Loading...
HomeMy WebLinkAboutStormwater Report - COM Inspections - 2/15/2017 STORMWWATER CONSTRUCTION SITE INSPECTION REPORT GEArERAL INFORMA770N Project Name: '7' • ,-,, f o. Location: Date of Inspection: .d --/S" Start/End Time: Inspector's Name: ,�Xi Inspector's Title: Inspector's Contact Information: Describe present phase of construction: Type of Inspection: 0 Regular 0 Pre-storm event -L+During storm event ❑ Post-storm event YVEATHER INFOXVAT1ON Has there been a storm event since the last inspection? .&Yes Alo If yes,provide: Storm Start Date&Time: Storm Duration (hrs): Approximate Amount of Precipitation(in): 0/1 Weather at time of this inspection? ❑ Clear ❑Cloudy Ja�Rain ❑ Sleet D Fog ❑ Snowing 0 High Winds ❑ Other: Temperature: C� S'f Have any discharges occurred since the last inspection? ❑Yes 'ANo If yes, describe: Are there any discharges at the time of inspection? ❑Yes .19No If yes, describe: CERTIFICATION STATEMENT "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is, to the best of my knowledge and belief,true,accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." S' aiure of Inspector RE C E I V E[ nrted Nance and Title Date MAR 3 0 20V 615 W. Alder Street OT"ERALL S1TE ISS LIES Be/oiv are some general site i.ssares that should be assessed during inspections. Customize this list cis needed forty conditions at your site, BMP/activity Implemented? Maintenance Corrective Action Needed Required? and Motes 1. All inactive slopes and disturbed AYes DNo ❑Yes PNo areas have been stabilized. 2. Are natural resource areas (e.g., 5 Yes DNo DYes )DNo streams,wetlands, mature trees, etc,) protected with barriers or similar `- BMPs? 3. Are all sanitary waste recepticles AYes ❑No Dyes DNo placed in secondary containment and free of leaks? 4. Are perimeter controls and sedi- BYes DNo .4Yes DNo ment barriers adequately installed , (keyed into substrate) and main- tained? 5. Are discharge points and receiv- V(es DNo ❑Yes,Mo ing waters free of any sediment deposits? 6. Are storm drain inlets properly DYes DNo DYes DNo protected? 7. Is the construction exit preventing 0-Yes DNo ❑Yes R-No sediment from being tracked into the street? 8. Is trash/litter from work areas col- DYes DNo ❑Z'es DNo lected and placed in covered dump- sters? 9. Are washout facilities (e.g.,paint, DYes DNo DYes DNo stucco,concrete)available,clearly marked, and maintained? 10. Are vehicle and equipment fuel- .DYes ❑No 0Yes.ktNo ing, cleaning, and maintenance areas free of spills, leaks, or any other �. deleterious material? 11. Are materials that are poten- DYes ❑No DYes DNo tial stormwater contaminants stored inside or under cover? 12. Are non-stormwater discharges ❑Yes []No DYes DNo (e.g., wash water,dewatering)prop- �vfj erly controlled? 13. (Other) DYes ❑No DYes DNo STORMWAT ER CONSTRUCTION SITE INSPECTION REPORT GE c,Rf1L INFORl1/A%VON Project Name: Location: _,7,c-�::>i GI,S Date of Inspection: Z - Z.Z- /'7 StartlEnd Time: ,; '�,r> ,: 1•��� Inspector's Name &,,, Inspector's Title: r-1;-SC L Inspector's Contact Information: 4-7,6 Describe present phase of construction: Type of Inspection: 1 fllegular ❑ Pre-storm event ❑ During storm event ❑ Post-storm event WEATHER INFORr11ATION Has there been a storm event since the last inspection? ❑Yes ®No If yes,provide: Storm Start Date&Time: Storm Duration (hrs): Approximate Amount of Precipitation (in): Weather at time of this inspection? ❑ Clear I$Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature:t1r 11 Have any discharges occurred since the last inspection? ❑Yes ,eNo If yes, describe: Are there any discharges at the time of inspection? [Wes ANo If yes, describe: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is, to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." nature of Inspector Printed Name and Title Date RECEIVED MAR 3 0 2017 615 W. Alder Street i 1 EL7—__ Or��ttart,Strcls:st� s Below are some general site issues that should be assessed(hil-ing inspections. Customize this list cis neededfor conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed Required? and Notes I. All inactive slopes and disturbed ❑Yes ❑No ❑Yes ❑No , areas have been stabilized. 2. Are natural resource areas (e.g., ❑Yes ❑No ❑Yes ONo streams,wetlands,mature trees,etc.) protected with barriers or similar BMPs? / 3. Are all sanitary waste recepticles AYes ❑NTo OYes )JNo placed in secondary containment and free of leaks? 4. Are perimeter controls and sedi- ,, Yes ONo ClYes jAM ment barriers adequately installed (keyed into substrate) and main- tained? 5. Are discharge points and receiv- OYes ❑No Oyes ONo ing waters free of any sediment deposits? G. Are storm drain inlets properly Oyes ONo CIYes ❑No protected? 7. Is the construction exit preventing . Yes ONo ,C1'es t o sediment from being tracked into the street? 8. Is trash/litter from work areas col- OYes ❑No 01'es ONo lected and placed in covered dump- /V sters? 9. Are washout facilities(e.g.,paint, OYes ONo Oyes ❑No stucco, concrete)available,clearly MI6.., marked, and maintained? 10. Are vehicle and equipment fuel- A_qYes ONO O Yes Flo ing, cleaning, and maintenance areas tree of spills, leaks, or any other deleterious material? 11. Are materials that are poten- ❑Yes ONo ❑Yes LIM tial stormwater contaminants stored inside or under cover? 12. Are non-stormwater discharges 0 Yes ❑No ❑Yes 0No (e.g., wash water, dewatering)prop- j erly controlled? t 13. (Other) OYes ONo OYes ONo STORMWATER CONSTRUCTION SITE INSPECTION REPORT CrENERAL INFORMATION Project Name: ?~c•:c° �G , Location: Date of Inspection: ' _ z. r? Start/End Time: Inspector's Name: L ,� �y,,,✓' Inspector's Title: Inspector's Contact Information: XS:r'• 2f? %Z 7L Describe present phase of construction:3 r Type of Inspection: ❑ Regular ❑ Pre-storm event Z During storm event D Post-storm event WFATPTER INFORMATION Has there been a storm event since the last inspection? @Yes ❑No If yes,provide: Storm Start Date&Time: Storm Duration (hrs): Approximate Amount of Precipitation (in): -Z • r'7 e) ✓t ivy C")7 Weather at time of this inspection? ❑ Clear ❑Cloudy Ill Rain ❑ Sleet 0 Fog ❑ Snowing 0 High Winds ❑ Other: Temperature: Have any discharges occurred since the last inspection? OYes &No If yes, describe: Are there any discharges at the time of inspection? 10Yes '141NIo If yes, describe: --- ..._......- -... —" - — ......_..... CERTIFICATION SW EVENT "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." .P9�,','a/1,,REGE1VED Printed Name and Title Date MAR 3 0 2017 615 W. Alder Street i 0 FF1ULL ST1TE ISSUES Below are some genera(site issues that should be assessed during inspections. Customize this list as needed for conditions at j�ow-site. BMP/activity Implemented? Maintenance Corrective Action Needed Required? and Notes 1. All inactive slopes and disturbed k7Yes ONO AYes ONO areas have been stabilized. 2. Are natural resource areas(e.g., O'Yes ❑No ❑1'es Flo streams,wetlands,mature trees,etc.) protected with barriers or similar BMPs? 3. Are all sanitary waste recepticles RYes ONO ❑Yes -&No placed in secondary containment and free of leaks? 4. Are perimeter controls and sedi- AYes ONO ❑Yes ZNo meat barriers adequately installed (keyed into substrate)and main- tained? 