Loading...
HomeMy WebLinkAboutSEP2007-00062 - SEP Determinations - 2/15/2017 oN STATE MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT o r ° S N =N Planning Division ° Y n P O Box 279, Shelton, WA 98584 �0 (360)427-9670 1864 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00062 Description of Proposal: The proposal is for the construction of 2 new pipelines in a Critical Aquifer Recharge Area as part of the Shelton Regional Water and Wastewater System. The pipelines will convey wastewater and reclaimed water between the Washington Corrections Center, the Washington State Patrol Academy, and the proposed Shelton Water Reclamation Plant. Proponent: CITY OF SHELTON (DENNIS MCDONALD) Site Address (If Assigned): 12001 N U.S.HIGHWAY 101 SHELTON Directions to Site: Parcel Number: 420024400010 Legal Description: TR 1 IN SECS 2, 11 & 12 PCL 1 OF BLA #94-77 AF#595248 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Tammi Clark at ext. 295 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 6/4/2007. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00062 CONDITIONS OF THIS DETERMINATION 1) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 2) Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. X 3) Applicant acknowledges that this proposal will be designed in such a manner to avoid pp 9 p p g impact to Mason County Critical Areas and their buffers. X 4) The applicant shall implement Best Management Practices (BMP), implement the Washington State Department of Ecology's Storm Water, Water Quality, Hazardous Waste, Wetland, and Solid Waste Program BMP and BMP from the Departments of Health, Agriculture, Transportation, and State Conservation District Office.X 5) Notification of Aquifer Recharge shall be recorded with the Mason County Auditor's Office prior to permit approval. X MASON COUNTY DCD Sent SEPA �I 001-", ,;t to (check all that apply)on L O Skokomish Tribal Nation F1 WA Dept.of Ecology(saltwater) Natural Resources Dept. ATTN: Shoreline Permit Reviewer ATTN: Marty Ereth Southwest Regional Office N 541 Tribal Center Rd. PO Box 47775 Shelton,WA 98584 Olympia,WA 98504-7775 Quinault Indian Nation WA Department of Ecology(freshwater) ATTN: Mark Mobbs Environmental Review Section PO Box 189 PO BOX 47703 Tahola,WA 98587 Olympia,WA 98504-7703 Squaxin Tribal Nation U.S.Army Corps of Engineers Natural Resources Dept. SEPA Reviewer 2952 SE Old Olympic Highway PO Box C-3755 Shelton,WA 98584 Seattle,WA 98124 The Confederated Tribe of the Chehalis WA Dept.of Fish and Wildlite ATTN: SEPA Reviewer ATTN: Margie Schirato(saltwater) 420 Howanut Rd. 2391 W Deegan Rd. Oakville,WA 98568 Shelton,WA 98584 Courtney Wasson WA Dept.of Fish &Wildlife WA DNR, South Puget Sound Region ATTN: Gloria Rogers(freshwater) 950 Farman Avenue North PO Box 695 Enumclaw,WA 98022-9282 Elma,WA 98541 0 Boyd Powers WA Dept.of Transportation WA DNR, SEPA Center Environmental Policy&Coord. PO BOX 47027 HWY Administration Bldg. Olympia,WA 98504-7027 Olympia,WA 98504 ® Olympic Region Clean Air Agency City of Shelton 2940-B Limited Ln. NW 525 West Cota St. Olympia,WA 98502 Shelton,WA 98584 Mason County Transit Office of Archeaology&Historic Preservation PO Box 1880 ATTN: Stephanie Kramer Shelton,WA 98584 P.O. Box 48343 Olympia,WA 98504-8343 Agent School District Applicant Mason Cty Public Works ATTN:John Sliva Mason Cty Bld.ATTN: Mason Cty Env. Health ATTN: MASON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT REQUEST FOR COMMENT FORM Project Number: SEP2007-00062 Date of Complete Application: May 15, 2007 Property Location: SR102 alignment is along WSDOT public right-of-way. The legal description for the easement that has been secured across the Port of Shelton is attached. Zoning: Shelton Urban Growth Area and Rural Residential 5 Project Description: Construction of two new pipelines in a Critical Aquifer Recharge Area as part of the Shelton Regional Water and Wastewater System. The pipelines will convey wastewater and reclaimed water between the Washington Corrections Center, the Washington State Patrol Academy, and the proposed Shielton Water Reclamation Plant. Return comments to CDD no later than:1 MAY 30,200 If you have any questions or need clarification on this project,please contact the CDD - @ (360)427-9670 or email tammic(a),,co.mason.wa.us Responsible Staff. Tammi Clark Agency: Name of Individual Submitting Comments: Title: This project would/would not(please circle one) affect this department. Comments(please attach memo if additional space is needed): The following conditions should be attached to this permit to ensure compliance with the requirements of this department(please attach memo if additional space is needed): Date: Signature: Phone/E-Mail: SEPA ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project,if applicable: Shelton Regional Water and Wastewater System—Conveyance/Reclaimed Water Pipelines 2. Name of applicant: City of Shelton 3. Address and phone number of applicant and contact person: Mr.Dennis McDonald Project Manager City of Shelton Public Works Department 525 W. Cota Street Shelton, WA 98584 360-432-5167 4. Date checklist prepared: April 19, 2007 5. Agency requesting checklist: City of Shelton Public Works Department 6. Proposed timing or schedule(include phasing,if applicable): Construction of the proposed pipelines is scheduled to begin in mid-2007. The project will take approximately 6 to 9 months to construct. 