM-2.) acres —7� Standard Redamation Plan(Form SM•8A) Revised 10/93 Reclamation Permit/Application No. I _ANNING FOR RECLAMA )N Reclamation of a site must meet or exceed the minimum rec- any segment within two years of abandonment of mining on lamation standards required by the Washington State Surface that segment(except as provided for in a segmental reclama- Mining Act (RCW 78.44). The primary purpose of the Act is tion agreement). to insure that segmental reclamation occurs promptly and A reclamation plan should be simple, practical, and easy properly for all permitted mines. Each requirement of the rec- to implement. It should be flexible, taking into account the lamation law may not fit every mine. The law provides some potential for unantic'pated changes in the geology and the latitude for variance. If you have a good reclamation idea or a market that will affect reclamation.The plan should have pro- unique operating problem, see the reclamation officer at your visions for quality reclamation even if mining to depletion Department of Natural Resources Region office. never occurs. Form SM-8A and the required maps and cross sections are WHAT IS A RECLAMATION PLAN? adequate documentation for most mines. In some instances, A reclamation plan can be thought of as both a financial plan- separate reports, such as an expanded checklist, a hydro- ning document and a contract that defines the topography, geologic evaluation, or an environmental impact statement, drainage, and vegetation of the site after reclamation is com- may be necessary. plete. This plan describes the permit holder's strategy to When signed by the applicant/permit holder(s) and land- achieve acceptable reclamation at the lowest possible cost and owner(s) and approved by the Department of Natural Re- establishes an economic limit of production for each site based sources(DNR), this document and the associated maps, cross on the area available for mining and the grade of the deposit. sections, and other attachments will be considered the ap- lt also identifies and addresses mitigation of potential environ- proved reclamation plan for this permit, which the permit mental impacts, such as gullying of impermeable clays, for holder must follow for the mine site. Significant variations which the permit holder is liable; establishes a segmental se- from the approved reclamation plan require that a new recla- quence of mining and reclamation that will avoid unnecessary mation plan be submitted for approval. Managers and senior earth moving; and identifies equipment needed. equipment operators must be familiar with the reclamation ob- The plan should provide a schedule for initiating reclama- ligations to which the permit holder has committed. tion as soon as possible on parts of the site where surface mining has been completed. Reclamation activities, to the ex- The checklist below will help you be sure that nothing is tent feasible, should be conducted simultaneously with surface forgotten. Neatness counts! If a plan is not neat and legible mining, and, in any case, reclamation must be completed on and in ink, it will be rejected. CHECKLIST OF MINIMUM RECLAMATION STANDARDS GENERAL INSTRUCTIONS Direction of ground water flow: )�_o 5+ Please check the appropriate boxes and fill in the blanks below. is the aquifer perched? ryes ❑ no Where required,please explain in the space provided.If the question does not apply to your mine, please write in "NA"for "not applica- ble"to let us know you have read the question.If additional space is The site will be mined: ❑ wet ;4-dry ❑ both needed, write "(Continued)" in the blank and restate the question plain �'JUU C// r,.J)��e ✓ and continue your answer on a separate sheet,or write"See attached report"in the blank and attach a report.Any unanswered questions rl�k ILA ) 1 / 04Cli C_C may result in this form being returned to you unapproved. Q In MINE TYPE Type of mine: r$l_Rlt ❑ quarry Material(s)to be mined: A sand and gravel ❑ rock or stone ❑ clay ❑ metal ❑ limestone ❑ silica ❑ other Deposit type. 4 glacial ❑ river flood plain (alluvial) If any of the following conditions apply,a hydrogeologic evalu- ❑ river channel deposits ❑ talus ❑bedrock ❑ unknown ation that outlines measures to protect against or mitigate ❑ lode ❑ other avulsion, erosion, and damage to fisheries may be necessary. The site is in a- HYDROLOGY ❑ river or stream channel ❑ 100-year flood plain Water table depth is feet below sea level, or ❑ critical aquifer recharge area ❑ sole source aquifer Athe surface, or ❑ other ❑ wellhead protection area ❑ special protection area ❑ public water supply watershed Annual fluctuation of water table is from _ a feet ❑ designated aquifer