5. Are discharge points and receiv- ❑Yes ONO ❑Yes ONO ing Nvaters free of any sediment deposits? 6. Are storm drain inlets properly ❑Yes ONO ❑Yes ONO protected? / 7. Is the construction exit preventing Ayes ❑No AYes ONO sediment from being tracked into the street? S. Is trash/litter from work areas col- ❑Yes ONO ❑Yes ONO lected and placed in covered dump- f' sters? 9. Are washout facilities (e.g.,paint, ❑Yes ❑No ❑Yes ONO stucco,concrete) available,clearly marked, and maintained? 14. Are vehicle and equipment fuel- .ayes ONO li�Yes ONO ing, cleaning, and maintenance areas r free of spills, leaks, or any other deleterious material? " 11. Are materials that are poten- ❑Yes MNo UYes ONO tial stormwater contaminants stored rzrl, (w"k,,,_;C'a C; inside or under cover? t`e 12. Are non-stormwater discharges . }Yes ONO ❑Yes P�No (e.g., wash water, dewatering)prop- erly controlled? 13. (Other) ❑Yes ONO ❑Yes ONO STORMWATER CONSTRUCT ION SITE INSPECTION REPORT � CrENE&IL INFORMiA7ION Project Name: 77 ,, {Man _-- Location: 1Zc>e,,i 1 ?C&n Date of Inspection: I. 9. 17 Start/End Time: Inspector's Name: a/', Inspector's Title: ,6- Inspector's Contact Information: , -j3L -)Z7 Describe present phase of construction: f l� qn fr o4- `type of Inspection: 0 Regular 0 Pre-storm event J3 During storm event ❑ Post-storm event WEATHER INFORMATION Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storm Start Date&Time: Storm Duration (hrs): Approximate Amount of Precipitation(in): .r lea Weather at time of this inspection? ❑ Clear ;;Cloudy ,R'Rain ❑ Sleet ❑ Fag 0 Snowing ❑ Eligh Winds ❑ Other: Temperature: Have any discharges occurred since the last inspection? ❑Yes 5No If yes,describe: Are there any discharges at the time of inspection? 7 Yes _,.4+N10 If yes,describe: CERTIFICATION,S'TA MIEN T "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for(mowing violations." slgr '�Of fTM E I V E D Primed Name and Title Date MAR 3 0 2017 , 61& VJ. Alder Street OVERALL SITE ISSUES !I Belo►v aj e some general site issues that shoulel be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed Required? and Notes 1. All inactive slopes and disturbed ,Sf�fYes ONO ❑Yes A1No areas have been stabilized. 2. Are natural resource areas(e,g., XYes ONO []Yes 6INo streams,wetlands,mature trees,etc.) protected with barriers or similar BMPs? 3. Are all sanitary waste recepticles ;Es+JYes ONO ❑Yes [�LNo placed in secondary containment and free of leaks? 4. Are perimeter controls and sedi- AYes ONO ❑Yes JANo ment barriers adequately installed (keyed into substrate) and main- tained? 5. Are discharge points and receiv- ❑Yes ONO ❑Yes ❑No ing waters free of any sediment ��� deposits? 6. Are storm drain inlets properly ❑Yes ONO ❑Yes ONO protected? /JP1 7. Is the construction exit preventing -MYes ONO ❑Yes X_No sediment from being tracked into the street? S. Is trash/litter from work areas col- Dyes ONO ❑Yes ONO lected and placed in covered dump- sters? 9. Are washout facilities(e.g.,paint, ❑Yes�No ,IB�Yes ONO stucco, concrete) available,clearly marked, and maintained? 10. Are vehicle and equipment fuel- -�3Yes ONO ❑Yes TgNo ing, cleaning, and maintenance areas free of spills, leaks, or an),other deleterious material? 