Loading...
HomeMy WebLinkAboutPAR2014-00013 - PAR Letters / Memos - 3/4/2014 RECEIVED MAR PAR 2ciLA - ow I � -A^,! DATE .3- --1- 2-61 PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site plan. Applications will be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 10 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1. Pre-Application/Dept. of Community Dev. 2. Environmental Health 426 W Cedar Street/PO Box 279 415 N 5th /PO Box 1666 Shelton,WA 98584 Shelton,WA 98584 360.427.9670 ext. 352 360.427.9670 ext. 400 Check amount: $255.00 Check amount: $150.00 BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER Applicant: - Site Plan Name: Jerry Hauth - City of Shelton Submit 6 copies Mailing Address: 525 West Cota Street Shelton, WA 98584 Include thefollowing information Daytime Telephone: (360)432-5125 Fax: ❑ Indicate Scale and North Arrow Email address: ,jhauth i shelton.wa.us ❑ Property line dimensions,easements. and right-of-ways. Representative: Name: Chris Uber Murray, Smith & Associates Inc. ❑ proposThe ed structures. f res.Ill dude square Mailing Address: 1145 Broadway., Ste 1010, Tacoma, WA 98402 footage of existing and proposed structures. Daytime Telephone: (253)627-1520 Fax: (253)627-1923 ❑ Setback distance,in feet from all Email address: chu(C_msa-ep.com property lines and structures. Parcel Number: (12 digits) 42002 - 10 - 00020 ❑ Existing and proposed road access to and from the site. Description of Project: Include: 1)Square footage of structure,2)Use of building and rooms(i.e., ❑ Parking sites office,warehouse,restaurant,storage,etc), 3)Occupancy classification per ❑ Location of on-site sewage tanks and drainfields. IBC, Section 302.1,and construction type. 4)Provide two sets of plans, if ❑ Location of drinking water supply. available. Use separate sheet if necessary Include location on the proposed site and surrounding parcels. See attached ❑ Steep bluffs,wetlands,streams,and bodies of water �1 �! DIS4%11 ❑ Location of fire hydrants and emergency vehicle access roads, including grade. ❑ Surface and storm water run-off routes. Has the project been discussed during a previous Pre-Application Conference: If yes, please indicate date. No. County staff are aware of the pr*ect through previous communication. Will the building have employees? If yes, how many? No. Unmanned water facilities. What is the water availability of the proposed project? If there is an existing well, what is the name of the system? Water will be available through the City of Shelton. What is planned for the on-site sewage system? If you are proposing a new on-site system provide detail on the required site plan. No sanitary sewer is required: no domestic waste produced. ADDITIONAL INFORMATION.• ��-�o n���CCw 5{vr.�G,�u,�. ir�,�-�,- •f a.��Z�lea�w-cu. co� -��� �� t ��YbCs�n'y� l" � U D✓¢I'COL'�.V. n.� EI (.�.5ic6 SfmHw.�.ti-�ad,��-.0� �� .., e.,t�A��,.►-,A�oz,.� �-,,., - r .� `�- ��P� " v - APPLICABLE BUILDING CODES 2012 International Building Code/2009 International Residential Code 2012 International Fire Code-ANSI A117 2012 International Mechanical Code—WAC 51-42 2012 Uniform Plumbing Code—WAC 51-56/5147 2012 International Energy Cons. Code/Washington State Energy Code—WAC 51-11C&51-11R Mason County Ordinance Title 14 Code changes are on a 3 year cycle; effective in July of that parti Yre3. Date of Conference: 3 , G1 2 d I`� Time of Conference: Location of Conference: 426 west Cedar Street,Shelton Planner: ra.c E ext. 31,ao Project Description The City of Shelton is proposing to expand its existing water supply system through the construction of a new pressure zone called the Upper Mountain View Pressure Zone (UMVPZ). The scope of the proposed UMVPZ improvements is relatively large, and it is anticipated that construction will take place through phases over several years. The current proposal is Phase I of the project. The scope of work for Phase I includes the construction of two new welded steel multi- legged