protection area on (_ Ct ,)—to feet on_22-� 5'3 Hydrogeologic evaluation is attached ❑ yes duo (date) (dote) Standard Reclamation Plan(Form SM-11A).Pape 2 of 12 Reclamation PermWAPPlicalion No. ' —7 6 O Explain: _ mixed with steri ils.Topsoil should not be used for screen- ing berms requireu by county or municipal government be- cause this would preclude its timely use for reclamation. Depth of topsoil is f feet. Depth of subsoil is feet. Depth to bedrock is 3 feet. Topsoil will be salvaged where possible? tC yes ❑no SUBSEQUENT LAND USE If no, explain: Subsequent land use: O industrial agricultural 64 forestry ❑ residential O wetlands and lakes ❑ other Subsequent land use is compatible with county Topsoil and overburden will immediately be moved or municipal comprehensive plan? pW yes ❑ no to reclaim adjacent depleted segment? ❑ yes Wno County or Municipality Approval for If no, explain: a/)! ekir) .r: t/i 11eg✓I g 4 _e Surface Mining (Form SM-6)is attached? yes Ono ll 14) Jgp If any answers are no, explain: Topsoil and overburden storage areas will be beyond the limits of mining but positioned for the shortest possible downhill transport during reclamation? yes ❑ no If no, explain: Note: Approval of the reclamation plan and (or) Form SM-6 does not vest the subsequent land use. Subsequent use may be changed by the permit holder with the written approval of local government up until the time reclamation is complete and the reclamation permit is terminated. Change of subsequent use by the permit holder may "8efore materials are moved, vegetation will be cleared and require submission of revised Forms SM-6 and SM-8A and a State drainage planned for the storage areas? yes Ono Environmental Policy Act(SEPA)checklist. If no, explain: SITE PREPARATION Permit and Disturbed Area Boundaries The permit holder should delineate the permit boundaries and maximum extent of disturbance and setbacks with clearly vis- Storage areas will be stabilized with vegetation if ible permanent boundary markers. The permit holder must materials will be stored more than one season? )X yes ❑ no maintain the boundary markers until the termination of the reclamation permit. If no, explain: Boundary of the permit area has been marked with permanent boundary markers? ❑ yes )9 no Boundaries of areas to be disturbed by mining (permit area minus setbacks) have been marked with permanent boundary markers? Lyes Ono Permanent Setbacks and Screens If no, explain: Permanent setbacks and screens help control erosion, and provide seed sources for reclamation. Screens should consist of native vegetation and(or)topography. Permanent setbacks are not required for pits(unconsolidated deposits)but may still be useful if the mine has close neighbors or adjacent scenic resources, and setbacks may be required by local government. Permanent setback and screen material should not be mined Saving Topsoil and Overburden for Reclamation or used for reclamation.The minimum permanent setback for Prior to any surface mining operation, the permit holder shall quarries (consolidated deposits) permitted after June 30, carefully stockpile all available topsoil and overburden in stable 1993, is 30 feet. storage areas for use in later reclamation or immediately move The permanent setback for this site will them to reclaim adjacent depleted segments. Topsoil needed be feet wide. for reclamation may not be sold or given away or removed or / 7 Standard Reclamation Plan(Form SY-BA).Pape 3 of 12 Reclamation permit/Application No. ( I -7 O i Reclamation Setbacks Conservation acks If the cut-and-fill method will be used to restore slopes rather In special cases,setbacks may be necessary to protect unstable than mining to a final slope, a setback from the property slopes, wildlife habitat,or other sensitive areas or to limit tur- boundary or permanent setback (where used) is necessary to bid water discharge from areas that will be disturbed. insure sufficient material for reclamation.The reclamation set- back for pits (unconsolidated deposits) permitted after June Conservation setbacks are necessary for: ❑ unstable slopes 30, 1993, must be at least equal to the maximum anticipated ❑ wildlife habitat PLwater quality height of the adjacent working face. (A setback equal to the p other working face will provide only enough material for a 2:1 slope. To meet the standards of the law for slopes of between 2:1 Explain: and 3:1, a larger setback is generally required.) Maximum depth of the mine will be feet. The reclamation setback(material that can be used for reclamation)for this site will be I SC) feet wide. Conservation setbacks have been marked with permanent boundary markers? pZ yes ❑ no Reclamation setback has