7. Do you have any plans for future additions,expansion,or further activity related to or connected with this proposal? If yes,explain. Yes. The proposed project is described in the "Shelton Regional Sewer Plan — Wastewater Facility Plan" (Cosmopolitan Engineering Group, April 2006). The proposed pipelines will convey wastewater and reclaimed water between the Washington Corrections Center (WCC), the Washington State Patrol (WSP) Academy, and the proposed Shelton Water Reclamation Plant (WRP). Construction of the WRP and related improvements at WCC and WSP will be performed as a separate project with a separate environmental review process with the City of Shelton acting as the lead agency. 8. List any environmental information you know about that has been prepared,or will be prepared, directly related to this proposal. An Environmental Report was prepared for the Shelton Regional Water and Wastewater System ("Environmental Report for the Shelton Regional Water and Wastewater Plan"—Parametrix, Inc., May 2005). This Environmental Report covered both the proposed regional water and wastewater systems. EPA (April 20, 2006)and USDA—Rural Development(October 5, 2005) have both issued a City ojShelton—Regional Water and Wastewater System Job 216-2125-016(0414) ConveyancelReclaimed Water Pipelines 1 April2007 SEPA Environmental Checklist Finding of No Significant Impact(FONSI)for the portion of the Environmental Report that describes the proposed regional wastewater system. Copies of the FONSI determinations are attached to this checklist. (A determination for the proposed regional water system has not yet been issued by the federal agencies) 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes,explain. The City is in the process of securing franchise agreements from WSDOT to allow the installation of the pipelines within WSDOT right-of-way along SR-102. Easements for the pipeline alignment through Port of Shelton property are also in process. 10. List any government approvals or permits that will be needed for your proposal,if known. Washington State Department of Ecology and Health approvals for the contract documents for the construction of the WRP will be required. Health's approval of the Facility Plan for the project is pending (as of April 19, 2007). Franchise agreements with WSDOT will need to be secured for the pipelines.A Mason County Environmental Permit will be required. 11. Give a brief,complete description of your proposal,including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal.You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The proposed project consists of two pipelines: 1. A raw sewage pipeline will be constructed to convey wastewater from WCC and WSP to the proposed Shelton Water Reclamation Plant. The pipeline will consist of approximately 9,200 feet of 10-inch force main and 11,900 feet of IS-inch and 18-inch gravity sanitary sewer. 2. A reclaimed water transmission main will convey reclaimed water from the WRP to WSP and WCC for beneficial reuse. Reclaimed water that is not reused will be conveyed to the existing WCC sprayfield in order to implement the land application of Class A reclaimed water for groundwater recharge. The pipeline will consist of approximately 24,300 feet of 12-inch HDPE transmission main. Construction of the reclaimed water pipeline and its connection to the existing WCC sprayfield will result in the existing sprayfield remaining in service once the WCC treatment plant is taken off line. The pipelines will be installed in easements secured from the Port of Shelton and in public right- of-way along SR-102. Pipelines will be constructed inside the Port of Shelton to extend the gravity sewer and reclaimed water pipelines towards Shelton Springs Road. The last portion of these pipes would cross a privately-owned parcel in an easement that has yet to be secured. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project,including a street address,if any,and section,township,and range,if known. If a proposal would occur over a range of an area,provide the range or boundaries of the site(s). Provide a legal description,site plan,vicinity map,and topographic map if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. See the attached Figure I (vicinity map) and Figure 2 (topographic map). Preliminary construction drawings for the pipeline alignment are attached. The pipelines will be constructed along easements and public right-of-way in Sections 2, 3, 4, 9, 11, and 12 of Township 20N,Range 4 West, W.M. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 2 April2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENT ELEMENTS 1. Earth a. General description of the site(circle one): flat, olling,hilly,steep slopes,mountainous,other. b. What is the steepest slope on the site(approximate percent slope)? The pipeline alignments are along ground that is generally flat. Total elevation gain over the entire alignment (more than 20,000 feet) is approximately 45 feet. c. What general types of soils are found on the site(for example,clay,sand, gravel,peat,muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. A soils report has been prepared for the project. Summary findings of the report are as follows: Project site is generally underlain by Vashon Recessional Outwash. A portion of the project site within the Port of Shelton is underlain with Vashon Glacial Till. Topsoil typically extends to a depth of 3 to 6 inches. Horizon B topsoil extends to a depth of about 3 feet below the topsoil and generally consists of a loose mixture of silt and sand with varying amounts of roots. The Vashon recessional outwash underlays the topsoil layers and consists of medium dense to dense sand and gravel with trace amounts of silt. No agricultural soils were noted in the soils report and the project does not cross prime farmland. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,describe. There is no known history of unstable soils. e. Describe the purpose,type,and approximate quantities of any filling or grading proposed. Indicate source of fill. Pipe excavations will be backfilled to existing grade. No additional filling or grading is proposed other than to restore the ground along the pipe alignment to the pre-existing condition. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclafined Water Pipelines 3 April2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY f. Could erosion occur as a result of clearing,construction,or use? If so, generally describe. Yes, erosion could occur on cut slopes and stockpile areas if erosion measures are not taken. The contractor will be required to implement temporary erosion and sedimentation control measures, consistent with City of Shelton standards during clearing and construction operations. g. About what percent of the site will be covered with impervious surfaces after project construction(for example,asphalt or buildings)? No new impervious surfaces will be created by the construction of the project. h. Proposed measures to reduce or control erosion,or other impacts to the earth,if any: Measures to minimize erosion during construction will include covering stockpile areas, placement of silt fence, and covering of stripped areas with straw. Disturbed areas will be revegetated as soon as possible after construction. 2. Air a. What types of emissions to the air would result from the proposal(for example: dust,automobile odors,industrial wood smoke)during construction and when the project is completed? If any,generally describe and give approximate quantities if known. During construction, emissions could potentially include dust and exhaust from equipment. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,generally describe. No. c. Proposed measures to reduce or control emissions or other impacts to air, if any? Gravity manhole covers along the pipeline will be unvented in order to minimize the escape offugitive odors from the sanitary sewer. 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site(including year-round and seasonal streams,saltwater,lakes, City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 4 April 2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY ponds,wetlands)? If yes,describe type and provide names. If appropriate,state what stream or river it flows into. No. There are no surface water bodies along the pipe alignment route. 2) Will the project require any work over,in,or adjacent to(within 200 feet)the described waters? If yes,please describe and attach available plans. No. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site what would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description,purpose,and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so,note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so,describe the type of waste and anticipated volume of discharge. No. b. Ground: 1) Will ground water be withdrawn,or will water be discharged to ground water? Give general description,purpose,and approximate quantities if known. The soils report for the project states that dewatering of trenches to remove groundwater is not considered necessarily likely. If excavation dewatering is found to be necessary, water that is pumped from trenches will be treated and disposed of consistent with WSDOT, Mason County, Port of Shelton, and City of Shelton standards. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 5 April 2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY Class A reclaimed water that is generated at the WRP and conveyed through the reclaimed water transmission main will be put to beneficial use at WCC or the WSP Academy or land applied to the surface at the existing WCC sprayfield to recharge groundwater. This sprayfield currently is used for disposal of treated wastewater from the WCC treatment plant, in conformance with the requirements of the plant discharge permit. Reclaimed water that is not taken up by trees on the site via evapotranspiration will ultimately reach the groundwater below the site and then migrate away from the site. The WRP will be sized to treat a maximum monthly flow of 400,000 gallons per day. This is the same flow that the existing sprayfield is permitted to receive per the State Waste Discharge Permit for the WCC treatment plant issued by the Department of Ecology. New Reclaimed Water and State Waste Discharge Permits will be issued by Ecology and Health for the change in use at the existing sprayfield. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources,if any(for example: domestic sewage; industrial,containing the following chemicals: ; agricultural: ;etc.). Describe the general size of the system,the number of such systems,the number of houses to be served(if applicable),or the number of animals or humans the system(s)are expected to serve. None. c. Water Runoff(including storm water): 1) Describe the source of runoff(including stone water)and method of collection and disposal,if any(include quantities,if known). Where will this water flow? Will this water flow into other waters? If so, describe. Runoff may occur from trench excavation sites. 2) Could waste materials enter ground or surface waters? If so, generally describe. No. d. Proposed measures to reduce or control surface,ground,and runoff water impacts,if any: The contractor will be required to prepare a Temporary Erosion and Sedimentation Control(TESL)plan and the plan will be reviewed to ensure compliance with WSDOT, Mason County, Port of Shelton, and City of Shelton standards. See the attached memo from Cosmopolitan Engineering Group regarding stormwater control for the project. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 6 April2007 SEPA Environmental Checklist i TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 4. Plants a. Check or circle types of vegetation found on the Site: Deciduous tree:alder,maple,aspen,other X Evergreen tree:fir,cedar,pine,other Shrubs Grass Pasture Crop or grain Wet soil plants: cattail,buttercup,bulrush,skunk cabbage,other Water plants:water lily,eelgrass,mil foil,other Other types of vegetation b. What kind and amount of vegetation will be removed or altered? A number of trees along the pipeline alignment within WSDOT right-of- way and on Port of Shelton property will need to be removed to allow installation of the pipes. c. List threatened or endangered species known to be on or near the site. None. d. Proposed landscaping,use of native plants,or other measures to preserve or enhance vegetation on the site,if any. Trees that are removed along the Port of Shelton pipeline alignment will be replaced at a ratio of 1.75 trees for each tree removed. Trees will be planted at locations directed by the Port. 5. Animals a. Circle any birds and animals that have been observed on or near the site or are known to be on or near the site: Birds: Ew heron eag a ongbir other: Mammals eer, ear,elk,beaver,other: Fish: bass,salmon,trout,herring,shellfish,other: b. List any threatened or endangered species known to be on or near the site. According to the Environmental Report, the only listed wildlife species in the vicinity of the project is the bald eagle. In addition, the Shelton pocket gopher, which is reported to be a candidate for listing as threatened or endangered, has been documented to be present at Scotts Prairie at Sanderson Field. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 7 April2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Is the site part of a migration route? If so,explain. None known. d. Proposed measures to preserve or enhance wildlife,if any: None proposed. Construction of the pipeline is not expected to impact wildlife. 6. Energy and Natural Resources a. What kinds of energy(electric,natural gas,oil,wood stove,solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating,manufacturing,etc. Electricity will be required to operate motorized valves that will be used to control flows in the reclaimed water transmission line. b. Would your project affect the potential use of solar energy by adjacent properties? If so,generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts,if any: None proposed. 7. Environmental Health a. Are there any environmental health hazards,including exposure to toxic chemicals,risk of fire and explosion,spill,or hazardous waste,that could occur as a result of this proposal? If so,describe.None. 1) Describe special emergency services that might be required. None. 2) Proposed measures to reduce or control environmental health hazards,if any: None. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 8 April 2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic,equipment,operation,other)? None. 2) What types and levels of noise could be created by or associated with the project on a short-term or a long-term basis(for example:traffic, construction,operation,other)?Indicate what hours noise would come from the site. Increased noise will be generated at the site during construction, which is expected to last approximately 6 months. Once construction is completed, there will be no new sources of noise. 3 Pro posed measures to reduce or control noise impacts,if any: None proposed. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? WSDOT-owned public right-of-way and unoccupied property owned by the Port of Shelton. b. Has the site been used for agriculture? If so,describe. No. c. Describe any structures on the site. There are no existing structures at the site. d. Will any structures be demolished? If so,what? No. e. What is the current zoning classification of the site? Public right-of-way. f. What is the current comprehensive plan designation of the site? Industrial(Port of Shelton)and public right-of-way. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 9 April 2007 SEPA Environmental Checklist L TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY g. If applicable,what is the current shoreline master program designation of the site? Not applicable. h. Has any part of the site been classified as an "environmentally sensitive" area? If so,specify. No. i. Approximately how many people would reside or work in the completed project? None. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts,if any: None. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any: The City will apply for, and secure, a Mason County Environmental Permit for the project. 9. Housing a. Approximately how many units would be provided,if any? Indicate whether high,middle,or low-income housing. None. b. Approximately how many units,if any,would be eliminated? Indicate whether high,middle,or low-income housing. None. c. Proposed measures to reduce or control housing impacts,if any: None. 10. Aesthetics a. What is the tallest height of any proposed structure(s),not including antennas? What is the principal exterior building material(s)proposed? No buildings will be built as part of the project: City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 10 April 2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. What views in the immediate vicinity would be altered or obstructed? None. c. Proposed measures to reduce or control aesthetic impacts, if any: None. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? None. c. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any: None. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? None known. b. Would the proposed project displace any existing recreational uses? If so,describe. No. c. Proposed measures to reduce or control impacts on recreation,including recreation opportunities to the provided by the project or applicant,if any: None. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclafined Water Pipelines 11 April2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 13. Historic and Cultural Preservation a. Are there any places or objects listed on,or proposed for,national,state, or local preservation registers known to be on or next to the site? If so, generally describe. None known. b. Generally describe any landmarks or evidence of historic,archaeological, scientific,or cultural importance known to be on or next to the site. The original ground surface along the proposed alignment has largely been disturbed by prior construction activities for the State highways and Port utilities. A cultural resources survey was prepared as part of the Environmental Report for the Regional Water and Wastewater System. A search of files at the Washington State Office of Archaeology and Historic Preservation showed that no archaeological sites are located within 2 miles of the project area. c. Proposed measures to reduce or control impacts,if any: An Unanticipated Discovery Plan will be prepared and in place prior to the beginning of construction.As stated in the Environmental Report, `In the event that ground disturbance or other construction activities result in the inadvertent discovery of archaeological and/or cultural resources, work will be halted in the immediate area and contact made with Mason County officials, the office of the State Historic Preservation Officer (SHPO), and Squaxin Tribal Cultural Resources Department (CRD). In the unlikely event of the inadvertent discovery of human remains, work will be immediately halted in the discovery area, the remains covered and secured against further disturbance, and communication established with County administrative and law enforcement personnel, the office of the SHPO, and representatives of Squaxin Tribal CRD. All work will be halted until further investigation and appropriate consultations are concluded." 14. Transportation a. Identify public streets and highways serving the site,and describe proposed access to the existing street system. Show on site plans,if any. The pipeline alignment from the Port of Shelton to WCC will be in WSDOT public right-of-way along SR-102. Through the Port, much of the alignment is along existing Port roads. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 12 April2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Is site currently served by public transit? If not,what is the approximate distance to the nearest transit stop? Not applicable. c. How many parking spaces would the completed project have? How many would the project eliminate? None. d. Will the proposal require any new roads or streets,or improvements to existing roads or streets,not including driveways? If so,generally describe(indicate whether public or private). Segments of existing roadways that are impacted by construction of the pipelines will be restored, consistent with conditions of the franchise agreements with WSDOT. Along the alignment through the Port, roadways will be restored to match existing conditions. e. Will the project use(or occur in the immediate vicinity of)water,rail,or air transportation? If so,generally describe. A portion of the pipeline alignment will cross the area immediately east of the Sanderson Field runway. f. How many vehicular trips per day would be generated by the completed project? If known,indicate when peak volumes would occur. None. g. Proposed measures to reduce or control transportation impacts,if any: Construction documents for the project will require that a minimum of one lane of traffic be kept open along SR-102 throughout construction. Access to all County roads along pipeline route will be maintained throughout construction. Construction of the pipelines in the vicinity of the Port of Shelton runway will require that the Contractor prepare an Aviation Construction Safety Plan and that the plan be reviewed and approved by the Port of Shelton and the City of Shelton. 15. Public Services a. Would the project result in an increased need for public services(for example: fire protection,police protection,health care,schools,other)? If so,generally describe. No. City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 13 April 2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Proposed measures to reduce or control direct impacts on public services, if any: None. 16. Utilities a. Circle utilities currently available at the site:electricity,natural gas, water,refuse service,telephone,sanitary sewer,septic system,other. None. b. Describe the utilities that are proposed for the project,the utility providing the service,and the general construction activities on the site or in the immediate vicinity which might be needed. None. ATTACHMENTS: • Figure 1—Topographic Map • Figure 2—Shelton Regional Wastewater System • FONSI Documentation • Preliminary Construction Drawings • Memo from Cosmopolitan Engineering Group regarding stormwater control for the project City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 14 April 2007 SEPA Environmental Checklist TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead a ency is lying to make its decision. Signature: Date Submitted: City of Shelton—Regional Water and Wastewater System Job 216-2125-016(0414) Conveyance/Reclaimed Water Pipelines 15 March 2007 SEPA Environmental Checklist ESA LISTED SALMONIDS CHECKLIST RECEIVED MAY 17 2001 A licant Information Project Information 426 W. CEDAR ST. Ty b1F S'�/�2TDJtJ Name T �YNJ_� c Name J*07zw -Caw✓Ey RFGt j�l$�� Phone Location P� � Description ��,'csE��Pet2 ue y.2lrJzy y�J� CA60,14. This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting theirs, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DF)V) regional office can provide information for the following two questions. 