Loading...
HomeMy WebLinkAboutPAR2015-00001 - PAR Letters / Memos - 2/4/2015 PAR 2a 15- LLB DATE 1—Z- 15 PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as mRan , ial p Ins possible in order for the project to be processed without delay. Representatives for the Fire is Department, Environmental Health, Planning, and Public Works Departments may attend tis d'scusand regulations applicable to the proposed project. Topics covered during the meeting will c ensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building con cation, fire protection and life safety concerns of the proposed project. The pre-submission conference will be in e when you provide accurate and detailed information on the Pre-Application Conference Application Fo and the s e plan.Applications will be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 6 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1. Pre-Application/Dept. of Community Dev. 2. Environmental Health 426 W Cedar Street 415 N 5t' /PO Box 1666 Shelton,WA 98584 Shelton, WA 98584 360.427.9670 ext.352 360.427.9670 ext. 400 Check amount: $255.00 Check amount: $100.00 BOTH CHECKS MADE PAYABLE:MASON COUNTY TREASURER Applicant: Site Plan Name: nmck yy\ Submit 6 copies Mailing Address: `�(� f �}= ` , Include the following information Daytime Telephone: Fax: ❑ Indicate Scale and North Arrow Email address: 1,4 r� �►S ❑ Property line dimensions,easements, and right-of-ways. Representative: Name: El proposed location of all existing and proposed structures.Include square Mailing Address: v e, footage of existing and proposed structures. Daytime Telephone: Fax: ❑ Setback distance,in feet from all Email address: property lines and structures. Parcel Number: (12 d--A-R 06 A - ID - ppjR a 0 ❑ Existing and proposed road access to and from the site. Description of Project: Include: 1) Square footage of structure,2)Use of building and rooms(i.e., El Parking sites office,warehouse,restaurant, storage,etc), 3)Occupagcy classification per ❑ Location of on-site sewage tanks and drainfields. IBC, Section 302.1, and construction type. 4)Provide two sets of plans, if ❑ Location of drinking water supply. available.Use separate sheet if necessary Cy)Ac,5 V' Coi,,, J,,, Include location on the proposed site and surrounding parcels. w P b -J \.J o���5 El Steep bluffs,wetlands,streams,and Y J�.(.v Uti. iti .c bodies of water .\ n � ❑ Location of fire hydrants and a 0 0 t1u— '1S U�U 54 �.� 'oMt �.� U ., i emergency vehicle access roads, c, ,. C6_\D C a including grade. IQ �Lq�,\C L^ c-yJ �u& u \s-L (11V�'Jll ❑ Surface and storm water run-off routes. Has the project been discussed during a previous Pre-Application Conference: If yes,please indicate date. �fl Will the building have employees? If yes, how many? fflo W'_'a V YY1 a�,�9 What is the witeT availability of the proposed project?If there is an existing well, what is the name of the system?�� A�� V�CM \n1 (L-11 What is planned for the on-site sewage system? If you are proposing a new on-site system provide detail on the required site plan. & c S 2 ADDITIONAL INFORMATION.• -+- l2 o VA 1r_-_CD Fc Q� s YV �Q 2 iLIV►' APPLICABLE BUILDING CODES 2012 International Building Code/2009 International Residential Code 2012 International Fire Code-ANSI Al 17 2012 International Mechanical Code—WAC 5142 2012 Uniform Plumbing Code—WAC 51-56/5147 2012 International Energy Cons. Code/Washington State Energy Code—WAC 51-11C&51-11R Mason County Ordinance Title 14 Code changes are on a 3 year cycle;effective in July of that particular year. Date of Conference: Time of Conference: Location of Conference: 426 west Cedar street,Shelton Planner: ext. cjaz � PRE-SUBMISSION MEETING FOR WEDNESDAY, JANUARY 14TH 2O15 PAR2015-00001 �05�pc►wl 1�u ��'►► i s sti'k APPLICANT: Mason County Facilities MEETING DATE AND TIME: Wed, January 14th 2015 9:15am/9:30am-10:30am PARCEL NUMBER: 42002-10-00020 SITE ADDRESS: Public Works Drive PROJECT DESCRIPTION: Mason County Facilities is investigating potential for building a evidence facility at property on Public Works Drive. The 5.5 acre site would include a 20,000- 25,000 sq ft metal building for