been marked with permanent boundary markers? ❑ yes Xno SEGMENTAL RECLAMATION If no, explain: { 15 c ,ywrk e J A iVvfi9 -� The permit holder must reclaim each segment of the mine within two years of completing mining on that segment and (or)in the manner described in this reclamation plan or a sepa- rate segmental reclamation agreement. Segmental reclama- tion helps establish self-sustaining vegetation,especially native This site will not have a reclamation setback pioneer vegetation, and promotes stable slope conditions and because a backfilling plan is attached? ❑ yes),no improves the water quality and appearance of the site. This site will not have a reclamation setback for the Permit area has been divided into segments for mining and reclamation purposes? Dyes ❑ no following reason(s): if no, explain: Each segment is smaller than seven acres, has less than 500 Setbacks to Protect Streams and Flood Plains linear feet of working face, and has characteristics Generally no mine may be located in or near streams or on that make it feasible to treat it as a unit? yes ❑ no 100-year flood plains unless a Shoreline Permit has been is- Explain: Ll S/oCre 5 e5^Itz f S be sued.Setbacks from streams and flood plains should be at least J 5,eJ A5 t^e r/4w11 14I, c3tn *rej4_S 200 feet wide. Wider setbacks may be necessary for stream and flood-plain stability and to prevent breaching of the pit at a later date. A stream setback of at least 200 feet has been marked with A schedule for the sequence of mining and segmental permanent boundary markers? JR-yes ❑ no reclamation of each segment or a Segmental A setback of at least 200 feet from the 100-year Reclamation Agreement is attached? ❑ yes H no Z flood plain has been marked with permanent If no, xplain: � _�5 t�O yl d;_3 V., 7 boundary markers? J&yes ❑ no e IAOJ V k //0. Explain: t�5 i +Z GM)to�CI L./ T ZO Ak �I MINING PRACTICES TO FACILITATE RECLAMATION Copy of Shoreline Permit from the Department of Removal of Vegetation Ecology and(or)local government is attached? ❑ yes 101,no Vegetation will be removed sequentially from-areas Hydraulic project approval from the Department to be mined to prevent unnecessary erosion? Ptyes ❑ no of Fisheries and Wildlife is attached? ❑ yes IXIno Reclamation permWAppiicatfon No. 7 Standard Reclamation Plan(Form SM•8A).Pegs 4 of 12 �� If no, explain: If yes, give deta no, explain: e U I 0-2. ^J Small trees and other transplantable vegetation will be sal- Revegetation, sheeting, and (or)matting will be vaged for use in revegetating other segments? ❑ yes 15i�no used to protect areas susceptible to erosion? ❑ yes no If yes, give details: JI— - If yes, give details; if no, explain: ere 1 I os sit I 1Q 51A Vk � 51 tAN { � aref- �cas;n�1 Temporary water-control systems used for Wood and other compactible debris should not be buried; it erosion control will: should be recycled, removed, burned, or chipped.If wood and Divert clean water around the pit? O yes jl.no other compactible debris will be buried, solid-waste disposal x Trap sediment-laden runoff before and land-use permits must be obtained. it enters a stream? yes ❑ no Wood and other compactible debris will be: O recycled Result in essentially natural conditions ❑ removed ❑ chipped burned ❑ buried of volume,velocity, and turbidity? pO yes ❑ no used to synthesize topsoil or mulch Be designed for 25-yr, 24-hr peak event? 0 yes ❑ no i ❑ other Be removed or reclaimed? ❑ yes ,Kno i If any answers are no, explain: Oil - n o{ df ye4 1, 5 Per1N► ev4� le; ,,���` ��� Qm L)e A `DeGWU e 4 ali'oc�I,�e� i � t�rw`e+able Solid-waste disposal, burning, and land-use permits are attached? ❑ yes no Some wood and other debris will be salvaged and used for fish and wildlife habitats? ❑ yes IZ no If yes, give details; if no, explain: igt� t �ef M I ki-a IC, itches, flumes, and(or) armored channels will be 1ti-T S t3�L) S rk(��established to prevent erosion of setbacks on t) neighboring properties? ❑ yes A-no G V�OUt 1 (1 p 1C�5 I IAA C 4e S If yes,g details; if no, explain: P00I n f 0J.11 m o� e e �� it bor�f Q40-tZ �eS Erosion Control Stormwater conveyance ditches and channels will be Erosion control measures are generally necessary during min- lined with vegetation or riprap? ❑ yes lino ing to avoid severe erosion or loss of topsoil. Each site must --�� be evaluated on an individual basis, and multiple techniques to If yes, �ive details; if no, explain: .,!mil-P oA/5 control erosion may be necessary.The Department of Ecology requires discharge permits for most surface mines.In addition, some mines at higher elevations should plan for the effects of ee rain-on-snow events on slope stability and erosion. Pit floor will slope at gentle angles toward highwall, sediment retention pond, or proper drainage? 