elevated water tanks, approximately 5,500 linear feet of water transmission main, well yard piping improvements, a buried pressure-reducing valve (PRV) station, and retrofitting an existing water supply well to pump to the new elevated tanks. Phase IA of the project includes all work related to the elevated tanks and approximately 2,000 linear feet of nearby transmission main. Phase IB includes the rest of the project elements. There are no stormwater impacts associated with Phase IB of the project. The existing well pump is contained within an existing pump house and no modifications to this building are proposed. Construction of the water transmission main improvements and the PRV station will temporarily impact stormwater during construction. This falls under the scope of a construction stormwater pollution prevention permit. Permanent restoration of the right-of- way will be with in-kind materials and does not cause any permanent changes to the hydrology of the affected areas. The property identified for construction of the tanks is owned by Mason County. Access to the site will be from West Public Works Drive on a proposed 10-foot wide private access road. Easements and/or property acquisition will be secured by the City for access, operation, and construction of the project. The center of the reservoir site is located at approximately 4715'21.47"N and 123009105.6811W within the Shelton Urban Growth Area. The subject parcel is 41.6 acres identified as parcel no. 42002-10-00020. It is located in Section 2, Township 20 North, Range 04 East, W.M. A vicinity map is provided as Figure 1 of this report. Additional identifiers for the property include: The tank site will occupy approximately one acre of the subject parcel's northwest corner with the rest of the property remaining undisturbed. According to the Mason County Public Health Department, the site is located within an aquifer recharge area. The designation is "highly critical." This project is proposing an infiltration basin to provide the required flow control. The infiltration basin is designed to infiltrate 100 percent of runoff from the 100- year storm. Flows in excess of the 100-year storm are released over a weir into a roadside drainage ditch. During an emergency where the elevated tanks are overflowing, the infiltration basin will also temporarily contain water until system operators can correct the problem. The basin will be sized to retain a minimum of 45 minutes of overflow from the water supply system, at the pumping system's normal flow rate which is 1,000 gallons per minute. Figure 1 Vicinity Map Site Area A 101 Johns tak c 4 f f ChLwch A v of Christ State Patrol s, 1u W Dayton Airport 41 Academy Alphatest Corporation r Sims Vibration W$us"7ess park Ro 101 Laboratory Frantz An Glass Gallery F Port of Shelton Water availability to the site will be through the City of Shelton. No sanitary sewer is required for this project because the facilities are unmanned and do not generate any waste. Overflow events would discharge potable water which would be directed to the infiltration basin. SHEET NOTES: I. ALL DUCTILE IRON WATER PIPING SHALL BE RESTRAINED WITH MINIMUM 42 INCHES OF COVER. DEFLECTION LIMITED TO ONE—HALF MANUFACTURER'S RECOMMENDATION. 42002-10-00010 2. SWAB AND CHLORINATE ALL NEWLY—INSTALLED WATER PIPING 120 W PUBLIC WORKS DRIVE CONNECTIONS AND OBSERVE FOR LEAKS. SEE SPECIFICATIONS FOR DETAILS ON WATERLINE TESTING. 3. OBTAIN GEOTECHNICAL ENGINEER'S APPROVAL OF FINAL TANK GRAVEL CONSTRUCTION SUBGRADE PRIOR TO PLACEMENT OF LEVELING COURSE AND NW SITE 069.49 I 77 ENTRANCE AND SITE PARKING, RESERVOIR FOUNDATION MATERIALS. SEE DET 6 SHT C-14 PROPERTY B FURNISH AND INSTALL: INSTALL INSTRUMENTATION , RESERVOIR PIPE AND FITTINGS SOUTH OF VALVE TO BE INSTALLED EASEMENT —I 1-16" FLEX—TEND ASSY, MJxFLG BUILDING PER DET 4, SHT C-14 4. AS PART OF APPROVED BID ALTERNATE. CORNER — � I—I6" BFV, FLG 2 FURNISH & INSTALL: 5. LIMITS OF WORK SHALL BE RESTRICTED TO EASEMENTS. 