evidence and a 8-10 vehicle canopy for storing vehicles and boats, It would be entirely fenced. LOCATION: 426 W Cedar St. Shelton Bldg I II Conference Room PLANNER: Grace Miller- Ext 360 PUBLIC HEALTH STAFF: Cindy Waite- Ext 353 R2014-00079 A T: Erica Weick, Ganja Vita MEETING ND TIME: Wed, Janua 10:45am/11:00am-12:00 pm PARCEL NUMBE . -50-0000 SITE ADDRESS: 23441 oute 3, Belfair PROJECT DESCRIP 00 S 'Iding with 1-502 retail store. Including an office/secretary room. LOCAT 6 W Cedar St. Shelton Bldg I II nce Room P R: Allan Borden- Ext 365 BLIC HEALTH STAFF: Cindy Waite- Ext 353 / 40 li lboo,D00 Sf v (�� 1 r= �� T.t1L��tiw ti"` Q U Ar L6,", V i 1 L 0-O ``�w���C yh5ri a��.l vr�kuh U&A lip Mason County Map Output Page Page 1 of 1 Mason County Map e # 4 420022426050 m r i 9, } \ 420021000020 nzaozzn9ooca i •� ��" a �'e Ou1,t yy.t_ � M list ya 4'� . •i i 't'� �• T{' tfl•.CaNa�I a i . 420022.190070 r {- azoo2z4000lo t DISCLAIMER AND LIMITATION OF LIABILITY: The data used to make this map have been tested for accuracy,and every effort has been LEGEND made to ensure that these data are timely,accurate and reliable.However,Mason County makes no guarantee or warranty to its accuracy as to labeling,dimensions,or placement or ;•- location of any map features contained herein.The boundaries depicted by these data are F 033 !..3nd5 f e�r.•r.9' approximate,and are not necessarily accurate to surveying or engineering standards,and are f Hlgtiwrayh of`hzlton intended for informational purposes only.Mason County does not assume any legal liability or responsibility arising from the use of this map in a manner not intended by Mason County. l fYrry 5lraa�i5 rr is F„urn,yr�jf•tR t In no event shall Mason County be liable for direct,indirect,incidental,consequential, t s Special,or tort damages of any kind,including,but not limited to,loss of anticipated profits Pet,a�{e �_$;niy.;cc�orti'i Lt3!IIIs or benefits arising from use of or reliance on the information contained herein Lakes I va ®2009-Mason County GIS Town>li as # P-Jqt:soruoJ d M.ar.r Lo`(' S i 100 W.Public Works Dr Shelton,WA 9M OD �32� 12, voc� ift-.//rrl anm a cnn.co.mason.wa.us/servlet/com.esri.esrimap.Esrimap?ServiceName--amaso... 12/30/2014 cot" MASON COUNTY '' (360)427-9670 Shelton ext.352 DEPARTMENT OF COMMUNITY DEVELOPMENT (360)275-4467 Belfair ext. 352 BUILDING•PLANNING•FIRE MARSHAL (360)482-5269 Elma ext. 352 iasa Mason County Bldg. III, 426 West Cedar Street - Shelton, WA 98584 www.co.mason.wa.us April 15, 2015 , Blase John Keates, Mason County Facilities 411NSthST F Shelton, WA 98584 (7:-l�� , RE: Sheriffs Evidence Facility to potentially be located on.Parca No. 42002-10-00020. 1;90 ;r.-,ito Fib. Dear John: Enclosed please find the summary notes and additional requested information from our pre-application meeting that was held on 1/14/15. The meeting was held to discuss the potential evidence facility for the sheriff s office to be located near the Public Works Facility. I have enclosed the summary of all department findings for permit requirements as discussed during the meeting. In addition I have gathered examples of similar recent applications for development in the vicinity as they relate to potential resource areas. The applicable zoning section and aquifer recharge area notification form are enclosed. Also enclosed are two other habitat management plans for mazama pocket gophers which may be present on this site so that you have an idea of what those entail. Please let me know if you have any questions or I can be of further assistance. Thank you. Sincerely, Grace Miller, Planner DEPT OF COMMUNITY DEVELOPMENT w UASON ZO.UNTY DEPARTMENT OF'COMMUNITY DEVELOPMENT Wason Bldg. 111, 426 West Cedar Street PO Box 1B6,`.Shelton, WA 98584 8 vmwxomwwn.