Loading...
HomeMy WebLinkAboutGRD2016-00011 Utilities and Drainage Included - GRD Permit / Conditions - 12/8/2016 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427 9670,ext 352 Mason County 615 W Alder St _ Shelton, WA 98584 '' LAND MODIFICATION BUILDING PERMIT GRD2016-00011 OWNER: TRACTOR SUPPLY COMPANY RECEIVED: 9/7/2016 CONTRACTOR: LICENSE: EXP: ISSUED: 12/8/2016 ENGINEER: LICENSE: EXP: EXPIRES: SITE ADDRESS: 12001 N US HIGHWAY 101 SHELTON PARCEL NUMBER: 420024400010 LEGAL DESCRIPTION: TR 1 IN SECS 2, 11 & 12 PCL 1 OF BLA#94-77 AF# PROJECT DESCRIPTION: DIRECTIONS TO SITE: FOLLOW US HIGHWAY 101 NORTH, GRADING PERMIT TO CLEAR 4.5 ACRES FOR FUTURE 1 AND SHELTON SPRINGS RD, T THE CONSTRUCTION OF TRACTOR SUPPLY CO.THIS WILL INCLUDE INTERSECTION N THE LEFT OF OF US THE HIGHWAY HE UTILITIES AND DRAINAGE Inspection Area: Fill?: Unknown i Comp. Plan Desig.: Urban Growth Grading?: Yes IRO Desig.: Cutting?: Unknown Shoreline Desig.: Not Applicable Area Graded: 4.00 Acres SEPA?: Yes Cubic Yards: 2,358.00 FEES Type By Date Amount Receipt Grading Plan Check Fee GMM 9/7/2016 $76.47 S1 2 01 6 0001 Planning Stormwater Rev GMM 9/7/2016 $255.00 S22016000i Planning Review Fee GMM 9/7/2016 $205.00 5220160001 Grading Permit Fee T V 111312016 $346.77 S320160001 Total $883.24 i GRD2016-00011 Please refer to the following page(s)for conditions of this permit. Page 1 of 6 r , CONDITIONS FOR GRD2016-00011 i I 1) Erosion and sediment control to follow recommendations given within the submitted Geotechnical Engineering Report. All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given some other equivalent type of protection against erosion. X PAD 2) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and construction must be obtained prior to same development and construction. X PAD 3) A Commercial Access Permit must be granted by the State Dept of Transportation. X PAD 4) The property is classified as a Class II Highly Susceptoble Aquifer Recharge Area. All development of the parcel including stormwater and parking must i be consistent with the Aquifer Recharge Area Chapter of the Mason County Resource Ordinance. The Title Notification is to be recorded with the I Title/Deed of the property prior to final inspection of the structures.A copy of the recorded document is to be delivered to the Mason County Planning Department.X PAD 5) The property is zoned as General Commercial within the Shelton Urban Growth Area. The Parking (17.08)and Landscaping (17.07.800) must be consistent with this zoning. The height cannot exceed 45'above grade. X PAD 6) The property is located within a Zone 6, Traffic Pattern Zone, of the Airport Overlay Zone Ordinance_All development must meet this ordinance. X PAD 7) Any new signs must meet the sign ordinance requirements and may require a separate building permit. The existing billboard can remain. 8) Utility Application(s)are required to be applied fo through the City of Shelton Public Works and Engineering Department for the proposed use of ecessitate the provision of Engineered drawings,drawn and signed by a licensed Municipal Water, Sewer and Reclaimed Water.The application(s) n i Civil Engineer licensed to practice in the State of Washington, for the review and approval of the City Engineer.X PAD Stamped Approved Plan Pages must be submitted to Mason County before work is commenced. X PAD Urban Growth Area require that the applicant fill out and submit User Agreements for all utilities 9) The requested Utility Connections within the Shelton (Water, Sewer, and Reclaimed Water).X PAD 10) The City of Shelton Community and Economic Development Department recommends that all exterior lighting related to the proposal be fully cutoff, downcast and shielded ("Dark Skies"Compliant)to prevent glare for passing motorists and to be more user friendly for aviation users at Sanderson Field. Glare from industrial and commercial sites can hinder efforts of pilots who are on approach to airports especially in inclement weather. X PAD 11) All grading and stormwater is to be completed consistent with the reommendations made within the Geotechnical Engineering Reort that was prepared by The Riley Group, dated 8/10/2016. X PAD GRD2016-00011 Please refer to the following page(s)for conditions of this permit. Page 2 of 6 i f , 12) The Stormwater Detention Ponds and Infiltration should be constructed as recommended by the Engineer within the Geotechnical Engineering Report nal Stormwater Plan and Drainage Plan to be submitted with the Building permit must meet the prepared by The Riley Group, dated 8110/2016. The fi Washington State Dept of Ecology Standards, X PAD 13) Access Roads to the site must not be degraded as a result of work. X PAD 14) A Road Approach Permit or Approval must be granted by the Washington StateDepartment of Transportation. For more information a state Transportation Planning Engineer, at(360)357-2620, ext. 630. X etuity to ensure that drainage will not overflow. X PAD 15} All culverts shall be maintained in perp 16) Approved per site plan and topographic cross-section. X PAD D SIMILIAR WORK WILL BE REGULATED Y THE 17) ALL CLEARING,CUTTING, GRADING, EXCTING,TERRACING, FILLING AN COUNTY GRADING PERMIT STAN ARDS ADO TED BY RESO UTION 141-96 and MASON REQUIREMENTS PURSUANT TO THE MASON COUNTY CODE,TITLE 14, CHAPTER 14.44. X PAD 18) The owner/applicant shall provide to Mason County inspection reports prepared by the engineer record, complying with the requirements as noted in Chapter 14.44, section 14.44.220 through 14.44.230. X PAD 19) Cut and fill slopes shall be setback from site boundaries in accordance with Section 14.44.190. X PAD 20) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X PAD 21) Compliance with an approved Storm Water Plan shall be subject to an on site inspection, or inspections including Final Inspection, by the engineer of record or an authorized representative. Said inspection(s)shall be performed in accordance with the approved plan,and prior to any modification that would make a determination of compliance impossible, gineering