311 T6"-TRANSMISSION MAIN SEE NOTE 6 EA SITE S • 2 ' 20 9" — EASEMENT PER SHT CAS '— — — � SITE ACCESS VIA 10—FT WIDE 6. CONTRACTOR SHALL INSTALL PRESTRESSED STEEL SUPPORTS AND SEE NOTE 7 CORNER GRAVEL ROAD FROM EAST THREE—STRAND BARBED WIRE CLIMB BARRIER PER SHEET C-13 ON W 330.024' _ EXISTING FENCE. PROTECT EXISTING FENCE. 42002-24-90050 - `.T— '� 7 450 W DAYTON to 284 DO �?--*�. 7. ELECTR I CAL CONDUIT NOT SHOWN. SEE ONE—LINE DIAGRAM ON oD SHEET AER—El FOR MORE INFORMATION. ' AIRPORT ROAD o 4 27t00 M of 26+00 4.1 INSTALL CHAIN LINK GATE PER DET 2, SHT C-13 N71 4 .73 I 70 GRADING OUANT I T I ES: CENTER OF TANK \v y I `�\ s �/ LIMITS OF ADDITIVE ALTERNATE SEE NOTE 6 FOR SECOND RESERVOIR. SEE NOTE THE FOLLOWING GRADING QUANTITIES ARE PROVIDED FOR THE 4 EXCLUSIVE USE OF HE REGULATORY AUTHORITIES HAVING ` PROPOSED 4)b,�00 GALLON �`;. •-.11 JURISDICTION OVER THIS PROJECT FOR THE PURPOSES OF PERMITTING /MULTI—COLUMN ELEI_ATED STEEL ONLY. CONTRACTOR SHALL VERIFY ALL QUANTITIES PRIOR TO PLACING w' RESERVOIR \ II ;:;.1 I-'':- �I A B I D FOR THE WORK. NO ADD I T I ONAL PAYMENT W I LL BE MADE TO .;' WET WELL D I A= 50 FEET IF:',` ,•' { I= >:,I N712067.86 E9 55.8 50' ;, 1� g ;'`,1 I FURNISH AND INSTALL ALTERNATE): THE CONTRACTOR FOR DISCREPANCIES ASSOCIATED WITH THE \ OVERFLOW ELEV= 440 FEET o�{{,:;:. .,..:� / / ( FOLLOWING QUANTITIES: / ::.,.�/ 1-16' FLEX—TEND ASSY, MJxFLG 1-16" BFV, FLG • CUT: 200 CU. YD. • F I U.: 200 CU. YD. OVERFLOW DITCH PER n \ DET 5, SHT C-13 \ N N712038,80. E981654.68 / CENTER OF ALTERNATE TANK C \ — INSTALL FENCE PER DET 1, SHT C-13 C> N / � — — 2' TYP o — N 0 4 BOTTOM OF BASIN PROPOSED INFILTRATION BASIN N FOR STORMWATER AND RESERVOIR EASEMENT SITE TOP OF BASIN OVERFLOW i EA o SE SITE CORNER EASEMENT SITE AREAS 3 — CORNER COVER AREA (AC) C) 42002-10-00020 WATER TANKS 0.09 a PLAN MASON OCUNTY GRAVEL 0.25 3 — SCALE: I"=20' PERVIOUS AREAS 0.66 I C) 0 i + STORMWATER SHEET FLOW M !n H W W ' (n O Q U c rn N ' D_ 90% - SUBMITTAL j NOTICE NJM PRELIMINARY ONLY - �515F<^ SHEET D DESIGNED � � MR Murray,,SmithUssodates,Inc, Z CITY OF SHELTONRESERVOIR JO" Engineers/Planners UPPER MOUNTAIN VIEWa DRAWN �1Nos�Z PRESSURE ZONE $ITE PLAN Ci—� IF THIS BAR DOES0 NOT MEASURE 1" CHU ]IRMY,SURIASSOCIATES,IIG 1145 Broadway Plaza,Suite 1010 PHONE 253-627-1520 -e„on;,�gAS—WCo,,,M""iy PHASE 1A Q THEN DRAWING IS CHECKED Engineers/Planners NOT TO SCALE Tacoma,Washington 98402 FAX 253-627-1923 rOCE1HeR^ 6 of 20 YINO.1DATE BY REVISION PROJECT NO.: 13-1505.201 SCALE: AS SHOWN DATE: MARCH 2O14 Page 1 of 2 Grace Miller - RE: Follow-Up on Yesterday's Meeting From: Grace Miller To: Frank Marescalco Date: 3/25/2014 9:31 AM Subject: RE: Follow-Up on Yesterday's Meeting Frank, 1) RE:Aquifer Notice: * "Return to" - Your address as applicant or City of Shelton/Jerry Hauth and address. * "Notice text block - "Project name - ie: Water towers/reservoir, ? ...application number= #PAR2014-00013 (this is the only case number we have to date and will work. Ordinarily put Land Modification or Building Permit # in but this case references full project) * grantor = City of Shelton,—?—Dept. 2)I forwarded both of you e-mail questions from yesterday to Loretta Swanson in Public Works for a reply. Please contact Loretta at X 769 of you have any questions regarding stormwater plan, etc.. 3) I have attached the formal notes from the pre-application meeting that we had last week. Please let us know if you have any questions.Thank you. >>> Frank Marescalco <Frank.Marescalco@msa-ep.com> 3/24/2014 3:11 PM >>> Grace, What information goes in to the block on the Title Notification of Aquifer Recharge Area?Specifically, I'm wondering: • Whose address in the "Return to" section • What information goes in the lines for the "Notice" text block • In our case, who is the grantor? I'm also have some difficulty locating a standard set of Mason County Erosion and Sediment Control notes, if there is such a thing, and what a Clearing and Grading Approval Block might look like. We are preparing plans for submittal with the Construction SWPPP and I noted these two items which we don't currently have. Thanks, Frank J. Marescalco, EIT Murray, Smith&Associates, Inc. -www.msa-ep.com 1145 Broadway Plaza, Suite 1010-Tacoma,Washington 98402-4323 Tel: 253.627.1520 • Fax: 253.627.1923 ■finemsa-ep.com Notice:This e-mail and any attached files are the private confidential property of the sender,and the materials are privileged communications intended solely for the receipt,use benefit and information of the intended recipient indicated above. If you are not the intended recipient,you are hereby notified that any review, disclosure,copying.distribution,or taking of any other action in reliance on the contents of this transmission is strictly prohibited.and may result in legal liability on your part. If you have received this e-mail in error,please notify us immediately at the above address. Please consider the environment before printing this e-mail. about:blank 3/25/2014 1 4 Page 2 of 2 From: Grace Miller [mailto:Gbm@co.mason.wa.us] Sent: Friday, March 21, 2014 9:23 AM To: Frank Marescalco Cc: Barbara Adkins Subject: Re: Follow-Up on Yesterday's Meeting Frank, Attached please find the information regarding the Aquifer Recharge Area under from the MC Resource Ordinance and the portion of the Airport Overlay Zone Ordinance that applies to this project. 1) Aquifer Recharge - last page, after the chapter, please find the Title Notification form. This should be completed and Recorded in the Mason County Auditor's Office. Then a copy, to my attention, submitted to the Permit Assistance Center, to be placed within the parcel file. This can be done during the application process of either the Land Modification Permit or Building Permit. 2) Airport Overlay Zone -Included please find the applicable section of the Airport Overlay Zone Ordinance. Please see attached pg 10#(2)(B) 1 through 3. Once you receive this documentation/approval from the FAA, please submit it to the Permit Assistance Center so that Barbara Adkins and myself may review and verify compliance with this ordinance has been completed. This will be an administrative decision. Please let me know if you have any questions.Thank you. Grace >>> Frank Marescalco <Frank.Marescalco@msa-ep.com> 3/20/2014 2:50 PM >>> Grace, I wanted to follow up with you on yesterday's preapplication meeting for the Shelton tank project. When can we expect the forma comment letter? Also, we are doing the site design and it would be very helpful to have a turning template for the fire truck design vehicle. We'd like to know the minimum radius we can use for a turnaround. Does the Fire Department have a turning template? Thanks, Frank.Marescalco,EIT Murray,Smith&Associates,Inc.•www.msa-ep.com 1145 Broadway Plaza,Suite 1010•Tacoma,Washington 98402-4323 Tel:253.627.1520•Fax:253.627.1923•fjm@msa-ep.com Notice:This e-mail and any attached files are the private confidential property of the sender,and the materials are privileged communications intended solely for the receipt, use,benefit and information of the intended recipient indicated above. If you are not the intended recipient you are hereby notified that any review,disclosure,copying, distribution,or taking of any other action in reliance on the contents of this transmission is strictly prohibited,and may result in legal liability on your part. If you have received this e-mail in error,please notify us immediately at the above address. APlease consider the environment before printing this e-mail. about:blank 3/25/2014 Case Activity Listing 1161V 2/4/A 15 Case#: PAR2O14-00013 8:32:17AM Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By PARA910 Meeting 3/19/2014 None DONE PIB 4/18/2014 PIB PAR2014-00013 APPLICANT: JERRY HAUTH-CITY OF SHELTON MEETING DATE&TIME: WEDS,MAR 19TH,2014 10:45/11:00- 12:00 pm PARCEL NUMBER: 42002-10-00020 SITE ADDRESS: DAYTON AIRPORT ROAD PROJECT DESCRIPTION: CONSTRUCTION OF(2)WATER TANKS LOCATION: BLDG III,425 W.CEDAR STREET,SHELTON WA 98584 PLANNER: GRACE MILLER,ext 360 ENVIRONMENTAL HEALTH: LEE BOAD,ext 547 Notes sent. PARB20 Building Plan Review 3/4/2014 3/24/2014 None DONE LAW 3/24/2014 LAW The structural design will need to be per chapter 16 of the International Buildind code,a soils report showing the barring capacity is required. Page 2 of 3 CaseActivity..rpt Case Activity Listing 2/4/2%15 8:32:17AM lip, Case #: PAR2014-00013 1 r Assigned Done Activity Description Date I Date 2 Date 3 hold Disp 'fo By Updated Updated By PARA10 Application Received 3/4/2014 None GMM 3/4/2014 GMM PARB10 Planning Review 3/4/2014 3/19/2014 None DONE GBM GBM 3/25/2014 GBM Grace Miller attended meeting on behalf of the Planning Department.The property is Zoned as Public Institutional.The applicable Planning Dept requirements include the following criteria and requirements: 1)Airport Overlay Zone-The property is located within an Airport Overlay Zone,regulated by the Airport Overlay Ordinance 17.16.010.The applicable criteria of section 17.60.070 Airspace Protection Areas-Height Limitations(2)(B) 1 through 3 apply.Once you receive the documentation/approval from the FAA,please submit it to the Permit Assistance Center so that we may review and verify compliance with this ordinance has been completed.This will be an administrative decision. 2) Aquifer Recharage Area-The project is located on a Class II(HIghly Susceptible)Critical Aquifer Recharge Area.Aquifers are regulated by he Mason County Resource Areas Ordinance 17.01.080.The Title Notification Form must be completed and recorded within the Mason County Auditor's Office.Then a copy to the Planning Dept for the parcel file.This can be done during the application process of either the Land Modification Permit or Building Permit.The project does not require a Special use or Mason Environmental Permit because of the use. 3)Resource Ordinance-Fish&Wildlife Habitat Critical Areas Ordinance Section 17.01.110:The pocket gopher is designated within this chapter as a state threatend species.Therfore,a Habitat Management Plan addressing their presence on the site is to be submitted for review with the SEPA that the City will be processing and as part of the county applications or prior to county applications as part of the SEPA process. 4)SEPA-The Planning Department concurs that the City of Shelton will be lead agency for the SEPA Determination. 5)Stormwater Plan-The Stormwater Plan and checklist is to be submitted to the Planning Department as part of the Land Modification Permit Application.It will then be routed to Public Works for review for compliance with the county's stormwater ordinance as part of the review application.You may wish to work with Loretta Swanson,Public Works Dept., prior to submittal,if you have any questions. Please let us know if you have any questions.Thank you. PARB40 Environ.Health Review 3/4/2014 3/19/2014 None DONE LB LB 3/21/2014 GBM No Environmental Health Department review is required for this proposal,per Lee Boad,Environmental Health Specialist. PARB50 Public Works Review 3/4/2014 3/19/2014 None DONE FJP FJP 3/21/2014 GBM A Road Access Permit(RAP)will be needed for the access to Public Works Dr.Access will need to be finalized prior to the final approval of the building permit. RAP was given to applicant and can be turned in to Public Works PARB60 Fire Marshal Review 3/4/2014 3/19/2014 None DONE LAW 3/19/2014 LAW A copy of title 14 chapter 14.18 of the Mason County Code for group A water systems(Fire Flow)and a copy of ordinace 04-31 title 14 chapter 14.17 of the Mason County Code for Fire apparatus access road requirement.The plans submitted will need to comply with both standards.A permit will be required Page I of 3 Casenctivity..rpt Case Activity g Listin 2/4/2'b15 8:32•.17AM Case#: PAR2014-00013 i Assigned Done Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By