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES C NO Please describe. C,PAP'� r*-4, j/ArGl� ��/ .�- L.IS-� A-s �b�.1�1T� CSOLI�F �ryl�jv��°F /y�J�i,J �r�y21�►j> 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES X NO Uncertain Please describe. SEE- AWvF If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. April 2003 Mason County Environmental Checklist Page 15 PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity. 1. Name of watershed: �1 �� 1� eoe� ./7 2. Name of nearest waterbody: Ahyem Ap2_ < 4b, Wg 3. What is the distance from this project to the nearest body of water: a 79 �T . Often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4. What is the current land use between the project and the potentially affected water body (parking lots, farmland,etc.)? 5. Is the project above a: * natural permanent barrier(waterfall) YES NO * natural temporary barrier(beaver pond) YES NO �C * man-made barrier(culvert, dam) YES NO * other(explain): 6. If yes, are there any resident salmonid populations above the blockage? YES NO Don't know 7. What percent of the project will be impervious surface (including pavement &roof area)? Mason County Environmental Checklist Page 16 � I FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of: a. Surface water? YES NO Amount Name of surface water body b. Ground water? YES NO _) Amount From where Depth of well 2. Will any water be rerouted: YES NO bL If yes, will this require a channel change? 3. Will there be retention or detention ponds? YES NO If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface water discharge, please give the name of the waterbody. 4. Will this project require the building of new roads? YES NO Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5. Are culverts proposed as part of this project? YES NO 6. Will topography changes affect the duration/direction of runoff flows? YES NO _k_ If yes, describe the changes. 7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? YES NO If yes, how will the loss of flood storage be mitigated by your project? Mason County Environmental Checklist Page 17 WATER QUALITY: The following questions will help determine if this project could Adversely impact water quality. Such impacts can cause problems for listed species. Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging contaminants,etc. 1. Do you know of any problems with water quality, in any of the streams, within this watershed? YES NO _jk If yes, describe. 2. Will your project eit�r reduce or increase shade along or over a waterbody? YES NO �L Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade. 3. Will the project increase nutrient loading or have the potential to increase nutrient loadin contaminants (fertilizers, other waste discharges, or runoff) to the waterbody? YES NO g or 4. Will turbidity be increased because of construction of the project or during operation of the project? YES NO In-water or near water work will often increase turbidity. 5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting, and chemical sprays for vegetation management, clearing of parking lots? YES NO If yes, please describe. Mason County Environmental Checklist Page 18 VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation, thereby, adversely impacting salmon. 1. Will the project involve the removal of any vegetation from the stream banks: YES NO ,_ If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2. If any vegetation is removed, do you plan to re-plant? YES NO If yes, what types of plants will you use? Mason County Enviroiunental Checklist Page 19 UH I � q9 .(yte� I tJ rt+ SCALE 124 000 ROAD aASSWICAtKNV Jonna �i,d±{Ipa • 7hh—y i,lut—y. Lixfu-AWY,rwd,h d.Iw.1 _... - Imtvovell sua6w.._._.d..._.� a•.4 -ti�3 a ! s«o�.r.,y loaf.". s.+ {6..e./A7. UNIOymvai ce¢d... _._._ .... et• IOA �_ Ui 7vl &11�4! Nt9 � .-�rnp C----- 2 wu ...ve ieis ,��•�•• YRVU.S.-o. StBf11111.11 { > i - (JDNTOtPt INfFJiVA1.10 p¢7TR6 j. SLy"q XM- N."Y AUTDIAI bMTJ VAL 5 A!!fFRG wWBAQ10M NAl1iNJAL GWDEIIC Vr1rr1CM.IMITJM OF 1929 ! I•/77� `� urrAaNR ANo n91 MAUtff1C NOBn. ccro m rsvnrnle vwwx To na raJule:r a:w wR ��,. Si IF.LTON VAU EY,WASY` BBaA.AYIaH Ar LSHl2n nU sxm mm nLvnr�.4—To m U¢ABEsr NBvn N CAL 1—T lC HEIPII9 AIDL Y BY.f9aA QU.BPNBiLf IBGRM. NWW SNFIttNI IS'QINgKNgp ,<,mNUUAr TWTUxt To r xtArwn BY s9Boe N4707.S-Wl22o7.6n.n Mt Ewe Prelfire Tws NAP cGLwues wD.xATIQNAL w.P AtcuRAm STANDA.M CONTOURS AND ELEVATIONS --_ FOR SALE UY U.S.GEOLOGICAL SURVEY,CENVER,COl4RAlkt fs0275.OP PESTON,VIPCINIA 22VM IN METERS 19$7 j ,7A""•— '"�' .3E A FOUKA DESCRIBING TL -APNK NAPS AND SYMMI-5 15 AVAILABLE GN REQVE.91 LM A IM N Nt4_.OU,"V,991 I ,r elm ...._ a •... "'„�"t^^•...,,, i 72ftIt -., ' ,'.�oi�`1 6 1'.•',+A"�� r ,,,:-, ,. Iw %"': t:: ED7s7sr .•j E .[ 9 w.A au.A' 1fF 1 Tv�iTtW ya r 2i k hbW W. f.�..w-- .-.._a- — -�a r—// F -.: _7_._ - _ t :r 7 L fin/ ..ter•�,� -:I I I Is7tr+tit Lr4rU� ��GM« i J i l Al 17 i Bciw:_ ' r MkSeNh`6T�N I - - 7 H i17' p I �t I ONS`v ItITR ! � t. ( � ^-"—•. NMq` \� i _L - I 7 SAMI tNSON j F- �,i nw !