11. Are materials that are poten- ❑Yes Mlo BYes ONO tial stormwater contaminants stored L12. or under cover? re non-stormwater discharges ❑Yes ❑No ❑Yes ❑wash water, dewatering)prop- /1�ntrolled? / V 13. (Other) ❑Yes ONO ❑Yes ONO i i STORM WATER ATER. CONSTRUCTION SITE E INSPECTION REPORT GENERAL INFORMATION Project Name: ✓;cic_ `,z L''> — Location: /Z-"j rO f Date of Inspection: 5"'-/�. / Start/End Time: IC),(:)b _, ut� Inspector's Name: Inspector's Title: Inspector's Contact Information: . �:-Y-�7.7Z ?z-1 6 Describe present phase of construction: Type of Inspection: 'Regular ❑ Pre-storm event 0 During storm event ❑ Post-storm event WEATHER INFOR,I14TION Has there been a storm event since the last inspection? AYes ❑No If yes,provide: Storm Start Date&Time: Storm Duration (hrs): Approximate Amount of Precipitation (in): Y-/ • l 7 Weather at time of this inspection? 0 Clear 90oudy ❑ Rain 0 Sleet ❑ Fog 0 Snowing 0 High Winds ❑ Other: Temperature: Have any discharges occurred since the last inspection? ❑Yes -&No If yes,describe: Are there any discharges at the time of inspection? ❑Yes &No j If yes, describe: CF,RTIf7CATI0Af,STATEMENT "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Si atu WOE I Printed Name and Title Date MAR 3 0 2017 n;5 W. ;jer Street - 1 i OuERALSITE.ISSUES Beloiv are some general site issues that.should be assessed during inspections. Customize this list cis needed for conditions at}your site. BMP/activity Implemented? Maintenance Corrective Action Needed Required? and Notes 1. All inactive slopes and disturbed kYes ONo OYes)RNo areas have been stabilized. 2. Are natural resource areas(e.g., LXYes ONo 0Yes,BNo streams,wetlands,mature trees,etc.) protected with barriers or similar BMPs? 3. Are all sanitary waste recepticles f7-Yes ❑No OYes,f>51No placed in secondary containment and free of leaks? 4. Are perimeter controls and sedi- ,ijj _es ❑No ❑Yes QNo ment barriers adequately installed (keyed into substrate)and main- tained? 5. Are discharge points and receiv- ❑Yes ONo ❑Yes ❑No ing waters free of any sediment deposits? 6. Are storm drain inlets properly Oyes ONo OYes ONo � protected? 7. Is the construction exit preventing &Yes ONo ,QYes ONo ee7>i-cm c.c ,?V(f to cif sediment from being tracked into the street? S. Is trash/litter from work areas col- OYes QNo ®Yes ONo lected and placed in covered dump- sters? 9. Are washout facilities(e.g.,paint, 0Yes ONo ❑Yes ONo stucco,concrete)available,clearly marked,and maintained? # 10. Are vehicle and equipment fuel- Oyes ONo Oyes ONa ing,cleaning,and maintenance areas free of spills, leaks, or any other deleterious material? I1. Are materials that are poten- ,UYes ONo OYes ,6tNo tial stormwater contaminants stored inside or under cover? 12. Are non-stormwater discharges -H Yes ❑No ❑Yei,,E]No (e.g.,wash water,dewatering)prop- erly controlled? 13. (Other) OYes ONo 0Yes ONo S TO RIVVWAF E R. CONSTRUCTION SITE INSPECTION REPORT GENERAL INFORMATION -- Project Name: �r �,� u Location: / cy, Date of Inspection: ,7-27 /7 Start/End Time: Inspector's Name: Inspector's Title: d' Inspector's Contact Information: 9 'T C Describe present phase of construction: /5' (- Type of Inspection: Regular ❑ Pre-storm event 0 During storm event ❑ Post-storm event WEATHER INFORMATION Has there been a storm event since the last inspection? ❑Yes 9No I If yes,provide: Storm Start Date&Time: Storm Duration (firs): Approximate Amount of Precipitation(in): Weather at time of this inspection? ❑ Clear WCloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds 0 Other: Temperature: Have any discharges occurred since the last inspection? ❑Yes gNo If yes,describe: Are there any discharges at the time of inspection? ❑Yes Flo If yes,describe: CERTIFICATION STATEMENT "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations." Siffli'allIOEdEIVED Printed Name and Title Date MAR 3 0 2017 6'i z) V`,l: AiJ.:, Stroet OVERALL SITE ISSUES Belosv are some general site issues thal should be assessed during inspections. Customize this list cis neededfor conditions of your site. BMP/activity Implemented'? Maintenance Corrective Action Deeded Required? and Notes 1. All inactive slopes and disturbed MYes ONo ❑Yes ANo areas have been stabilized. 2. Are natural resource areas(e.g., NYes ❑No ❑Yes I�No streams, wetlands,mature trees,etc.) protected with barriers or similar BMPs? 3. Are all sanitary waste recepticles DYes ❑No ❑Yes VJNo placed in secondary containment and free of leaks? 4. Are perimeter controls and sedi- kYes ONo ❑Yes l>'1'No ment barriers adequately installed (keyed into substrate)and main- tained? 5. Are discharge points and receiv- D Yes i_7No ❑Yes ONo ing waters free of any sediment deposits? / 6. Are storm drain inlets properly DYes ONo ❑Yes ❑No I protected? 1U� t 7. Is the construction exit preventing DYes ❑No AYes ONo sediment from being tracked into the street? S. Is trash/litter from work areas col- ❑Yes ANo O Yes ONo lected and placed in covered dump- seers? /;�cr�c t ,tits►S 9. Are washout facilities(e.g.,paint, ❑Yes QNo DYes ONo stucco,concrete)available,clearly marked,and maintained? 10. Are vehicle and equipment fuel- 4NYes ONo vYes MNo ing,cleaning,and maintenance areas free of spills, leaks,or any other deleterious material? 11. Are materials that are poten- -DYes []No 0 Yes)'To tial stormwater contaminants stored inside or under cover? 12. Are non-stormwater discharges ❑Yes ❑No ❑Yes CNo (e.g.,wash water,dewatering)prop- erly controlled? 13. (Other) DYes ONa ❑Yes ONo { er STORAAWATER CONSTRUCTION SITE INSPECTION REPORT G—rNERAL INFORM47YON Project Name: Location:JZe,t Lr 1141 /tu - Date of Inspection: Start/End Time:e- Inspector's Name,:,-, Inspector's Title: Cl 4- Inspector's Contact Information: Z5 7,TZ• < 76. Describe present phase of construction: Type of Inspection: ❑ Regular ❑ Pre-storm event ❑ During storm event QiXost-storm event WEATHER INFORMATION Has there been a storm event since the last inspection? eYes ❑No If yes,provide: Storm Start Date&Time: Storm Duration (hrs): Approximate Amount of Precipitation (in): Weather at time of this inspection? ❑ Clear ,Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature: Have any discharges occurred since the last inspection? ❑Yes RNo If yes,describe: Are there any discharges at the time of inspection? ❑Yes --9bN10 If yes,describe: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief, true, accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Sii6nafure oflnspector Anted Alame and Title Date APR 0 7 2017 615 W. Alder Sti wwt for OVERALL SITE ISSUES Beloit are some general site issues that.should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed Required? and Notes 1. All inactive slopes and disturbed Jl Yes ONO ❑Yes ,]No areas have been stabilized. 2. Are natural resource areas(e.g.., ,@Yes ONO ❑Yes Wo streams, wetlands,mature trees, etc.) protected with barriers or similar BWs? 3. Are all sanitary waste recepticles Yes ONO Dyes '151N0 placed in secondary containment and free of leaks? 4. Are perimeter controls and sedi- '&Yes ONO OYes�ZNo meet barriers adequately installed (keyed into substrate) and main- tained? 5. Are discharge points and receiv- , Yes ONO Dyes -&No ing waters free of any sediment deposits? 6. Are storm drain inlets properly Oyes ONO ❑Yes ONO J protected? 7. Is the construction exit preventing .tWes ONO ,K1,Yes ONO sediment from being tracked into the street? 8. Is trash/litter from work areas col- ❑Yes &No B&Yes ONO lected and placed in covered dump- sters? 