requirements have been completed in accordance with the approved storm water plan. Inspection reports shall be submitted to verify all en mmunity Development prior to each corresponding inspection and final permit Reports shall be submitted to the Mason County Department of Co approval. Copies of all special inspection reports shall be made available at time of inspection. X PAD 22) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. X PAD GRD2016-00011 Please refer to the following page(s)for conditions of this permit. Page 3 of 6 r ! If an inspection is called for and plans are not available on site, then approval will 23) All approved plans are required to be on site for inspection purposes. not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X PAD 24) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X PAD 25) Unless otherwise indicated on the approved grading plan, drainage facilities and terracing shall conform to the provisions of this section for cut or fill slopes steeper than three horizontal to one vertical. Terrace: Terraces at least six feet in width shall be established at not more than thirty-foot vertical intervals on all cut or fill slopes to control surface drainage and debris; except when only one terrace is required, it shall be at midheight. For cut or fill slopes greater than sixty feet and up to one hundred ately midheight shall be twelve feet in width. Terrace widths and spacing for cut and fill slopes twenty feet in vertical height, one terrace at approxim greater than one hundred twenty feet in height shall be designed by the civil engineer and approved by the official. Suitable access shall be provided to permit proper cleaning and maintenance. Swales or ditches on terraces shall have a(minimum) gradient of five percent and must be paved with reinforced concrete not less than three inches in depth at the deepest point of one foot and a minimum surface width of thickness or with an approved equal surface material.They shall have a minimum five feet. A single run of swale or ditch shall not collect runoff from a tributary area exceeding thirteen thousand five hundred square feet(projected)without may be required to determine pipe or swale size, as determined by the official. discharging into a down drain.An analysis by a licensed engineer vided with subsurface drainage as necessary for stability. Subsurface Drainage: Cut and fill slopes shall be pro In compliance with the Mason County practices regarding stormwater management, all drainage facilities shall be designed to carry waters to the nearest practicable drainage way approved by the official or other appropriate jurisdiction as a safe place to deposit such waters. Erosion of ground in the area of discharge shall be prevented by installation of non-erosive downdrains or other devices. i X PAD 26) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X PAD 27) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X PAD 28) All property lines shall be clearly identified at the time of inspection. X PAD GRD2016-00011 Please refer to the following page(s)for conditions of this permit. Page 4 of 6 ht of cut with a of and a rer o a site ary line fth o j 29) The top of cut slopes shall not be made Head t the increasedao any requriredinterceptor I dra n'saThetop of the cut slope shall befin shedtas a rounded maximum of ten feet. The setback may nee or bald head slope. X PAD ce d to ive 30) Preparation of Ground. Fill slopes shall not be constructed on amat slopes als; by scarifying to provide a bond wath the newefpl eandewhere seopeslabe removing vegetation, noncomplying fill, topsoil and other unsuitable et, by benching into sound bedrock or other competent material as determined by the soils steeper than 5:1 and the height is greater than five fe area beyond the toe of engineer. The bench under the toe of a fill on a slope steeper than 5:1 d oversh all cut,be at least wide.e bench under he t e t of fill hall be at least ten feet wide, but the cut sheet overflow or provided with a sub-drain.When fill is to be place shall be made before placing the fill and accepted by the soils engineer or engineering geologist, or both, as a suitable foundation for fill. n fills. No rock or similar irreducible material with a maximum dimension greater than twelve inches Fill Material. Organic material shall not be permitted i shall be buried or placed in fills. Compaction. All fills shall be compacted minimum of ninety percent of maximum density at optimum moisture content determined in accordance with ASTM D 1557, teeper than is safe for the intended use. Fill slopes shall be no steeper than two horizontal to one vertical. The slope of fill surfaces shall be no s X PAD 31) Hydrants to be evaluated by Mason County Fire Marshal. X PAD tion or k is suspended for a period of 180 days at any time s not comme This permit becomes null and void if work or construction cf work is anzeo progress i spection within thed within )80 day period.80 days,or if Final inspect inspection be approved before building an be occupied. after work is commenced. Evide of continuo P g l DATE: 1/6/2017 OWNER OR AGENT: Pedro DeGuzman, PE Agent (Civil Engineer) Terraforma Design Group, Inc. i i GRD2016-00011 Please refer to the following page(s)for conditions of this permit. Page 5 of 6 o CONCRETE MECHANICAL MANUFACTURED HOME Date D rnfootings I Setbacks Gas Piping !3y Ribbons n o Interior Date By Interior-Date By �7��te By O o Extersor Date By Exterior-Date liy Set-up INSULATION Cl) Point Load 1 isolated footings Date By C BG I SLAB INSULATION U Date By Data By FIRE DEPARTMENT r Foundation Wails Floors Date By Date By Data By DECKS n O FRAMING Walls Date By Date By Data By PROPANE TANKS y PLUMBING vault Date By z Date By - OTHER Groundwork Attic Date By Cate By Type, Date 13 y o.w.v DRYWALL Type. m Int Brace Wall Date, By Dane By Date By ;0Water Line Fire separation FINAL INSPECTION o Date By [late By Date ByjTZ o 5 Pass or Request Inspect. CD o Type of Ins.p. Fail Date Date Done By Comments o � v c� 0 0 o a o' O S CD (D 3 E V DO 0 ti