Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2024-00622 MFG Home - BLD Engineering / Geo-tech Reports - 5/30/2024
HUD Engineering Certification Report 551 SE Crescent Dr Shelton, WA Prepared for: MORKEN, STANLEY C "� �,-S x - . 1 s MM 71 h � I ORNERSTONE r X ® • , • of .r - .ty.., �` , . 'RIM _-� z Registered Field Technician Engineer Cornerstone Inspections Patrick Conroy 360.701.8363 616-822-9070 Cornerstonellcwa@gmail.com WA License#34380 Table of Contents Table of Contents 2 General 3 Client & Site Information 3 Climatic Conditions 3 Building Characteristics 4 Structural 6 Structure - Foundation 6 Terms and Conditions 8 Page 3 of 9 General Client & Site Information 1.1 Inspection Date May 23, 2024 05:00 PM 1.2 Client MORKEN, STANLEY C 1.3 Inspection Site 551 SE Crescent Dr Shelton, WA, 98584 1.4 Address Image 1.5 Vacancy Vacant Climatic Conditions 1.6 Weather Partly Cloudy and Light Rain 1.7 Soil Conditions N/A 1.8 Outside Temperature 58' MORKEN,STANLEY C 551 SE Crescent Dr Shelton,WA 98584 Confidential-for client use only.Use by any unauthorized persons is prohibited Copyright©2024 MFD Home Certifications US LLC.All rights reserved. Report mayn't be reproduced in part or in whole without express written permission by MFD Home Certifications. Page 4 of 9 Building Characteristics 1.9 Elevation Pictures �TF Z f a�10 1.10 Date of Manufacture 1980 1.11 Building Type Double-wide 1.12 Rough Exterior Dimensions 27'x 48' 1.13 HUD Label 1 ►.. 1.14 HUD Label 2 1.15 Data Sheet The data sheet is missing or not accessible 1.16 Foundation Type Crawlspace MORKEN,STANLEY C 551 SE Crescent Dr Shelton,WA 98584 Confidential-for client use only.Use by any unauthorized persons is prohibited Copyright©2024 MFD Home Certifications US LLC.All rights reserved. Report mayn't be reproduced in part or in whole without express written permission by MFD Home Certifications. Page 5 of 9 1.17 Foundation Type Images ak t 1.18 Interior Support Structure Concrete Masonry Units 1.19 Piers Rest On Concrete Footing or pad 1.20 Wheels Wheels and axles are Removed 1.21 Tongues Removed from Frame MORKEN,STANLEY C 551 SE Crescent Dr Shelton,WA 98584 Confidential-for client use only.Use by any unauthorized persons is prohibited Copyright®2024 MFD Home Certifications US LLC.All rights reserved. Report mayn't be reproduced in part or in whole without express written permission by MFD Home CertRications. Page 6 of 9 Structural Structure - Foundation 2.1 Exterior Grading Reasonable grading around the home. 2.2 Exterior Grading Images t .,r., y 2.3 Skirting Galvanized Metal 2.4 Anchor Method Proprietary Restraint System (Front left and Back right) 2.5 Anchor Method Images Is 'W- 4a, W- r!_77- - - MORKEN,STANLEY C 551 SE Crescent Dr Shelton,WA 98584 Confidential-for client use only.Use by any unauthorized persons is prohibited Copyright©2024 MFD Home Certifications US LLC.All rights reserved. Report mayn't be reproduced in part or in whole without express written permission by MFD Home Certifications. Page 7 of 9 HUD Engineering Certification Report Summary Date: May 29, 2024 Client: MORKEN, STANLEY C RE: 551 SE Crescent Dr Shelton,WA 98584 Permanent Foundation As requested,we have evaluated the site conditions and foundation of the existing manufactured home for conformance with the Permanent Foundation Guide for Manufactured Housing;September, 1996.The purpose of this evaluation is for the resale, purchase,financing,or refinancing of the home. Our investigation and evaluation has been based on a visual review of the readily accessible areas of the foundation and overall surrounding site. The scope of the inspection included the foundation of the house. On May 23, 2024 05:00 PM,we made a site visit to evaluate the site drainage conditions and house foundation. We observed that the manufactured structural frame of this Double-wide house is supported permanently to a foundation in the crawlspace. We observed that horizontal and vertical uplift restraint had been provided at various locations.The manufactured frame had been fastened to the foundation adequately.The overall integrity of the foundation was in good condition. Based on the information observed,we are of the opinion that the house foundation has been constructed in accordance with HUD/FHA Guidelines- Permanent Foundation Guide for Manufactured Housing; September, 1996. The foundation meets HUD guidelines for manufactured housing dated Sept 1996. The HUD PFGMH is a minimum standard for tie-down systems required to meet federally-backed loan requirements. Even with tiedown systems that meet the most stringent standards, mobile and manufactured homes are considered unsafe structures in violent or extreme weather such as, but not limited to,severe thunderstorms,floods,derechos, tornados and hurricanes. 1st Permanent Location No visible on-site evidence was noted or observed which would indicate that the Manufactured home was moved from another"permanent" location. If you have any questions or need clarification regarding this report, please contact Bryan Woods of Cornerstone Inspections at 360.701.8363 or email Cornerstonellcwa@gmail.com. Thank you. Sincerely, ' '�� K,C Co wASF,,ti^�- �t _ L Patrick Conroy 616-822-9070 ,o R. 34390 WA License#34380 ��%►s`n'-��' '1SS10 'AL LNG MORKEN,STANLEY C 551 SE Crescent Dr Shelton,WA 98584 Confidential-for client use only.Use by any unauthorized persons is prohibited Copyright©2024 MFD Home Certifications US LLC.All rights reserved. Report mayn't be reproduced in part or in whole without express written permission by MFD Home Certifications. Page 8 of 9 Cornerstone Inspections 360.701.8363 Cornerstonellcwa@gmail.com Terms and Conditions This Report is expressly made subject to the following terms and conditions to which all persons that receive and rely thereon agree: 1. Said Report is given with the skill and care ordinarily used by members of the engineering profession practicing under similar conditions at the same time and in the same locality and applies only to facts that are within Engineer's knowledge or could reasonably have been ascertained by ENGINEER. 2.Said Report reflects and is an expression of the professional judgment of ENGINEER. 3.Said Report is given as to the best of Engineer's knowledge, information, and belief as of the date hereof. 4.Said Report is based entirely on and expressly limited by the scope of services ENGINEER has been employed by Client to perform. 5.To the fullest extent permitted by law, Client and Engineer(1)waive against each other, and the other's employees, officers, directors, agents, insurers, partners, and consultants, any and all claims for or entitlement to special, incidental, indirect, or consequential damages arising out of, resulting from, or in any way related to this report, and (2) agree that Engineer's total liability to Client shall be limited to the total amount of compensation received by Engineer. 6.This Report was produced and provided for the Client by the ENGINEER or his assistant trained in these inspections working directly under the supervision of the ENGINEER. 7.The parties acknowledge that Engineer's scope of services does not include any services related to a Hazardous Environmental Condition (the presence of asbestos, PCBs, petroleum, hazardous substances or waste, and radioactive materials). 8.This inspection is only for compliance with HUD Guidelines and does not include or address local or state guidelines, other building codes or jurisdiction requirements. MORKEN,STANLEY C 551 SE Crescent or Shelton,WA 98584 Confidential-for client use only.Use by any unauthorized persons is prohibited Copyright©2024 MFD Home Certifications US LLC.All rights reserved. Report mayn't be reproduced in part or in whole without express written permission by MFD Home Certifications.