9. Are washout facilities (e.g.,paint, ❑Yes ONO ❑Yes ONO stucco, concrete)available,clearly marked,and maintained? I / 10. Are vehicle and equipment Riel- Byes ONO OYes-MNo ing, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? 11. Are materials that are poten- Yes ❑No ❑Yes,,&No tial stormwater contaminants stored inside or under cover? 12. Are non-stormwater discharges AYes ONO ❑Yes.PINo (e.g., wash water, dewatering)prop- erly controlled? 13. (Other) ❑Yes ONO ❑Yes ONO 04 r b y �y'L 18a9 aSTAP STATE OF WASHINGTON R E C E I V E D DEPARTMENT OF ECOLOGY .111N n 5 2001 PO Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300 �4AS0'+1 GG. ►'6�1NNfNG DEPT. June 4, 2007 Ms. Tammi Clark Your address Mason County is in the Community Development Department ;, Kennedy- PO Box 279 Gvldsborough Shelton,WA 98584 watershed Dear Ms. Clark: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Shelton Regional Water and Wastewater System—Conveyance/Reclaimed Water Pipelines project (SEP2007-00062)located at 12001 North US Highway 101 in Shelton as proposed by City of Shelton. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): TOXICS CLEANUP: Chuck Cline 360 407-6267 If contamination is currently known or observed during construction or soil removal(placement), sampling of the potentially contaminated media must be conducted. If contamination of soil or groundwater is readily visible,or is revealed by sampling,Ecology must be notified. Contact the Environmental Report Tracking System Coordinator at the Southwest Regional Office at(360)407- 6300. For assistance and information about subsequent cleanup and to identify the type of testing that will be required contact Mr. Chuck Cline. If contamination is identified,this issue may be referred to your jurisdictional health department as a solid waste concern. WATER QUALITY: Roberta Woods(360)407-6269 Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW,Water Pollution Control,and WAC 173-201A,Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. Erosion control measures must be in place prior to any clearing,grading,or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand,silt,clay particles, and soil will damage aquatic habitat and are considered to be pollutants. Proper disposal of construction debris must be on land in such a manner that debris cannot enter the North Fork of Goldsborough Creek or cause water quality degradation of state waters. This project may require coverage under a Construction Stormwater National Pollution Discharge Elimination System(NPDES)permit. The site has pre-construction potential to discharge offsite to waters of the state(Goldsborough Creek or stormdrains draining to waters of the state). IF one acre or more of land surface area will be disturbed,the NPDES permit will be necessary. The permit must t8 i�«1 ti June 4,2007 Page 2 be obtained before the start of any clearing, grading or construction activities and the permit application form,called a Notice of Intent,is available on Ecology's website at: hft://www.ea.wEi.gov/progwn /wq/stormwater/construction/#Application. To avoid delays we encourage the applicant to submit a completed application form and to publish public notices more than 60 days before the planned start of the project. Ecology's comments are based upon the information provided with the SEPA checklist. As such,they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (AW: 07-4124) cc: Chuck Cline,TCP Charles Gilman,HQ/WQ Joyce Smith,HQ/WQ Roberta Woods,WQ Dennis McDonald,City of Shelton Public Works(Applicant)