HomeMy WebLinkAboutBLD7810 Mobile Home - BLD Permit / Conditions - 11/7/1977 Birgen, Lydia M. #7810
11-7-77
Tract 1, Sections 2-11-12, 20-4
Mobile Home
1
BUILDING PERMIT APPLICATION
MASON COUNTY
P.O. Box 186 Shelton, Washington 98584 J
DATE ISSUED '/` 7
PERMIT NO.
NAME MAIL ADDRESS CITY 8 S ATE ' e ZIP PHONE
OWNER /% P O O SGb �'�.AG
DIRECTIONS
TO JOB SITE
LEGAL (❑SEE ATTACHED SHEET)
DESCR.
CONTRACTORIV,
NAME MAIL ADDRESS CITY&STATE LICEN E NO. PHONE
/ o Ps c O 2'Zi4f Ave. a / o
USE OF
BUILDING C
Class of work: NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE
Describe work: 1
7 — /
Valuation of work: $ PLAN CHECK FEE PERMIT FEE_
SPECIAL CONDITIONS:
APPLICATION ACCEPTED BY PLANS CHECK BY APPROVED FOR ISSUANCE Type of Occupancy Division
BY Const. Group
Size of Bldg. No. of Max.
(Total) Sq. Ft. Stories Occ. Load
CONTRACTOR AFFIDAVIT
PERMANENT SEASONAL E.D.NUMBER
I certify that I am a currently registered contractor in RESIDENCE
the State of Washington and I am aware of the MOBILE HOME
ordinance requirements regulating the work for which
the permit is issued and all work done will be in Special Approvals Required Received Not Required
conformance therewith. ZONING
HEALTH DEPT.
Firm PUBLIC WORKS
By ROAD DEPT.
Lic. No. Date
OWNERS AFFIDAVIT
I certify that I am exempt from the requirements of the N O T I C E
contract or registration law RCW 18.27, and am aware
of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIREDFOR ELECTRICAL, PLUMBING, HEATING,
VENTILATING OR AIR CONDITIONING.
which this permit is issued and that all work done will
be in conformance there THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED
IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS
SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER
AW
Owner Date. WORK IS COMMENCED.
7 7 --
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH