Loading...
HomeMy WebLinkAboutCOM2002-00140 Shall Only BLD 4 - COM Permit / Conditions - 10/24/2002 ipMASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 Shelton,WA 98584 , COMMERCIAL BUILDING PERMIT COM2002-00140 OWNER: PORT OF SHELTON RECEIVED: 9/24/2002 CONTRACTOR: LICENSE: EXP: ISSUED: 10/24/2002 SITE ADDRESS: 450 W BUSINESS PARK RD SHELTON EXPIRES: 4/24/2003 PARCEL NUMBER: 420020062000 LEGAL DESCRIPTION: S1/2 W OF HY EX SEE SURVEY 10/144, 8/117, 10/147 PCL 2 OF BLA#94-77#595248 PROJECT DESCRIPTION: DIRECTIONS TO SITE: METAL BUILDING SHALL ONLY BLD 4 US 101 N TOWARD SHELTON, WA, TURN LEFT ON BUSINESS PARK RD JUST PAST SANDERSON FIELD AND THE FAIRGROUNDS General Information Construction &Occupancy Information Type of Use: Insp.Area: No.of Units: Type of Constr.: V-N Type of Work: NEW Fire Dist.: 11 No.of Bathrooms: 2 Occ. Group: S-1 Valuation: $ 121,000.00 No.of Stories: 1 Occ. Load: 25 Building Height: 21 Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: 5,000 Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: S 276.00 Ft. Shoreline: Ft. Rear: N 138.00 Ft. Slope: Ft. Water Body: Shoreline Desig.: Not Applicable Side 1: E 108.00 Ft. SEPA?:No Comp.Plan Desig.: Urban Growth Area Side 2: W 336.00 Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2002-00140 Please refer to the following pages for conditions of this permit. 1 of 5 Plumbing Fixtures Mechanical Fixtures FEES Type 4 - Qty. Type Qty. Type By Date Amount Receipt Lavatories 2 Plan Check Fee Ki w Q/9A/9nm &799'AR anwin Water Heaters 1 Planning Review Fee PRr. 1n/70M9 4'AA nn R1ndri Water Closets (Toilets) 2 Building State Fee Mr. 1ni1F»nn &d Rn 91ndri Building Permit Fee Mr. 1N1Fii9nn 41 111 l5 Al US; Plumbing Fee MRr, 1ntitvgnn ltA5 nn R1nd.5 Plumbing Base Fee MRr. 1ni11;i9nn R9n nn Rinds; UFC Plan Check Fee CAC 1n/99/9nn R'2R1 1Q a1nd5 EH Plan Review KR 1ni9�i9nn S79;nn F;1ndri Total $2,367.42 CASE NOTES FOR COM2002-00140 CONDITIONS FOR COM2002-00140 1) This application is subjeci;,to Buffer and Landscaping requirements as established under Mason County Ordinance 1.03.036.X - 14 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. x )k b 3) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallonsisis Sot allowed without the approval of the Mason County Fire Marshal. 4) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X �Yti S COM2002-00140 2 of 5 5) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum of 5'setback from all property lines, easements and 25'from all access easements and County and State Road right y of ways.X 6), Subject to provisions of Critical Aquifer Recharge Area Chapter 17.01.080 of the Mason County Resource Ordianance. X N S 7) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$52.30 per hour (minimum 1 hour)will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X .N S 8) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS.X Yk 5 9) The approved plot plan is required to be on-site for inspection purposes. If inspection is called for and plot plan is not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$52.30 per hour (minimum 1 hour)will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X X6 10) 1997 UBC CHAPTER 17, SECTION 1701: IN ADDITION TO THE INSPECTION REQUIRED BY SECTION 108, THE OWNER OR THE ENGINEER OR ARCHITECT OF RECORD ACTING AS THE OWNER'S AGENT SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS WHO SHALL PROVIDE INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF WORK LISTED UNDER SECTION 1701.5. THE SPECIAL INSPECTORS DUTIES & RESPONSIBILITIES SHALL BE AS SPECIFIED IN 1701.2 AND 1701.3. X '.5 11) Changes to approved building plans that affect compliance to the current non-residential EnergyCode (NRE C), ventilation and Indoor Air Quality Code (VIAQ) Uniform Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 12) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE.x _)�S 13) All property lines shall be clearly identified at the time of foundation inspection. 14) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X COM2002-00140 3 of 5 15) Fire Flow calculations for this building require 2800 GPM. Commercial buildings in excess of 2000 sq. ft. where the public water system is not capapleof delivering the required fire flow, will be required to install a monitored automatic fire alarm system. X A s Automatic fire alarm systems shall meet NFPA 72 and Mason County standards and are required to have a seperate review and permit. X_ X 5 Provide at least 2 (two)2A 10BC fire extinguishers mounted and located in an approved location and manner. X "big 5 16) Manually operated edge-or surface - mounted flush bolts and surface bolts are prohibited on the front pair of doors. X Yk 5 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. OWNER OR AGENT: r1 A/'C S W&1< tL,D µt DATE: t�i,Kf vv,'V C- 4", COM2002-00140 4 of 5 CONCR ; MECHANICAL MANUFACTURED HOMI Footings Setbaelcs Date By Ribbons Date By Gas Piping Date B y Foundation malls Date B y Set-up Date By INSULATION Date By B G I Slab Insulation Floors Final Date By Date By Date By FRAMING Walls FIRE DEPT Date By Date By 11i1/ Date By PLUMBING Attic OTHER Groundwork Date ���� By 4iV Date By WALLIBPA D NAILING D.W.V. Date % / Q Z By R5 Date IXIIZ/Oz- By iv FINAL NS ECTION Water Line Date Ot/30103 B yRCS Date 12 1Z UL B _ Date By �2 z �- U.�big -- P/9-sS Cid /02 -s �sT '►� - �5 it'rL ✓C l 1 ` I J� /b� ��t 1'6 cNT-, S L.J +9cA-...L -old B t o -F(PCIL N oil O O � N O � r � N o p 0