10 yes ❑ no Standard Reclamation Plan(Form SM-6A).Page 5 of 12 Reclamation PeemillApplication No. 7 6e L Natural and other drainage than will be kept free of Slope Require; is for Pits and Waste Rock Dumps equipment, wastes, stockpiles, and overburden? For unconsolidated material (such as sand and gravel pits, ❑ yes42"So waste rock dumps, etc.), final slopes must meet the following If no, explain: Y1 E C Q -Wk, i`�_Jt7 i 1 requirements: I U ?r►t (� I A le 6 l A K h"t_ Slopes will vary between 2.0 and 3.0 feet horizontal to 1.0 foot vertical or flatter, except in limited areas where steeper slopes are necessary to create sinuous topography and control drainage? eyes ❑ no If no, explain: RECLAMATION TOPOGRAPHY The goal of reclamation is to create stable, usable land. New drainages should be established, and contours should blend For pits,slopes will not exceed 1.5 feet horizontal to smoothly with adjacent offsite topography. To promote slope 1.0 foot vertical except as necessary to blend stability and revegetation, slopes should generally vary be- with adjacent natural slopes? ryes ❑ no tween 2.0 and 3.0 feet horizontal to 1.0 foot vertical or flatter. Give details:Slopes steeper than 1.5 feet horizontal to 1.0 foot vertical are �V12-zec C(C Mt 11� not acceptable for pits except in limited areas to tie in to offsite topography. The reclaimed mine site should appear natural 42 SS — that is, slopes should be sinuous and right-angle corners should be eliminated by rounding. Sinuous slopes can be formed either by mining to the prescribed angles, which is Slope Requirements for Quarries and generally more cost effective, or by using the cut-and-fill method. Backfilling is not allowed unless prior approval is ob- Hardrock Metal Mines tained from DNR. For consolidated rock, such as basalt, andesite, granite, lime- stone,or quartzite, a vertical highwall face may be acceptable. FINAL SLOPES There is no prescribed angle or height. Slopes will vary in steepness? yes ❑ no Some slopes will be reclaimed as cliffs? ❑ yes �no If no, explain: ' If yes, explain by checking the appropriate box below: ❑ Slopes steeper than 1.0 foot horizontal to 1.0 foot vertical are an acceptable subsequent land use as confirmed on Form SM-6. Slopes will have a sinuous appearance in both ❑ Cliffs are indigenous to the immediate area and profile and plan view? $yes ❑ no already present a threat to human life. Photo attached to document presence of cliffs. If no, explain: ❑ Geologic or topographic characteristics of the site preclude slopes being reclaimed at a flatter angle and are an acceptable subsequent land use as confirmed on Form SM-6. Explain: Slopes will have no large rectilinear(that is, right angle or strai ht, planar)areas? ❑ yes �.no If no, explain: ii O fvv ' A W! 1 U A' 1 a-T Q 1 i O cat to �S�t V, Where reasonable, tracks of the final equipment pass will be preserved and oriented to trap moisture, Selective blasting will be used to remove benches and soil, and seeds and to inhibit erosion? Ryes ❑ no walls and to create chutes, buttresses, spurs, scree slopes, If no, explain: and rough cliff faces that appear natural? ❑ yes o If yes, give details; if no, explain: vif� v Standard Reclamation Plan(Form SM•8A).Page 6 of 12 Reclamation Parmit/Application No. 7 O Reclamation blasting will be use reduce the entire Mine floor will I ntly graded into sinuous drainage highwall to a scree or overburden slope less than channels to preclude sheet-wash erosion during 2.0 feet horizontal to 1.0 foot vertic ? ❑ yes)Wno intense precipitation? ❑ yes 1�no If yes, give details; if no, explain: -11 f2li o If yes, give details; if no,explain: ' Ib�1�Lt am e a,s Small portions of benches will be left to provide habitat for raptors and other cliff-dwelling birds? ❑ yes J21-no Backfilling Mine floor will be bulldozed, plowed,ripped, or If backfilling is proposed, it is necessary to give the source of blasted to foster revegetation? 1 yes ❑ no the backfill material, quantity needed,grading and compaction If yes, give details; if no, explain: PC r scheme, erosion control plan, and immediate vegetation plan. 2 14 le d e Doe C If backfill is to be brought from off site, copies of all permits 1 from local government will be necessary. d -i 6,2:.,nt I tQ Wt e Slopes will require significant backfilling? 