HomeMy WebLinkAboutMIS94-0315 Foundation Only - MIS Permit / Conditions - 5/24/1994 MASON COUNTY
Mason County Bldg, 111 426 W, Cedar
RO. Box 186 Shelton, Washington 98584
W '11,'0 OAYION—AIRPORI 141)
"IMIN 11 III`; 1 A 3 3S 0
stliiN I I I ul'i 13 5—3 3 S 0
i of setv 13111# ts 18213v7
f OUNDA I I ON ONI Y
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwcrk Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
li
i
II
I
MASON COUNTY
Mason County Bldg. III 426 W. Cedar j
RO, Box 186 Shelton, Washington 98584
I :
AW
I
i�
CONCRETE. MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
F)aS A 5 ►" %h R Wf.p 00 574C&L 6 a s i TC ol:z
�'� �Y C9QR� �R55 CoCU►-►.i N 5 u���pK T5 C./�/� � /`�Q /? L,/N cs Soc��1t �
�Tiv y, Cy,�sT S/max .�?L i•vC / 7'�/vt to �/�v�s
SLflB STET� � �ts.Y GxG <Q�pF_v yyd T/E,D, .Ciy�s f� T�l�.e 5
��"Tcv{E�/ .givo L/-iES 3
,9 T _Z 4 I.✓45 C'oLC�.�.vs Loo .vs s'TEEG
2-1tiE3
SL-4 4 �i�0 ,�iES.� L/rVE ,E 6E r1V,6WA1 / �N2 L i,41-49 5
,�.�•s o y ,�i•��s
lv '�� '`� ./ SlTG SivSpEGTiov ZDu re,Av9 j2p� of SI-40 AasO AC;00r.1-P
h SpEG.SzL TNS�ECToe t5 0-d
(0-20-9y 1J�13 I?flS5 �1 E Ai•v�y
T &D41t F � aTEEL
� 'iS-9¢' '� �as5 RrTiJru/A ) 40arl Faofi�rS Fig STEEL L-vc.
A-T G,l-I'vt. CoLurM as T/,�uc G oc/ f7-> ,LIAm�
sC�9B .e$,a ��s•v .sr��c i3ET�EE� S ,�.vD �iAlEs .
II
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
�I �
C IONCRETE� MECHANICAL MOBILE HOME
Footings-SetCack date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by
PLUMBING date by OTHER
Groundwcrk Attic
d date by
ate by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
/ i- 4 J 94 —L-)�31 j Permit No.
MASON COUNTY
BUILDING PERMIT APPLICATION ,Q6` /Ov
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628 qV D
PLEASE PRINT
#1 Owner R '10'a N T;u s Phone
Site Address ,� 20 ,�.vrer�v /kP6R7- RA Fire District#
141
City 5HL;Z-2- it! St _Zip
Directions to Job Site YoA TN` 01 /046 To /�4.2 v /6 Z
I-1w y /0 Z .4 P 2 R o x /. / --► Y,c s
Owner Mailing Address /(2 O 2 h/f<,f Sr J1/lc,�
City 4 u,c3 c� M St )'V�—Zip !FWOO
Lien/Title Holder Alo^//�
Address
Clty St Zip
#2 Contractor Name /00 F C o,V s r iQ u c rl a Al Contractor Reg#P'o-4C-O l-2 4 2 QZ
Address R O o), 829 Expiration Date S / / /_TY—
City - u t3 is RN St h— Zip O 7/ Phone# 20G/ 833 -Z 1�06
#3 If septic is located on project site, include records.
Connect to Septic? Public Water Supply Well Co-A,u A, ry
Connect to Sewer System? Name of System
(If residential, proof of potable water is required) a�,t ♦.75 �020
f/ #L o0 L S o 0 o z,o '�'
:51ftl 2.00 L7 5` 0 0/ O
#4 Parcel N0669 0 - Z? 5 - o0 0
Legal Description Ted ff c AVt /?,icokb44\ ice, Z-yo- y� 26GE7-1710-2 w, r.v
1-07-S / t Z OF S P NO,
#5 Building Square Footage: (existing/proposed)
1st FI 45 , 000 2nd FI / 3rd FI / Loft /
Basemen / Deck / #bedrooms / #bathrooms 2 /
Garage / Carport / (Circle:Attached or Detached?)
Other sq. ft. /
#6 Use of building I&/,4R-6#ou S Describe work
#7 Type of Job: New Add X Alt Repair Other
#8 MOBILE/MANUFACTURED HOME INFORMATION
Model Year Make Model
Length Width Serial No.
# Bedrooms # Bathrooms Type of Heat
Purchase Price $
#9 Indicate by circling the applicable source if any water is on or adjacent to subject property:
River Pond Creek Stream Wetland Lake Marsh Saltwater Seasonal Runoff Other /V/14
Show following on the site plan
Lot Dimensions Flood Zones
Existing Structures Fences
Structure Setbacks Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed Improvements Easements Indicate Directional by (N, S, E, W)
Name of Flanking Street in relation to plot plan
Name of Fronting Street
APPLICANT TO DRAW SITE PLAN BELOW
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
Plumbing_Fixtures ($3 each) Fpg Mechanical Fixtures ($6 each)
lJ r0
No. 2 Toilets �9'- CIRCLE FUEL TYPE: Gas, Electric,
2Bath Basins v Heatpump, Other
_Bath Tubs No. Units Fees
Showers /( Furn O 00o BTU/'.-4) 961 01D
CD 6 g0,C'00 15TO
Hot Water Htr 3 �o ,loL, = Heatpumps
_Laundry Washer C:V"(k(L' '_ Vent Systems
Sinks G Spot Vent Fans z
Floor Drains No. Boilers/Comlressors
_Laundry Basins _ HP
Dishwasher No. Air Handling Units
_Disposal _ cfm#
Urinals No. Fire Protection Systems
_Other -- Auto. Fire Alarm Sys 50.00
Fixed Fire Supp. Sys 50.00
Permit Basic Fee 15.00 _ Auto Fire Sprink Sys 25.00
TOTAL PLUMBING $3�'0� . Other
Gas Outlets
Wood, Gas, Pellet Stove
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF
WORK OR CONSTRUCTION AUTHORIZED IS NOT COM-
MENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR Permit Basic Fee 15.00
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD TOTAL MECHANICAL
OF 180 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED. PROOF OF CONTINUATION OF WORK IS BY
MEANS OF A PROGRESS INSPECTION.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED
MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I
RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU-
ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED
MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE
CONFORMANCE THEREWITH.NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT
MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING
THE BUIL ING DEPARTMENT. DEPARTMENT.
FOP_-
X OWNER .�o4,v I i_ ay X BY
DATE 3 l7-1 /y� DATE
FOR OFFICIAL USE ONLY'.Accepted by: Date E
DEPARTMENTAL REVIEW
FOR OFFICE USE ONLY
Approved Cond. Hold
Approval
Planning: b
Environmental Health: eV,,k,-e-6
Building Plan Review LA.)LC
Occupancy Group: b—2- Type of Const:=— A-/
Fire Marshal: �siAi
Other:
Special Conditions: FEES
yS, Op0 1 X 19 a 9 j4 r-r= 8b8, O Building Permit 3 7S', Sd
Plan Check (on,nne„ L_ j s-q , 48
Plumbing Fee 30 , C.)U
Mechanical Fee
L9 7-
Wood/Gas/Pellet Stove
Radon Monitor
Violation Fee
Site Inspection
Building State Fee
Other
Other
Building Valuation: 8(,08, Oro TOTAL FEE � ��j� . o
Bradley-Noble Geotechnical Comp
�D
Geotechnical Consulting
Construction Testingand Inspecting Services
P 9 1
'�/��R 9I994 --
CONCRETE INSPECTION AND TEST REPORT C�cS
CLIENT: POE Construction, Inc . DATE OF INSPECTION: 7/5/94
PROJECT: AERO Controls Addition REPORT NO: 8
CONTRACTOR: POE Construction, Inc . PROJECT NO: 94 . 05-11
INSPECTOR: S Bassett CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS INSPECTED: ---- REBAR INSPECTED: -----
REMARKS. -------
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: center of north slab
LOCATION SAMPLED: same as above
SLUMP: 4 " AIR: ---- % CUBIC YDS. PLACED: 11
CEMENT: 5 .5 SK. TYPE: ----- MAX. SIZE AGGR: -----
ADMIXTURES: ---------- AMOUNT: ---------
CONC TEMP: 66 . 90 AIR TEMP: 55 .20 WEATHER: clear
NO. CYLINDERS CAST: 3 TIME SAMPLED: 0824 TRUCK NO: 107
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
31 6372 7/12/94 7 3780
32 6373 8/2/94 28
33 6373 8/2/94 28
2401 Bristol Court S.W. • P.O. Box 10267 -Olympia, WA 98502 - Phone (206) 357-7883 • FAX (206) 754-4240
Bradley-Noble Geotechnical Comp
p
Geotechnical Consulting {,
Construction Testing and Inspecting Services J
I'�iI/ 191994
EAq�S
CONCRETE INSPECTION AND TEST REPORT Fqy
S
CLIENT: POE Construction DATE OF INSPECTION: 6/16/94
PROJECT: AERO Controls REPORT NO: 7
CONTRACTOR: POE PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles S & G
FORMS INSPECTED: ----- REBAR INSPECTED: -----
REMARKS: -----
PLACEMENT METHOD: pump CONSOLIDATION METHOD: vibratory scree
LOCATION OF PLACEMENT: slab st northeast corner and south side; slab and
footing for loading dock
LOCATION SAMPLED: Set l: east end of south side; Set 2 : west end of south
side
SLUMP: 4 " AIR: ---- % CUBIC YDS . PLACED: 229
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES: ------ AMOUNT: -----
CONC TEMP: 65 . 90 AIR TEMP: 60 . 70 WEATHER: clear
68 . 6 62 . 8
NO. CYLINDERS CAST: 3 TIME SAMPLED: 0905 TRUCK NO: 012
J 11.JU 016
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
25 6301 6/23/94 7 3180
26 6302 7/14/94 28 4420
27 6303 7/14/94 28 4190
28 6304 6/23/94 7 3330
29 6305 7/14/94 28 4010
30 6306 7/14/94 28 4460
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
f
Bradley-Noble Geotechnical Compan
Geotechnical Consulting yluj C E D V E f,
Construction Testing9
and Inspecting Ser
vices
N F .
JU � 919.,1,
CONCRETE INSPECTION AND TEST REPORT 7ENERAL SERVICES
CLIENT: POE Construction DATE OF INSPECTION: 6/16/94
PROJECT: AERO Controls REPORT NO: 7
CONTRACTOR: POE PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles S & G
FORMS INSPECTED: ----- REBAR INSPECTED: -----
REMARKS: -----
PLACEMENT METHOD: pump CONSOLIDATION METHOD: vibratory scree
LOCATION OF PLACEMENT: slab st northeast corner and south side; slab and
footing for loading dock
LOCATION SAMPLED: Set 1: east end of south side; Set 2 : west end of south
side
SLUMP: 4 " AIR: ---- % CUBIC YDS . PLACED: 229
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES: ------ AMOUNT: -----
CONC TEMP: 65 . 90 AIR TEMP: 60 . 70 WEATHER: clear
68 . 6 62 . 8
NO. CYLINDERS CAST: 3 TIME SAMPLED: 0905 TRUCK NO: 012
J
113v 016
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
25 6301 6/23/94 7 3180
26 6302 7/14/94 28
27 6303 7/14/94 28
28 6304 6/23/94 7 3330
29 6305 7/14/94 28
30 6306 7/14/94 28
2401 Bristol Court S.W. - P.O. Box 10267 -Olympia, WA 98502 - Phone (206) 357-7883 - FAX (206) 754-4240
I
Bradley-Noble Geotechnical Company
Geotechnical Consulting
Construction Testing and Inspecting Services
CONCRETE INSPECTION AND TEST REPORT
CLIENT: POE Construction DATE OF INSPECTION: 6/15/94
PROJECT: AERO Controls REPORT NO: 6
CONTRACTOR: POE PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles S & G
FORMS INSPECTED: ----- REBAR INSPECTED: -----
REMARKS: -----
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: grade beam at southwest corner and at northwest
corner of existing building
LOCATION SAMPLED: grade beam at southwest corner
SLUMP: 4 " AIR: ---- % CUBIC YDS . PLACED: 20
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8"
ADMIXTURES: ------ AMOUNT: -----
CONC TEMP: 69 . 30 AIR TEMP: 61 . 90 WEATHER: overcast
N0. CYLINDERS CAST: 3 TIME SAMPLED: 1230 TRUCK NO: 01
2
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
22 6298 6/22/94 7 3180
23 6299 7/13/94 28
24 6300 7/13/94 28
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Br echnical Com
Bradley-Noble Geot p E1e Geotechnical Consulting
