Loading...
HomeMy WebLinkAboutMEP2017-00013 Bridge - MEP Permit / Conditions - 8/3/2017 " ! ° m ' STA ����«���N� COUNTY ' "°"����~�"° ~°�~~°"° " " MC DEPARTMENT ��� ������K�N�I�� DEVELOPMENT | _ --' ' - ' ' -'_'' . _' COMMUNITY _-- ' --_.~. .~..-.. . | Planning Division 615 VV Alder St, She|tmn, W4 98584 7864 (360)427-9870 MASON COUNTY ENVIRONMENTAL PERMIT August O3. 2017 JOHN & KARENNELSON 2011 DRUK4MOND DR NW GIG HARBOR WA98332 Paroe| Nunnbar(s): 122182400080 Expiration Date: 8/3/2019 12:00:OOAN Date Issued: 8/3/2017 Case Number: MEP2017-0X0013 Project Description: BRIDGE OVER CREEK(SEE BLD2017'00731) The following critical areas are present on this property� Long'TennCororooroia| F000st xxFVVHCA Ch. 17.10,060� Ch. 17.01110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.086; Ch- 17.01,090; |nhu|dingLonds Landslide Hazard Areas Ch. 17.01.062-1 Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch� 17.01�070� Ch. 17,01]02; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01]04. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.O1 K8CC) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local atatutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance Authorized Local Government Official Dote Conditions: 8/3/2017 Page of K8EP2017'00013 ti MASON COUNTY ENVIRONMENTAL PERMIT 8/3/2017 Case No.: MEP2017-00013 No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showing good cause, may extend the initial two year period by one year. No permit shall be extended unless the applicant has requested such review and extension prior to the exporation date. 2017.12.09 11 20 a5-08'00' Signature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 8/3/2017 Page 2 of 2 MEP2017-00013 ❑ MASON ENVIRONMENTAL PERMIT($630 or 38 /other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) mEP Z O 17 - ©OO(3 ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd MASON COUNTY ✓to, DEPARTMENT OF COMMUNITY DEVELOPMENN ? Mason County Resource Ordinance(Chapter 17.01 MCC) a�/S ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER \ Name: - To,40 °l' Mailing Address: zo I 1)je- /v 0t Work Phone: �,CpO- 150q Email Address: 1p-a,,�1 1,6-s ©ALsti u�-- Hom Cell Phone: L65 ,-96 5 4-5 1�7 Fax#: If an agent is acting for the property owner during the permit process, complete 92. 2. AUTHORIZED AGENT Name: 01 F- Mailing Address: Work Phone: Email Address: Home/Cell Phone: Fax# 3. PROJECT SITE Site Address: I Z,, 14(k) 5�?>J�✓ Parcel#:. ZZ!(p - - 000g-b Legal Description: okrtDo 0/-' &ovr LDT3 A ob A- ORTIok) Q,/-G?OUT Z c0 UU,4TY Directions to Site: ft / I) N I A.b� /J1 4-r 4IG7� �Zr —jf1 'C�1bPam.. ff rk O M)W051- 2II Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans, Shorelines, Septic System,Topography,Proposed Improvements,Easements,North Arrow, and Scale. Also draw a separate topography diagram. ! +C�mmunitt �cicl�pm ni`.PAC".RiFP Pic I of= Rc i cdJim, 21;10 4. State which section requires permit: ❑ Long Term Commercial Forest, Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands, Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area, Chapter 17.01.080 ❑ Seismic Hazard Areas, Chapter 17.01.102 ❑ Erosion Hazard Area, Chapter 17.01.104 Fish&Wildlife Habitat Conservation Areas, Chapter ❑ In-Holding Lands, Chapter 17.01.062 17.01.110 ❑ Wetlands, Chapter 17.01.070 5. Identify current use of the property with existing improvements: 0oN6' 6. Identify and describe the proposed project, including the type of materials to be used, construction methods, principle dimensions, and other pertinent information (attach additional sheets, if needed): 0� �5� -ucTcD� Ord OTI-WkC6-- A-6(, rf K1�-,-077::> 7. Describe why the action requiring this permit cannot be avoided. aA N0or lo-w&1�6 P DPW V 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Identify any surface water on or adjac Dperty(circle one): Saltwater Lake Stream/ nd Wetland Drainage Ditch k)/P, 10. Identify existing septic/sewer connection (cire e one): If septic is located on project site, include records. Connected to Septic Connected to Community Septic S"eR- A-T �-Vr 11. Identify existing water supply(circle one): 0/A- Public Water Supply Well 11. Type of Job (circle one): F..pp � New Add Alteration Repair Demolition Other: l�. w1ce- o+Z (1101)6ATS 11,2 Print Name Signa re Date (:'•.Community llevelopmen'':i':'01MLP et'o`= Revised June l)10