0-Yes ❑ no DNR-approved backfilling plan and(or) permits are attached? ❑ yes ;5-no LAKES, PONDS, AND WETLANDS If no backfillin plan atta hed, explain: If surface mining results in the formation of a swamp, pond, 'h4C' 1 Joe ram_to k daw or lake useful for recreation,wildlife habitat,water quality con- trol, or other beneficial wetland purposes, the site must be reclaimed in the following manner: Reclaimed areas below the permanent low water table in soil,sand, gravel, and other unconsolidated material Backfilling will be done with overburden material will have a slope no steeper than 1.5 feet (not topsoil) perched above the mine? yes ❑ no horizontal to 1.0 foot vertical? ❑ yes O'no If no, what is the source of the material? If yes,give details; if no, expt�in: L All grading/bacWilling will be done with non-noxious, non- If not already present, soils, silts, and clay-bearing combustible, relatively incompactibllee solids? {$ yes ❑ no material will be placed below water level to If yes, give details; if no, explain: I 0 P5a J -e- enhance revegetation? ❑ yes;,no f �l Or* iN If yes,give details; if no, explain: Backfilled slopes will be compacted? ❑ yes $-no If yes, give details; if no, explain: 01 ' U Some parts of pond and lake banks will be shaped so r—g 1\4+ that a person can escape from the water? ❑ yes 9no 1 If yes, give details; if no, explain: 110�^� �l MINE FLOORS / Flat areas will be formed into rolling mounds? ❑ yes Ono Armored spillways or other measures to prevent If yes, give details; if no, explain:jQld -e f 4-6 b e undesirable overflow or seepage will be C -f o,,.;,,kYej�> provided to stabilize bodies of water ( and adjacent slopes ❑ yes 19.no c J e C If yes,give details; if no, explain: r� ic S Po /r n t^ 'f Standard Reclamation Plan(Form SM•BA).Page 7 of 12 Reclamation Permit/Application No. ` ` Wildlife habitat will be develo( . incorporating Drainages will bt istructed on each reclaimed segment such measures as: to control surface water, erosion, and siltation, Sinuous and irregular shorelines? ❑ yes '� no and to direct clean runoff to a safe outlet? 6pryes ❑ no I� no n Varied water depths? ❑ yes � if yes, ive details; if no, explain: /if eA wt A Shallow areas <18 inches deep? ❑ yes QA5no Islands and peninsulas? ❑ yes 9no ` Give details: W-� Ai^ The grade of ditches and channels will be constructed to limit erosion and siltation? yes ❑ no If yes, ive de ails;if no, explain. oky A s 4,Yl Ponds or basins will: Be located in stable areas? ❑ yes Yho Have sufficient volume for expected runoff? ❑ yes &no SITE CLEANUP AND Have an emergency overflow spillway? ❑ yes ono PREPARATION FOR REVEGETATION Have protected spillways and outfalls Dealing with Hazardous Materials (for example, rock armor)to prevent failure and erosion? ❑ yes ano If surface mining will expose hazardous natural materials,such as acid-forming coals and metalliferous rock or soil,the permit If any answers are no, explain: holder must attach a plan to handle such materials. All grad- ing/backfilling to cover the hazardous materials must be made with non-noxious, noncombustible, relatively incompactible solids unless the permit holder provides written approval from all appropriate solid waste regulatory agencies. Other meth- ods may also be acceptable. Proper measures will be taken to prevent seepage from water impoundments that could cause flooding outside the Natural hazardous materials are present permitted area or adversely affect the stability of at the mine site? ❑ yes P21-no impoundment dams or adjacent slopes? ❑ yes Juno The final ground surface drains away from If yes, give details; if no, explain: any hazardous natural materials? Ayes ❑ no If yes, ive details; if no, explain: It IS X_--k 1 Written approval from other agencies with the jurisdiction to regulate impoundment of water is attached? A yes ❑ no plan for handling hazardous mineral wastes If no, explain: indigenous to the site is attached? O yes )§�no If no,written approval from all appropriate solid waste regulatory agencies is attached? ❑ yes Who Removal of Debris All debris(garbage, "bone piles", treated wood, etc.) Final Drainage Configuration will be removed from the site? Byes ❑ no Reconstructed drainages must be graded and contain enough All temporary sheds, scale houses, and other energy-dissipation devices so that essentially natural condi- structures will be removed from the site? O yes Ono tions of water velocity,volume,and turbidity are re-established within six months of reclamation of each mine segment. If either answer is es, ► e detai s; if no, explain: Drainage will be capable of carrying the peak flow of yes, £x,� the 25-year, 24-hour precipitation event? (Data are available at DNR Region offices.)? 