Construction Testing and Inspecting Services Al !fr)
C19 �
, 1
CONCRETE INSPECTION AND TEST REPORT
CLIENT: POE Construction DATE OF INSPECTION: 6/15/94
PROJECT: AERO Controls REPORT NO: 6
CONTRACTOR: POE PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles S & G
FORMS INSPECTED: ----- REBAR INSPECTED: -----
REMARKS: -----
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: grade beam at southwest corner and at northwest
corner of existing building
LOCATION SAMPLED: grade beam at southwest corner
SLUMP: 4 " AIR: ---- % CUBIC YDS. PLACED: 20
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES: ------ AMOUNT: -----
CONC TEMP: 69 . 30 AIR TEMP: 61 . 90 WEATHER: overcast
NO. CYLINDERS CAST: 3 TIME SAMPLED: 1230 TRUCK NO: 012
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
22 6298 6/22/94 7 3180
23 6299 7/13/94 28 5010
24 6300 7/13/94 28 4890
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Bradley-Noble Geotechnical Com
Geotechnical Consulting CFO
✓(f
Construction Testing and Inspecting Services � 1
RqL nr
CONCRETE INSPECTION AND TEST REPORT SFR�ICIc
t�
CLIENT: POE Constsruction DATE OF INSPECTION: 6/10/94
PROJECT: AERO Controls Addition REPORT NO: 5
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS INSPECTED: yes REBAR INSPECTED: yes
REMARKS: Mesh was pulled during placement.
PLACEMENT METHOD: pump CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: slab, south center section and north side section;
south side wall for loading dock
LOCATION SAMPLED: Set 1: center of south center section; Set 2 : center of
north side section
SLUMP: 4 "-4 . 5 " AIR: ---- % CUBIC YDS . PLACED: 329
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES: none listed AMOUNT: ----------
CONC TEMP: 69 . 70 AIR TEMP: 64 . 30 WEATHER: clear, sunshine
74 . 7 76 . 2
NO. CYLINDERS CAST: 3 TIME SAMPLED: 0930 TRUCK NO: 015
3
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
16 6285 6/17/94 7 3310
17 6286 7/8/94 28 5180
18 6287 7/8/94 28 5400
19 6288 6/17/94 7 3440
20 6289 7/8/94 28 5090
21 6290 7/8/94 28 5510
2401 Bristol Court S.W. • P.O. Box 10267. Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Bradley Noble Geotechnical Cornlpi�
Geotechnical Consulting JU►v F
Construction Testing and Inspecting Services `
DOa?'-0 '-4ENERALSERVICER
1-5 CONCRETE INSPECTION AND TEST REPORT
�hn Tt
CLIENT: POE Constsruction DATE OF INSPECTION: 6/10/94
PROJECT: AERO Controls Addition REPORT NO: 5
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS !NSPECTED; yes REBAR INSPECTED: yes
REMARKS : Mesh was pulled during placement.
PLACEMENT METHOD: pump CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: slab, south center section and north side section;
south side wall for loading dock
LOCATION SAMPLED: Set 1: center of south center section; Set 2 : center of
north side section
SLUMP: 4"-4 . 5 " AIR: ---- % CUBIC YDS . PLACED: 329
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES : none listed AMOUNT: ----------
CONC TEMP: 69 . 70 AIR TEMP: 64 . 30 WEATHER: clear, sunshine
74 . 7 76 . 2
NO. CYLINDERS CAST: 3 TIME SAMPLED: 0930 TRUCK NO: 015
3 1240 107
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
16 6285 6/17/94 7 3310
17 6286 7/8/94 28
18 6287 7/8/94 28
19 6288 6/17/94 7 3440
20 6289 7/8/94 28
21 6290 7/8/94 28
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Bradley-Noble Geotechnical Co
Geotechnical Consulting
Construction Testing and Inspecting Service
CONCRETE INSPECTION AND TEST REPORT GENERAL SERVICF-9
CLIENT: POE Construction DATE OF INSPECTION: 6/9/94
PROJECT: Aero Controls Addition REPORT NO: 4
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS INSPECTED: yes REBAR INSPECTED: yes
REMARKS : Resteel was per plans .