• 7.,1T - 7-U T I 9 tl F ELD st I - J 71-7 1 ( j I N--. i ' r- , r: FIGURE 1 Memorandum I-wo 6 � 0 U P w... .. �NGIN��RING qwr PO Box 1678•Tacoma,WA 98401-1678 711 Pacific Avenue•Tacoma,WA 98402 Phone(253)272-7220• Fax(253)272-7250 M@cosmopolitaneng.com DATE: April 12,2007 TO: Jeff Morgan @ Parametrix FROM: Jim D'Aboy RE: Shelton Regional Water&Wastewater System Conveyance/Reclaimed Water Pipelines Stormwater Control(SEPA Review) FILE: PMX.014 cc: File Per your request,the following addresses the ten Minimum Requirements for stormwater management applicable to new development and redevelopment sites. Per Mason County requirements,the Minimum Requirements are: 1. Preparation of Stormwater Site Plans 2. Construction Stormwater Pollution Prevention 3. Source Control of Pollution 4. Preservation of Natural Drainage Systems and Outfalls 5. On-site Stormwater Management 6. Runoff Treatment 7. Flow Control 8. Wetlands Protection 9. Basin/Watershed Planning 10. Operation and Maintenance Minimum Requirement#1: Preparation of Stormwater Site Plans The Stormwater Site Plan for the referenced project is attached. The stormwater plan for the pipeline project is very simple as the project will not impact stormwater and will not increase stormwater runoff from the impacted area. The only potential adverse stormwater impacts will be during pipeline construction,and the BMP's shown on the construction plans and required by the specifications will mitigate these potential impacts. Minimum Requirement#2: Construction Stormwater Pollution Prevention Element#1: Mark Clearing Limits Shelton Stormwater SEPA Memo-Pipeline Project.doc Page 1 The marking of clearing limits is not applicable to this project as there is no clearing associated with the pipeline project. All construction will take place within SR-102 right-of-way or within a specified easement on Port of Shelton property. Element#2: Establish Construction Access Dedicated construction access is not required for this project,as all pipeline construction takes place adjacent to SR-102 or to the roadway system on the Port of Shelton property. Element#3: Control Flow Rates Since all stormwater generated through pipeline construction will be dealt with within the construction trench,this element is not applicable. Element#4: Install Sediment Controls All required sediment controls will be installed as part of the pipeline trench construction and will be moved as the trench construction progresses. Element#5: Stabilize Soils All exposed and unworked soils will be stabilized by application of effective BMP's appropriate to the time of year required. Element#6: Protect Slopes This element is not applicable,as the pipeline construction is taking place in very flat areas of the SR-102 right-of-way and Port of Shelton property. Element#7: Protect Drain Inlets Since there are no drain inlets to be made operable during construction,this element is not applicable. Element#8: Stabilize Channels and Outlets All existing channels and outlets will be protected as required during pipeline construction. Element#9: Control Pollutants All pollutants that occur as part of the pipeline construction will be handled and disposed of in a manner that does not contribute to the contamination of stormwater. Element#10: Control Dewatering Based on the site Geo-Technical Report,dewatering is not likely to be required to construct the project. Should dewatering be needed,all necessary BMP's will be utilized. Element#I1: Maintain BMP's Shelton Stormwater SEPA Memo-Pipeline Project.doc Page 2 J All temporary and permanent erosion and sediment control BMP s shall be maintained and repaired as needed to assure continued performance of their intended function. Element#12: Manage the Project The project will be managed and the construction scheduled so as to minimize potential for erosion and the transport of sediment. Minimum Requirement#3: Source Control of Pollution Construction practices and BMP's will be implemented as required to minimize the opportunity for stormwater to come in contact with pollutants. Minimum Requirement#4: Preservation of Natural Drainage Systems and Outfalls All natural drainage systems and outfalls will be preserved as part of the pipeline construction. Minimum Requirement#5: On-site Stormwater Management Stormwater management will be dealt with as part of the pipeline construction,but the quantity of exposed or open soil will be minimal throughout construction. Minimum Requirement#6: Runoff Treatment Since there will be no stormwater runoff from the pipeline construction,this requirement is not applicable. Minimum Requirement#7: Flow Control Since no stormwater will leave the pipeline construction site,this requirement is not applicable. Minimum Requirement#8: Wetlands Protection Since no wetlands will be impacted during the pipeline construction,this requirement is not applicable. Minimum Requirement#9: Basin/Watershed Planning This requirement is not applicable to this project. Minimum Requirement#10: Operation and Maintenance This requirement is not applicable to this project. Shelton Stormwater SEPA Memo-Pipeline Project.doc Page 3 tiasrAT UNITED STATES E NVII20hMENTAL PROTECTION AGENCY i REGION 10 " w 1200 Sixth Avenue Seattle,WA 98101 4<PROY00G Reply to Attn.Of. OW W-130 Dawn Pannell APR 2 0 2006 City of Shelton 525 West Cota Street Shelton,Washington 98584" • � I RE: Completion of NEPA for the Wastewater Component of the Shelton Regional Water and Wastewater Project • i Dear Ms.Pannell: i The requirements of the National Environmental Policy"Act(NEPA)compliance,pursuant to 40 j CFR Part 6,Subpart E,for the City of Shelton's(Cit )Regional Wastewater component of the project ' have been completed. On October 5,2005,EPA issued a Finding of No Significant Impact(FONSI)for the City's Regional Water and Wastewater Project. During the 30-day review and comment period for the FONSI and Environmental Report,EPA received a letter from the Squaxin Island Tribe,dated October 27, 2005,objecting to EPA's FONSI decision,and raised several significant issues relating to the Regional Water element of the project. There have been numerous meetings and discussions since that time about the project amongst EPA,USDA Rural Development,the Squaxin Island Tribe,and the Regional Partners(City of Shelton, Washington State Department of Corrections,and the Washington State Patrol).An amendment to the Environmental Report was completed on March 24,2006 highlighting the changes to the water and wastewater plans that have occurred since the Environmental Report was originally prepared. A consensus was reached in late March 2006 to separate the environmental review of the Regional Partner's water and wastewater systems. While there remain concerns on the part of the Squaxin Island Tribe about certain aspects of the water system,the Tribe supported moving forward with the wastewater system. This letter confirms that EPA's FONSI,issued on October 5,2005,is valid for the wastewater component of the project. Processing of grant funds may proceed for the Regional Wastewater Plan. However,the Regional Water Plan will require additional environmental review. Please feel free to contact me at'(206)553-0171 or by email at shaw.hanh e a ov with an�st y questions regarding this matter, 3 Sincerely, I Hanh Shaw NEPA Compliance Coordinator cc: Jeff Dickison, Squaxin Island Tribe R.A. Larson,USDA Rural Development 1 5 E E I i USDA Develapment United States 1leparttnent of Agriculture Rural Development Washington State Office ENITBIT D September 21,2005 SUBJECT: Sbeltorl Regional Water and Wastewater Project Recommendation of a Finding of No Significant Impact TO: Sandi Boughton P,D CP Dircctor I have re Aewed the environmental docuuzetttatzon for the Shelton Regional Water and Wastewater project. In accordance x ith 7 CFR:Fart 1794,Rural Utilities Service's Envirow.uental Policies and Procedures,the proposed project meets the classification criteria for an Environmental Assessment The public review period is complete and all public comments and outstanding issues have been addressed and resolved to the extent practicable. Therefore in accordance with 40 CFR 1508.13,Z recommend that the Agency issue a determination that the proposed proiect will not have a significant effect on the human environment and that an Environmental Impact Statement will not be prepared. .Attached for your approval is the Finding of No Significant Impact document. Please sign, .forward the document to the Rural Development processing office and the attached cover letter and bane them request that the applicant publish a public notice informing the public of our a a�Stcmvirmonmrental Coordinator l I t k i 1 n5 Black lake Blvd$W•Suite B•Olympia,WA 98512.5715 PH-(360)704-7711 FAX(360)704.7742-TfY(360)704-7772 i http:/I�wrn+,rurdev,usQa.govlwar '- i Committer!0 fho futcfie offurW communities t Rural Development is an Equal Oppottur ity Lender,Provider,and Employer.Complaint of dls4ftination should be sent to USDA, g Director.Office of Clvll Rights,Washington,D.C: 20250-041U t F 4 i USDA Developmene United Stales Oepartment of Agriculture Rural Development Washington State Office I September21,2005 SUBJECT: Shelton Regional Water and Wastewater PToj.ect Finding of No Si.grti.ficant Impact ITO: Pmjeat File I i i The attached Environmental.Assessment has been prepared anal reviewed in accordance with the ' National Environmental Policy Act,as amended(42 U.S.C.6941 et sea.); the Council on . Environmental Quality Regulations for Implementing the Procedural Provisions of the National Environmental Policy Act(40 CFR Parts 1500-1508); and 7 CFR Part 1794,Rural Utilities Sezvice's Environmental Policies and Procedures. Upon review of the a tvironxnental documentation included and referenced in;the Eavirontnental Assessment,I find that the proposed project will not have a significant impact on the human environment and for which au Environmental Impact Statement therefore will not be prepared. Ja4 I-V f Sandi Boughton Community Programs Director Rural,Development 1 A35 Slack Lake Blvd SW•Suite B•Olympia,WA 98912-5715 PH-(360)704.7711•FAX(360)704-7742.•71Y(360)704-7772 hftp 1fwww,rut-dev.usda.gov1wa1 Committed to the future of rural car.rnunftleS Rural Development is an Equal Oaporlunity Lender.Provider,and Employer.Campfaints of disaimination should W sent to USDA, Diredor,Office of Civil Rights,Washington,D.G. 202E&9410 i r -� � JUN 1 8 2007 0 U Z _ IN C June 15, 2007 "Building A Stronger Community TOGETHER" Ms. Tammi Clark Mason County Community Development Department 411 North 5`h Street Shelton, WA 98584 Dear Ms. Clark: SUBJECT: City activity to protect Critical Aquifer Recharge Area during construction. PROJECT: MEP2007-00046/SEP2007-00062 Shelton Conveyance/Reclaimed Water Pipelines The City of Shelton will be going out to bid soon on the Shelton Conveyance/Reclaimed Water Pipelines that is a part of the Regional Water and Wastewater System. The City, in conducting the construction of sewer and reclaimed water pipelines within the Mason County identified Critical Aquifer Recharge Area, will provide required notification and education. This is a requirement defined in Mason County Resources Ordinance 17.01.080(1)(3.) The contractor(s)and employees,upon selection and before start of operation,will be notified that the construction activities are being conducted in a Mason County designated Critical Aquifer Recharge Area. The contractor(s)and employees will also receive training on an annual basis"regarding all measures set forth by the BMP"defined within the specification and construction plans. The City will invite Mason County to the Pre-Bid and Pre-Construction Meetings. If you have any questions,I would be more than happy to be of assistance,please feel free to email me at dennis@ci.shelton.wa.us or call me at(360)432-5167. Sincerely, ADenni cDonald Regional Project Manager DPM:cr HARegional Plan\I-Satellite\Permits\MasonCtyPermit-Aquifer.TNGletter.doc cc: Allan Maas, Parametrix S25 W. Cota St. • Shelton, WA 98584 (360) 426-4491 *FAX (360) 426-1338 • E-Mail: cityhall@ci.shelton.wa.us Web Site: www.ci.shelton.wa.us