0 yes ❑ no If yes, give details; if no a plain: f��Pe- � ill ke ea o 4Ai r a 1^ li � f e� � � e• 3 (� Standard Reclamation Plan(form SY-SA).Papa 2 of 12 Reclamation Permit/Application No. ( 2- 7 d SOIL REPL EMENT Materials, such 1, loess, and(or)shale, are available If available, up to 3 feet of topsoil and (or)subsoil on site that coutu oe used to supplement topsoil for reclamation. ❑ yes P•t no will be restored? yes ❑ no If no, explain: If no, explain: (1_ 012(V\ 'r Silts from settling ponds or a filter press will Topsoil will be restored and seedbeds prepared as be used for reclamation? ❑ yes Arlo necessary to promote effective revegetation and to stabilize slopes and mine floor? Oyes ❑ no If no, exp ' If yes, giv details; if no,�explain: � ��7y► k�'� ki We, AC, �e 5 Settling pond clay slurries will be pumped or Topsoil will be replaced to an a hauled to other segments for reclamation? ❑ yes p p approximate depth of P41Q If no, explalpfeet on the pit floor and a depth of If no, explai : feet on slopes. Topsoil will be distributed evenly over the site ❑ yes Wno If no, explain: bef= 5 t C o c2 5 e C o ,C Al Topsoil will be replaced with equipment that will minimize compaction, or it will be plowed, disked, or ripped following placement? :�t yes ono If no, explain: If topsoil is in short supply, it will be strategically placed in depressions and low areas in adequate thickness to conserve moisture and promote revegetation? ,;!�-Ws ❑ no If no, explain: Topsoil will be immediately stabilized with grasses and legumes to prevent loss by erosion, slumping or crusting? r ❑ yes .ff no If no, explain: 0/p 1-01 [ t,y V511 V1 C Topsoil will be moved when conditions are U• o fill{2 not overly wet or dry? yes ❑ no e i If no, explain- REVEGETATION The revegetation plan should show how, when, where, and what vegetation will be planted. A thorough and detailed plan Topsoil will b imported? ..yes ❑ nno� Q increases the chances that plants are well established when Explain: OcJ a \ reclamation is finished. It is best to do test and demonstration O k Qa cc e is plantings early and to monitor the results so that appropriate changes can be made before mining ceases. JS P CCR The mine site is in: ❑ eastern Washington A western Washington? Synthetic topsoil will be used and(or) made on The mine site is: wet ❑ dry? site to supplement existing topsoil? ❑ yeso �/ ` The average precipitation is �•/U inches/year. If no, explai Revegetation of a segment will start during the first proper planting season(fall for grasses and legumes, fall or late winter for trees and shrubs) following restoration of slopes? JZ-Fes ❑ no Standard Reclamation Plan(Form SM-BA).Page 9 of 12 Reclamation Permit/Application No. ' / 7 C. O If yes, 've details; if no, explain Western Wash on Wet Areas e ❑ birdsfoot trefoil ❑ sedges -} � N� ❑ cedar ❑ tubers ❑ cottonwood ❑ wetland grasses ❑ creeping red fescue ❑ willow ❑ red alder' Other Y 4 Eastern Washington Dry Areas Test plots will be used to determine optimum vegetation plans? yesj�<no ❑ alder' ❑ juniper The site will not be actively revegetated because: ❑ alfalfa' ❑ lodgepole pine ❑ It is a rural area with a rainfall exceeding 30 inches O black locust' ❑ lupine' annually and erosion will not be a problem ❑ deciduous trees ❑ ponderosa pine (requires approval of DNR Region office). ❑ deep-rooted ground cover ❑ Russian olive' ❑ Demonstration plots and areas will be used ❑ diverse evergreens ❑ shrubs to show that active revegetation is ❑ grasses ❑ clover not necessary. I Other ❑ Revegetation is inappropriate for the approved subsequent use of this surface mine. ' Explain: Eastern Washington 4t Areas / � ❑ alder' ❑ serviceberry !�Y> S /M e� i�f 1'�� O cottonwood ❑ tubers O poplar ❑ willow Documentation is attached? ❑ yes C no ❑ sedges RECOMMENDED PIONEER SPECIES Other Segmental reclamation allows plant communities to develop according to ecological succession stages. A combination of Give pl nting details: natural reseeding and intentional planting is the most effective S tq,! 21tfftos means of establishing diverse and prosperous pioneer vegeta- tion. Revegetation with grass and legumes should occur during L9 Ke JLZ ie Awl/ the first appropriate season after slope shaping and replace- .� 2 M-c04 ment of topsoil. Establishing widespread healthy vegetation ' generally takes several seasons. Follow-up evaluations may be c necessary to monitor progress and to determine why plants did not thrive. In eastern Washington, continuous ground cover may not be achievable because of arid conditions or sparse topsoil. However, revegetation shall be as continuous as reasonably possible. The sections below give suggestions for species most likely to survive in different types of climate. Check the species that will probably be planted at your mine site. Western Washington Dry Areas ❑ alfalfa' ❑ lupine' ❑ clover' ❑ orchard grass ❑ cereal rye ❑ perennial rye ❑ colonial bent grass ❑ ponderosa pine ❑ creeping red fescue ❑ red alder' • indicates nitrogen-fixing