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: north side of building footing from about center to
LOCATION SAMPLED: footing on north side of guilding
SLUMP: 4 . 5 " AIR: ---- % CUBIC YDS . PLACED: 20
CEMENT: 5 . 5 SK. TYPE : ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES: none listed AMOUNT: -----
CONC TEMP: 73 . 70 AIR TEMP: 67 . 00 WEATHER: clear
NO. CYLINDERS CAST: 3 TIME SAMPLED: 1100 TRUCK NO: 012
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
13 6282 6/16/94 7 3400
14 6283 7/7/94 28 4290
15 6284 7/7/94 28 4400
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Bradley-Noble Geotechnical Company
Geotechnical Consulting E C
Construction Testing and Inspecting Services it
J U o
LAI-
CONCRETE INSPECTION AND TEST REPORT
aENERAL SEEVICES
CLIENT: POE Construction DATE OF INSPECTION: 6/9/94
PROJECT: Aero Controls Addition REPORT NO: 4
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: S . Bassett CONCRETE SUPPLIER: Miles Sand &
Gravel
FORKS !NSPEC'TED: yes DEBAR INSPECTED: lTes
REMARKS: Resteel was per plans .
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: north side of building footing from about center to
LOCATION SAMPLED: footing on north side of guilding
SLUMP: 4 . 5 " AIR: ---- % CUBIC YDS . PLACED: 20
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8"
ADMIXTURES: none listed AMOUNT: -----
CONC TEMP: 73 . 70 AIR TEMP: 67 . 00 WEATHER: clear
NO. CYLINDERS CAST: 3 TIME SAMPLED: 1100 TRUCK NO: 012
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
13 6282 6/16/94 7 3400
14 6283 7/7/94 28
15 6284 7/7/94 28
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 - FAX (206) 754-4240
Bradley-Noble Geotechnical Com
Geotechnical Consulting My
;� � �
Construction Testing and Inspecting Services
J01,1
CONCRETE INSPECTION AND TEST REPORT 'ENERAL SERVICES
CLIENT: POE Construction DATE OF INSPECTION: 6/8/94
PROJECT: AERO Controls Addition REPORT NO: 3
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: D. Strong CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS 1"NSPECTED: des PEBAR INSPECTED: yes
REMARKS: Mesh was pulled during plaacement; edges were vibrated.
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibrascree
LOCATION OF PLACEMENT: slabs on grade: 2 to 3 lines & 4 to 5 lines
LOCATION SAMPLED: Set 1: 2 to 3, 0 to P; Set 2 : 4 to 5, N to O
SLUMP: 4 "-4 . 5 " AIR: ---- % CUBIC YDS . PLACED: 350
CEMENT: 5 . 5 SK. TYPE : ---- MAX. SIZE AGGR: 7/8"
ADMIXTURES: none listed AMOUNT: ----------
CONC TEMP: 70 . 10 AIR TEMP: 65 . 40 WEATHER: high thin clouds, light
71 . 9 74 . 2 breeze, sunshine
NO. CYLINDERS CAST: 3, 3 TIME SAMPLED: 1100 TRUCK NO: 48 (rental)
1320 019
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
7 6276 6/15/94 7 3780
8 6277 7/6/94 28
9 6278 7/6/94 28
10 6279 6/15/94 7 3610
11 6280 7/6/94 28
12 6281 7/6/94 28
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Bradley-Noble Geotechnical Company
Geotechnical Consulting
Construction Testing and Inspecting Service`
CONCRETE INSPECTION AND TEST REPORT P
CLIENT: POE Construction DATE OF INSPECTION: 6/8/94
PROJECT: AERO Controls Addition REPORT NO: 3
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: D. Strong CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS INSPECTED: yes REBAR INSPECTED: yes
REMARKS: Mesh was pulled during plaacement; edges were vibrated.
