HomeMy WebLinkAboutSHX2002-00003 Utility Line see location description - SHX Permit / Conditions - 1/22/2002 ypN STA MASON COUNTY
4P hid DEPARTMENT OF COMMUNITY DEVELOPMENT
oN = r� r/"� , • ^� Planning Division
Y O Box 279, Shelton, WA 98684
7864 (360)427-9670, Ext. 296
n from Shoreline Management Ac
Case No. SHX20 00030 Substantial Development Permit Requiremen
The Proposal By: MASON CO PUD 3
307 W COTA �1 p ►�
ATTN: TERRY PETERSON
SHELTON, WA 98584 �(,�_1n,bt/ Vi�la�
To undertake the following development. ,'f� -�9� p `b
Within shoreline jurisdiction: Maintain existing 7,200 volt underground power line by installing a
new line in same vicinity (normal method of repair is replacement), New power lines will be
installed in 2-inch and 4-inch conduit at a depth of 42 inches. An additional 2in conduit will be
installed for future needs of the utility (i.e. repair of line with replacement line). All trenching will
be done by a backhoe and will terminate in existing transformers. Portions of Lakeland Drive,
Westlake Drive North, Lakeshore Drive, Westlake Pl, Westlake Way within the 200 ft shoreline
jurisdiction of Anderson Lake.
Within Anderson Lake and/or its associated wetlands is exempt from the requirement of substantial
development because the development is categorized under WAC 173-1-040(B) as being category
B-normal maintenance
Issued: 1/22/02
Expires. 7/22/02
Authorized Local Government Official
cc: APPLICANT WDFW USACOE
WDOE WDW CMMR/DIRECTOR OF DCD
TRIBAL COUNCIL
S r't vo -
�/22i02 Conditions Associated with Case #: SHX2002-00003
r 1:04:27 PM
Cond. Stat. Changed Updated
Code Title Hold Status Changed By Tag Updated By
0001 "CUSTOM CONDITION" 0 Not Met 1/22/02 PBC
Temporary erosion control features such as silt fences and straw bales shall be installed where needed to control erosion and
stop silt entering waters of the state. Features shall remain in place until project is complete and danger of siltation is past.
x
0001 "CUSTOM CONDITION" 0 Not Met 1/22/02 PBC
Site shall be restored to pre-project condition. x
0001 "CUSTOM CONDITION" 0 Not Met 1/22/02 PBC
This shoreline exemption is issued under the provisions for maintenance and repair found within the Mason County Shoreline
Master Program,which provides for total replacement where such activity is the common practice of repair(see Definitions
Chapter 7.08"Normal Repair'. PUD cknowledges that the additional conduit approved under this normal maintenance and
repair section,is understood by MasorlCounty to be for future utility line repair as described here. Should the utility elect to use
the conduit approved in this project for use other than described here,a shoreline Substantial Development Permit application
shall be submitted for the project,and shall be understood to include the portion of this current project originally approved for
future power line repair,but now being proposed for a different use. x