species ❑ Douglas fir ❑ shore pine PLANTING TECHNIQUES ❑ ground cover(other) ❑ shrubs Mined sites generally present harsh conditions that hamper Other revegetation. Nevertheless, much can be done to increase the chances for successful seeding and /planting. Standard Reclamation Plan(Form SM-BA).Page 10 of 12 Reclamation PermivApplication No. ` / v Revegetation at this site will rel MAPS Ripping and tilling? c5xyes ❑ no Information about your proposed reclamation plan should be Blasting to create permeability? ❑ yes ❑ no provided on several types of maps:(1)a site-access map,(2)a Mulching? ❑ yes ❑ no pre-mining topographic map, (3) a reclamation sequence Irrigation? ❑ yes ❑ no map, and(4)a final reclamation map with at least two inter- secting cross sections. These maps and cross sections should Fertilization? ❑ yes ❑ no be at an appropriate scale to show the desired information. Importation of clay or humus-bearing soils? ❑ yes ❑ no , Suggested Map Scales Adding other soil conditioners or Site size Map scale amendments? ❑ yes ❑ no 3-5 acres not less than 1 inch = 50 feet 5-10 acres not less than 1 inch = 100 feet Give details: 10 or more acres not less than 1 inch = 200 feet 5� Other Map Requirements Preferred map size is 11 x 17 inches unless otherwise noted; larger maps are acceptable, but you must be prepared to fur- nish additional copies, if requested. If maps are small, they may be grouped together on a single sheet of paper. Each map must include: ❑ Scale ❑ Bar scale ❑ North arrow Trees and shrubs will be planted in topsoil ❑ Legend with all symbols defined or explained or in subsoil amended with generous ❑ Title block with the following information: amounts of organic matter? ❑ yes no ❑ Title of map If yes, g details; i no, explain: ❑ Application/permit number ❑ Name and address of applicant/permit holder(s) ❑ Space for signature ❑ Map/exhibit number ❑ Date map was drawn or revised Mulch will be piled around the base of SITE ACCESS MAP trees and shrubs. ❑ yes 6'rto An 81i¢x 11 inch copy of the pertinent section of a road map j High-quality stock will be used. PgLyes ❑ no that clearly shows how to get to the site from the nearest town. Trees and shrubs will be planted while they are dormant? �f yes ❑ no PRE-MINING TOPOGRAPHIC MAP' Stock will be properly handled, kept cool and This map is necessary to establish the location and setting of moist, and planted as soon as possible? vrbrTes ❑ no the mine site. It must show: Seeds will be covered with topsoil or mulch ❑ Permit area plus an appropriate border on all sides. no deeper than a half inch? 'Ayes ❑ no ❑ Elevations and contours, natural ground slopes, drainage If any apsitrers are no, plain: patterns, and other topographic features 2. 1 e ❑ Boundaries and names of counties and municipalities. ❑ Boundaries of property ownership, including adjacent properties. ❑ Names and addresses of adjacent property owners. ❑ Locations and names of other mines. ❑ Locations and names of all roads, railroads, utility lines, A Reclamation and Seeding Report(Form SM-3)will or any other rights of way. be filed with the Department upon completion of ❑ Locations and names of all streams and natural and revegetation for each segment? yes ❑ no manmade drainways. If no, explain: t For a base map,use U.S.Geological Survey 7.5-minute maps,which are available from sporting goods stores or may be ordered from the U.S. Geological Survey, (509) 353-2524, or DNR Photo and Map Note: The Department of Natural Resources will not release a recla- Sales, P.O. Box 47031, Olympia, WA, 98504-7031, (206) 902- 1234. mation permit or performance security until it deems that effective revegetation has commenced. That is, vegetation has survived 2 Contour intervals are deemed adequate if they accurately reflect the through at least one growing season and come up again (usually conditions of the site. Generally, contour intervals should be between about 18 months). 5 and 20 feet. Standard Reclamation Plan(Form SM-f!A).Pape 11 of 12 Reclamation Permit/Application No. -7 C Q p Locations and names of sign t buildings, parks, and. ❑ Locations anc ►es of all lakes, springs, and wetlands. other manmade features. ❑ Location and depth of replaced topsoil. p Locations and names of all wells, lakes, springs, and ❑ Permanent drainage and water-control systems(with existing wedandst, expanded view, if needed). o Boundaries of the areas that will be disturbed by mining. p Area to be revegetated and proposed species. RECLAMATION SEQUENCE MAP D Other information pertaining to the permit and required. This map shows the details of tl,a plan for mining and segmen- by statute. tal reclamation. It should cover the same area as the