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibrascree
LOCATION OF PLACEMENT: slabs on grade: 2 to 3 lines & 4 to 5 lines
LOCATION SAMPLED: Set 1: 2 to 3, 0 to P; Set 2 : 4 to 5, N to 0
SLUMP: 4 "-4 . 5 " AIR: ---- % CUBIC YDS . PLACED: 350
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES: none listed AMOUNT: ----------
CONC TEMP: 70 . 1° AIR TEMP: 65 . 4 ° WEATHER: high thin clouds, light
71 . 9 74 . 2 breeze, sunshine
NO. CYLINDERS CAST: 3, 3 TIME SAMPLED: 1100 TRUCK NO: 48 (rental)
i 2 2 0i9
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
7 6276 6/15/94 7 3780
8 6277 7/6/94 28 4660
9 6278 7/6/94 28 4400
10 6279 6/15/94 7 3610
11 6280 7/6/94 28 4310
12 6281 7/6/94 28 4530
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 - FAX (206) 754-4240
Bradley-Noble Geotechnical CoMAW-mVELWI
Geotechnical Consulting U 'tq, E,
Construction Testing and Inspecting Services
,ENERALSERVICES
CONCRETE INSPECTION AND TEST REPORT
CLIENT: POE Construction DATE OF INSPECTION: 6/7/94
PROJECT: Aero Controls Addition REPORT NO: 2
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: M. Robinson CONCRETE SUPPLIER: Miles Sand &
Gravel
FOPUMS !NSPECTEC: y--s REBAR INSPECTED: yes
REMARKS: Resteel was per plans .
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: grade beam, north side, A, 1 to 6 and part on B line;
three footings adjacent to existing building
LOCATION SAMPLED: west third of grade beam
SLUMP: 4 . 0 " AIR: ---- % CUBIC YDS . PLACED: 20+
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8"
ADMIXTURES: none listed AMOUNT: ------
CONC TEMP: 710 AIR TEMP: 580 WEATHER: partly cloudy
NO. CYLINDERS CAST: 3 TIME SAMPLED: 0807 TRUCK ion: ?_49
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
4 6270 6/14/94 7 3580
5 6271 7/5/94 28
6 6272 7/5/94 28
2401 Bristol Court S.W. • P.O. Box 10267 - Olympia, WA 98502 - Phone (206) 357-7883 - FAX (206) 754-4240
Bradley-Noble Geotechnical Company
p Y
Geotechnical ConsultingIr
Construction Testing and Inspecting Services
CONCRETE INSPECTION AND TEST REPORT
01
IEW AL
CLIENT: POE Construction DATE OF INSPECTION: 6/7194
PROJECT: Aero Controls Addition REPORT NO: 2
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: M. Robinson CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS INSPECTED: yes REBAR INSPECTED: yes
REMARKS: Resteel was per plans .
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: grade beam, north side, A, 1 to 6 and part on B line;
three footings adjacent to existing building
LOCATION SAMPLED: west third of grade beam
SLUMP: 4 . 0 " AIR: ---- % CUBIC YDS . PLACED: 20+
CEMENT: 5 . 5 SK. TYPE : ---- MAX. SIZE AGGR: 7/8"
ADMIXTURES: none listed AMOUNT: ------
CONC TEMP: 710 AIR TEMP: 580 WEATHER: partly cloudy
NO. CYLINDERS CAST: 3 TIME SAMPLED: 0807 TRUCK NO: 149
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
4 6270 6/14/94 7 3580
5 6271 7/5/94 28 4210
6 6272 7/5/94 28 4390
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Bradley-Noble Geotechnical Company_,
Geotechnical Consulting
Construction Testing and Inspecting Services -
s.