PARA910 Meeting 10/6/2014 None DONE DLC 10/7/2014 DLC. Met with Jerry Hauth and Kelly Mayo to go over information that will be submitted soon to construct 1 water tower and an accessory shack less than 120 sf. Hoping to construct an additional water tower as well. 1)Jery will provide engineer est of cost in order to calculate the permit fees. Gave permit valuation info to Kelly M who may calculate fees. 2)Based upon use of the structure the risk category in accordance with IBC 1604.5 is IV. As a result structural observation. In addition staff will verify that design is prepared for the risk category. 3)We agreed that the access road may be 12-11 wide in accordance with MCC 14.17.060 and 10-ft wide around water tank properly prepared will comply with access standards. The following are notes from J Hicks via email to DLC addressing fire code review: Here are my notes from the plan meeting we had this afternoon. 1. Fire Hydrants. These will need to be placed down Public Works Dr.every 300-500 feet depending on past notes from Larry. The hydrants will support 1750 gpm for buildings at 500 feet and 5500 gpm 300 feet. This will need to be evaluated for future growth since this spacing will change fire flow in the respective areas around Public Works Drive. Hydrants may need to be added in the future to meet fire flow to address future development.. 2.Install Knox Box per IFC 506 3. Install compact drive surface capable of supporting the weight of fire apparatus 10 feet wide with a 12'unobstructed width and US vertical clearance per MC Title 14. 4. Our office will review the water distribution to ensure that it meets current standards for fire flow. I imagine that a 12"main will be installed,but we can talk about this if there are any issues. 5. Install approved turn around at end of road at/around water tank. If you have any questions please let me know. Jeromy PARA800 Documents Received 10/7/2014 None DONE DLC 10/7/2014 DLC 10.7.2014 emails between Hauth and DLC, ioncluding recap sent to attendees from MC staff.see documents attached. Page 3 of 3 CaseActivity..rpt YON Murray,Smith&Associate,Inc. EnoeerS leers 1145 Broadway Plaza,Suite 1010 Tacoma,WA 98402-3524 PHONE 253.627.1520 FAX 253.627.1923 May 13 2014 Ms. Genie McFarland Lead Planner Mason County Community Development PO Box 279 Shelton, WA 98584 RE: Land Modification Permit City of Shelton Upper Mountain View Pressure Zone Improvements Project, Phase IA—Case No. PAR2014-00013 Dear Genie: Please find attached a permit package assembled on behalf of the City of Shelton for the above-referenced Land Modification Permit. The permitting package contains the following items, consistent with the project pre-application meeting held on March 3, 2014: • Land Modification Permit Application • A copy of the Case Activity Listing • Federal Aviation Administration Airspace Study with Letter of Determination • Recorded Aquifer Recharge Title Notification • Pocket Gopher Habitat Management Plan • Geotechnical Report • Stormwater package including: o Mason County Construction Stormwater Pollution Plan Submittal Checklist o Stormwater Site Plan o Construction Stormwater Pollution Plan o Phase IA Plans o Legal Description of Subject Property • Mason County Fire Protection System Permit Application • Fire Flow Standards Compliance for Group A Water Systems Technical Memorandum Ms. Genie McFarland May 13, 2014 Page 2 The following items will be submitted following public bid and award of the construction contract: • Road Access Permit • Utility Permit • Building Permits The City of Shelton is the lead agency for preparation of the State Environmental Policy Act (SEPA) Checklist and the SEPA Determination. The SEPA process is currently underway. The final determination will be submitted to the County as soon as it is available. Sincerely, MURRAY, SMITH&ASSOCIATES, INC. U L-7)— it Chris Uber, P.E. Senior Vice President CHU/fjm cc: Jerry Hauth, P.E., City of Shelton file