pre-min- Cross sections ing topographic map and display the following information: ❑ At least two cross sections(generally at right angles) p Permit area plus an appropriate border on all sides. show original and final topography and water table. p Boundaries of the areas that will be disturbed by mining. GEOLOGIC MAP2 ❑ Locations of all permanent boundary markers. When required by the DNR, a detailed description of geologic ❑ Location of proposed access roads to be built i setting and the type of deposit to be mined. in conjunction with the surface mining operation and whether they will be reclaimed or left as roads. PHOTOS AND OTHER SUPPORTING DATA ❑ Locations and types of setbacks and berms. Aerial and(or)other photographs should be submitted in sup- ❑ Numbered segments and the direction and sequence of port of the application, when feasible. Additional maps, pho- mining. Avoid mining from the center outward. tos, and detailed reports may be required by DNR. ❑ Topsoil storage areas and sequence of stripping, storing, FINAL CHECK and replacement on mined segments. r ❑ Overburden storage areas and sequence of stripping, ❑ All documents submitted have the date, the name and storing, and replacement of soil on mined segments. address of the permit holder, and the application number ❑ Waste rock piles and how they will be reclaimed and on every page of the material. stabilized. ❑ The plan contains predominantly relevant information. ❑ Operation plant and processing areas. When signed by the applicant and approved by the Department of Measures taken to protect adjacent surface resources, Natural Resources, this document and the associated maps, cross ❑ sections, and other attachments will be the approved reclamation including prevention of slumping or landslides on plan for this permit that the permit holder must follow.Significant adjacent lands. variations from the approved reclamation plan may require that a new plan be submitted to the Department for approval. ❑ Location and description of the erosion control systems, µ including drainage facilities and settling ponds. I by agree to copith the an. Date signed ❑ Other pertinent features. FINAL RECLAMATION MAP (Signaturff.pplicant/pe►mft holder) r This is a topographic map of the site as it will look after final I hereby verify that I have see n and approve this plan. Date signed reclamation. It must show all applicable data required in the narrative portion of the reclamation plan and details of the mine reclamation.The map should cover the same area as the pre-mining topographic map and should display the following information: ❑ Permit area plus an appropriate border on all sides. (Signatures of all Individuals with possessory Interest) ❑ Final elevations and contours, adjacent natural ground slopes, reclaimed drainage patterns, and other FOR DEPARTMENTAL USE ONLY: topographic features. Approved by Date approved ❑ Locations and names of all roads, railroads, utility lines, or any other rights of way. Comments by Region ❑ Locations and names of all streams and drainages. ❑ Locations and names of significant buildings, parks, and other structures, facilities, or features. ' Existing wetland should be clearly shown on the plans. If wetland questions arise,contact the Department of Ecology(DOE). 2 Information about geology may be available from the Department of Natural Resources,Division of Geology and Earth Resources,P.O.Box 47007, Olympia, WA 98504-7007, (206) 902-1450 or the USGS, (509)353-2524. Standard Reclamation Plan(Form SM4A).Page 12 of 12 Rectamation PWMWApptieation No. P~-7 Q N3 • �, _ V \� `0S , old � g d► 1 i i 6� 4 .ice � r 1� SAFACE MINE r WASHINGTON STATE DEPARTMENTOF SKETCH MAP Natural Resources (Form SM-1 UA) To be used with Form SM-10 Iva•yy N--4 Sc'/4 Sec T 2-0 N, R Scale � = ova ! Date Sketch the pit outline in plan view on the grid below, showing and labeling north arrow, segments, and section, township, and range boundaries.A cross section may be added at the bottom if necessary. Choose a scale that appropriate to the drawing. Tr `v`e- ............................. i -.--_---------�----i... ------•---�---A- ....... .. f - . I .......--•-•-• .......................................•••.........---- -••--••-----•-•------•....--------•-............_.....-----.. ................ ........... --...... I ................................. - ................ _...... fi— 'Z 541 . . . I . . . . . . . . . .................... - �. --* ----------------------------.. ...__------------------------ ............................... >< 'x >< --•------------- - ------ ..---•:.----------...............---... ....... _.....— I Surface Mine Sketch M�., SM-10A) Revised 9/93 Reclamation Permit No.