CONCRETE INSPECTION AND TEST REPORT
CLIENT: POE Construction DATE OF INSPECTION: 613/94
PROJECT: AERO Controls Addition REPORT NO: 1
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: M. Robinson CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS INSPECTED: ves REBAR INSPECTED: yes
REMARKS: per plans
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION Of' PLACEMENT: loading dock footings , 6 line, G to N and grade beam
along S line, 1 to 6
LOCATION SAMPLED: dock footings, south side
SLUMP: 4 " AIR: ---- % CUBIC YDS . PLACED: 40+
CEMENT: 5 . 5 SK. TYPE : ---- MAX. SIZE AGGR: 7/8"
ADMIXTURES: none listed AMOUNT: -----
CONC TEMP: 750 AIR TEMP: 760 WEATHER: clear, sunshine
NO. CYLINDERS CAST: 3 TIME SAMPLED: 1215 TRUCK NO: 107
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
1 6264 6/10/94 7 3150
2 6265 7/1/94 28 4490
3 6266 7/1/94 28 4310
2401 Bristol Court S.W. • P.O. Box 10267 • Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
Bradley-Noble Geotechnical Company
Geotechnical Consulting
Construction Testing and Inspecting Services
CONCRETE INSPECTION AND TEST REPORT
CLIENT: POE Construction DATE OF INSPECTION: 6/3/94
PROJECT: AERO Controls Addition REPORT NO: 1
CONTRACTOR: POE Construction PROJECT NO: 94 . 05-11
INSPECTOR: M. Robinson CONCRETE SUPPLIER: Miles Sand &
Gravel
FORMS INSPECTED: yes REBAR INSPECTED: yes
REMARKS: per plans
PLACEMENT METHOD: chute CONSOLIDATION METHOD: vibration
LOCATION OF PLACEMENT: loading dock footings , 6 line, G to N and grade beam
along S line, 1 to 6
LOCATION SAMPLED: dock footings, south side
SLUMP: 4 " AIR: ---- % CUBIC YDS . PLACED: 40+
CEMENT: 5 . 5 SK. TYPE: ---- MAX. SIZE AGGR: 7/8 "
ADMIXTURES: none listed AMOUNT: -----
CONC TEMP: 750 AIR TEMP: 760 WEATHER: clear, sunshine
NO. CYLINDERS CAST: 3 TIME SAMPLED: 1215 TRUCK NO: 107
DESIGN STRENGTH: 3000
CYL NO. LAB NO. DATE TESTED AGE PSI
1 6264 6/10/94 7 3150
2 6265 7/1/94 28
3 6266 7/1/94 28
2401 Bristol Court S.W. • P.O. Box 10267. Olympia, WA 98502 • Phone (206) 357-7883 • FAX (206) 754-4240
HOW I
�Ur� 1� ����� RADLEY NOBLE GEOTECHNICAL CO.
REPORT OF COMPACTION OF EARTHWORK
-iENERALSERVICES IN-PLACE DENSITY TESTS
CLIENT: Poe Construction DATE: 5/27/94 PAGE: 1
PROJECT: Aero Control Addition PROJECT NO: 94.05-1 1 OF 1
CONTRACTOR:. TECHNICIAN: S. Bassett REPORT NO: 1
IN-PLACE DENSITY TEST METHOD: ASTM Dl 556 CONTROLLING TEST METHOD ASTM D698
ASTM C2922 ASTM D1557
TEST DATE ELEV LOCATION LAB FIELD FIELD PERCENT LAB COM- COM-
NO. CURVE DENSITY DENSITY MOISTURE MAX PACTION PACTION
NO. Ibs/eu ft Ibs/cu ft DEN- % %
WET DRY SITY AS TESTED RE-
M RED
1 5/23 sub- East end, center of building pad 1 134.3 130.4 3.0 134 97.3 95
arade
2 5/23 sub- 88 paces east of west end, north side of 1 132.3 127.5 3.8 " 95.1 95
grade pad
3 5/23 sug- 55 paces east of west end, south side of 1 133.2 128.6 3.6 " 96.0 95
rade pad
4 5/23 sub- West end, north side pf pad 1 130.8 127.7 2.4 95.3 95
grade
NOTES:
BRADLEY-NOBLE GEOTECHNICAL CO.
REPORT OF COMPACTION OF EARTHWORK
IN-PLACE DENSITY TESTS
CLIENT: Poe Construction DATE: 6/4/94 PAGE: 1
PROJECT: Aero Controls PROJECT NO: 94.05-1 1 OF 1
CONTRACTOR:.Poe Construction TECHNICIAN: S. Bassett REPORT NO: 2
IN-PLACE DENSITY TEST METHOD: ASTM D1556 CONTROLLING TEST METHOD ASTM D698
ASTM C2922 ASTM D1557
TEST DATE ELEV LOCATION LAB FIELD FIELD PERCENT LAB COM- COM-
NO, CURVE DENSITY DENSITY MOISTURE MAX PACTION PACTION
NO. Ibs/cu ft lbs/cu ft DEN- % %
WET DRY SITY AS TESTED RE-
QUIRED
5 5/31 East end, south side 1 138.8 133.5 3.6 134 99.6 90
6 5/31 * Center of south side 1 134.0 130.9 2.4 97.7 90
7 5/31 North side, northeast corner 1 137.3 132.1 4.2 98.6 90
8 5/31 Center of north side 1 141 .8 128.7 10.2 96.0 90
NOTES: *All elevations were at the bottom of footing trench.