Loading...
HomeMy WebLinkAboutCOM2002-00183 Construct T Hanger - COM Permit / Conditions - 4/4/2003 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)127-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 Shelton,WA 98584 too COMMERCIAL BUILDING PERMIT COM2002-00183 OWNER: PORT OF SHELTON RECEIVED: 12/9/2002 CONTRACTOR: KAUFMAN BROTHERS LICENSE: EXP: ISSUED: 4/4/2003 SITE ADDRESS: 85 W AIRVIEW WY SHELTON EXPIRES: 10/4/2003 PARCEL NUMBER: 420020062000 LEGAL DESCRIPTION: S1/2 W OF HY EX SEE SURVEY 10/144, 8/117, 10/147 PCL 2 OF BLA#94-77 #595248 PROJECT DESCRIPTION: DIRECTIONS TO SITE: CONSTRUCT T HANGER General Information Construction &Occupancy Information Type of Use: Warehouse Insp.Area: No.of Units: Type of Constr.: II-N Type of Work: NEW Fire Dist.: No.of Bathrooms: Occ. Group: S-5 No. of Stories: 1 Occ. Load: 16 Valuation: $ 350,356.00 Building Height: 12 Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: 17,000 Year: Sedal No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body:none Shoreline Desig.: Not Applicable Side 1: Ft. SEPA?:Yes Comp.Plan Desig.: Urban Growth Area Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2002-00183 Please refer to the following pages for conditions of this permit. 1 of 5 _L Plumbing Fixtures Mechanical Fixtures FEES Typk-: Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee Ki w 19/Q/9nn9 P1 ririQ F'iR R1ana EH Plan Review rrFw 19i1ni9nn &Sir,nn 97QQ Building State Fee MRr; 19/17/9nn Oa sn 97QQ Building Permit Fee KART 19/17/9nn V9'AQQ'3ri 97QQ UFC Plan Check Fee CAC i/A/9nnSt %77Q 7Q 97QQ Planning Review Fee RA R/9R/9nnA P9Fn nn 97QQ Planning Site Inspection qai 't/9R/9nn� &9nn nn 97QQ Total $5,228.22 CASE NOTES FOR COM2002-00183 CONDITIONS FOR COM2002-00183 1) This application is subject to Buffer and Landscaping requirements as established under Mason County Ordinance 1.03.036.X 1v,h 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X Ykk 3) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. X '),i h 4) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X kti 5) The approved plot plan is required to be on-site for inspection purposes. If inspection is called for and plot plan is not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$52.30 per hour(minimum 1 hour)will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X A 5 6) This structure is approved as an unheated space as identified by by the Mason County Semi-heated Building Exemption Guidelines. X X5 COM2002-00183 2 of 5 7) 1997 UBC CHAPTER 17, SECTION 1701: IN ADDITION TO THE INSPECTION REQUIRED BY SECTION 108, THE OWNER OR THE ENGINEER OR ARCHITECT OF RECORD ACTING AS THE OWNER'S AGENT SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS WHO SHALL PROVIDE INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF WORK LISTED UNDER SECTION 1701.5. THE SPECIAL INSPECTORS DUTIES & RESPONSIBILITIES SHALL BE AS SPECIFIED IN 1701.2 AND 1701.3. X ^th� 8) Changes to approved building plans that affect compliance to the current non-residential Energy Code (NREC), ventilation and Indoor Air Quality Code VIAQ) Uniform Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 5 9) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE.x 10) All property lines shall be clearly identified at the time of foundation inspection. X ��5 11) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being X non-compliant with Mason County ordinances and building regulations. 12) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 'M 13) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x `1 j 14) A fire wall having not less than a 3hr fire resistance rating shall be installed between hanger bays 4 & 5, 12 & 13. X 1'5 The new fire hydrant south of the building, and the existing fire hydrant north of the building are required to be equipped with STORZ fittings on the steamer port. Contact Fire Dist. #11 @ (360)426-1822 for correct size. X 4 15) An Automatic Fire Alarm System, designed and installed to NFPA 72 and Mason County Standards is required. Submit a seperate set of plans and a permit application to the Fire Marshal for review. X '('4.. The Atom atic Fire Alarm System shall be monitored by a UL central recieving station approved by the Fire Marshal. FACP is,to be located in the buildings east end storage room. This room is required to be heated. X 16) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X '�5 17) Approved per submitted site plan. X COM2002-00183 3 of 5 18) y Applicant acknowledges that this development is subject to policies and regulations of Mason County Comprehensive Plan and Development .� Regulations.X 5 19) Development shall be consistent with the Habitat Management Plan submitted for this project.X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. 4J Z OWNER OR AGENT: I In.�,C _ DATE: 0 COM2002-00183 4 of 5 I - c� RETE MECHANICAL MANUFACTURED HOME 0 ootin s / Set acks - 's Date By Ribbons 6 Date Gas Piping Date B o / �3 BY IP. g Y on a s Date By Set-up co Date'/z - 3 a3 Jim INSULATION Date By B G / Slab tamrbrtin p Floors Final Date [P 30 U3 By Date By Date By FRAMING Walls FIRE DEPT Date By Date By Date By PLUMBING Attic OTHER Groundwork Date By Date By WALLBOARD NAILING D.W.V. Date By Date By FINAL INSPECTION Water Line Date By Date By Date By Y�lwlo Ali O y � O o � o v� N O � r 0 �] cn