HomeMy WebLinkAboutPAR2007-00018 Case Notes - PAR Letters / Memos - 2/28/2007 5/15/2007 Case Activity Listing 10:07:34AM Case#: PAR2007-00018 P14 Assigned Done To By Updated Updated By PARA10 Application Received 2/28/2007 None DONE KS 3/29/2007 H K I PARB50 Public Works Review 2/28/2007 3/14/2007 None DONE JES JES 3/15/2007 JES Stormwater plan for work should be developed per DOE Puget Sound Basin Stormwater Manual 1992. Contact Public Works Larry Foresman and Doug Ellingson in regards to crossing County Roads with pipelines/excavation work. Larry 360 490-0059 and Doug 427-9670 x606. Geological Assessment would be required if work is located with 300 feet of 1540 percent slopes. Geotechnical Report is required if work within 300 feet of slopes 40 percent or greater with more than 10 feet vertical relief. PARA910 Meeting 3/14/2007 None DONE BKD BKD 3/21/2007 BKD APPLICANT: CITY OF SHELTON PUBLIC WORKS DEPT. MEETING DATE/TIME:MARCH 14,2007-2:45/3-4PM PARCEL NUMBERS:420120060000 AND ADDITIONAL SITE ADDRESS:N/A PROJECT DESCRIPTION:CONSTRUCTION OF TWO PIPELINES MEETING LOCATION.BUILDING III PLANNER TAMMI C.,EXT.295 AND PAM B.C.,EXT.287 E.H.:CINDY W.,EXT.353 NOTES SENT 3/21/2007 PARB10 Planning Review 2/28/2007 3/15/2007 None DONE PBC 3/15/2007 PBC Proposed sewage pipeline and reclaimed water pipeline will be located within mainly Rural designation lands,with the most easterly portion being withiin the Shelton Urban Growth Area. Mason County Resource Ordinance: Lands are designated as Category II Critical Aquifer Recharge Area(CARA)per the CARA chapter 17.01.080. As such the project requires a Mason Environmental Permit. Shelton will also need to execute Critical Area Title Notification(contact area planner for questions about the process). Other Critical Areas: if pipeline route review indicates that there are other critical areas or buffers in the path,those applicable chapters of the Resource Ordinance will apply. SEPA:The pipeline requires review under SEPA;the County will be lead for the pipeline SEPA,as the most local permitting agency.The City of Shelton,who is in the process of annexing the site proposed for the actual water reclamation plant,will be SEPA lead for the plant,assuming that by that time they will be the agency with jurisdiction over that land. Page 1 of 2 CaseActivity..rpt Case Activity Listing 5/15/2007 10:07:34AM Case#: PAR2007-00018 i ' Asstgn one Activity Description Date i Date Date 3; Hold Disp T B n Updated Updated By PARB20 Building Plan Review 2/28/2007 3/15/2007 None DONE DLC 3/15/2007 DLC The installation of pipeline serving sanitary sewer and domestic water do not require a building permit for construction. Any structure required to sevice the distribution services shall require a separate building permit and approval for each separate structure. All land modification activities shall comply with Mason County Code,Title 14,Section 14.44,Excavation&Grading. If you have questions concerning land modification permits or compliance to the referenced code contact the Mason County Building Department at(360)427-9670 ext.356. To access Mason County code on the web,visit the Mason County web site at:http://www.co.mason.wa.us/code/commissioners/index.htm. PARB40 Environ.Health Review 2/28/2007 3/15/2007 None DONE PJO 3/15/2007 PJO This project does not include onsite septic or drinking water so it is outside of Environmental Health's review criteria.EH has no issues. PARB60 Fire Marshal Review 2/28/2007 3/21/2007 None DONE CJH CJH 3/21/2007 BKD Emergency Vehicle Access: Maintain one lane open to facillitate emergency vehicle access during pipe installation and construction. Page 2 of 2 CaseActivity..rpt