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: Debbera Coker (360) 427-9670 EXT 510 E-Mail: DLC@co.mason.wa.us • DATE: January 14, 2015 • PROJECT/PROJECTT:RACKING NUMBER: PAR2015-00001 • PROJECT REPRESENTATIVE (S): John Keates, Mason County Facilities • DESCRIPTION &SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: Construct a 12,500 sq. ft evidence bidg, 6 to 8 bay structure to park vehicles and boat(s), fence yard. Structures shall be designed in accordance with the 2012 International Building Code, Fire, Mechanical, and Energy codes as-amended by Washington State and the Uniform plumbing code. Based upon information provided the occupancy classification is S-1 for both structures. A fire sprinkler system shall be required when a fire area exceeds 12,000 sq. ft, reference I BC Section 903.2.9 or when high piled storage.is.located in the building (typically storage areas 12-ft ht or more). A fire sprinkler system shall also be required if a fire hydrant is not located within 400-ft of the furthest section of a building. When a hydrant is located more than 400-ft from the furthest section of the building fire flow is not considered adequate and mitigation shall be required. Structures more than 4000 sq. ft shall require a code analysis to evaluate the structure and life-safety code requirements. More information provided in the document. Complete building permit applications will include the following information that is applicable to the project:: • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures, including fencesJuel tanks and other similar items, with setback dimensions on site the plan. • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, &tested assembly details. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC. Type VB'construction includes structures constructed with combustible construction such as wood framed structures. Type II construction includes steel structures constructed ENTIRELY by non-combustible construction. • FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION : Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: EXTERIOR WALL (IBC704), FIRE WALL (IBC705), FIRE BARRIER (IBC706), SHAFT ENCLOSURES (IBC 707), FIRE PARTITIONS (IBC 708), SMOKE BARRIERS (IBC 709), SMOKE PARTITIONS (IBC 710), HORIZONTAL ASSEMBLIES (IBC 711), PENETRATIONS (IBC 712), FIRE- RESISTANT JOINT SYSTEMS (IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS (IBC 714), OPENING PROTECTION (IBC 715), DUCT&AIR TRANSFER OPENINGS (IBC 716), CONCEALED SPACES (IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. • ENGINEERING REQUIRED: YES...Structures that do not comply with prescriptive specifications of the 2012 International Code (IBC) shall be designed in accordance with Chapter 16 of the IBC. Referencing Washington State RCW 18.08.410- Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that building plans contain compliance information. • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc. • Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less, then unisex fixtures shall be allowed. To calculate the number of fixtures and referencing Table 2902.1 the following fixtures shall be required: Offices: 1 water closet per 25 for the first 50 and 1 per 50 for the remainder exceeding 50. 1 lavatory per 40 for the first 80. Storage(S1&S2): 1 water closet per 100 and 1 lavatory per 100. Plumbing fixture count can be for the entire facility, including all structures)for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. • NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces require Non-Residential Energy Conservation Code (IECC/WSEC). Provide completed compliance forms (envelope & mechanical). Forms are available at: http://www.neec.net/resources/resources.html • LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete compliance forms and provide a lighting plan that includes switching locations. WSEC forms and information can be accessed at: http://www.neec.net/resources/resources.html. In addition your local utility may have an incentive program, designed to help you lower energy consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by calling (360) 426-0777. • VENTILATION: Provide information and calculations demonstrating compliance to the 2012 International Mechanical Code. • GEOTECH REPORT REQUIRED? NOT REQUIRED BY THE BUILDING DEPT. • OIL SEPARATOR: REQUIRED when vehicle repair work is performed. Identify location and provide construction details. • PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL& SOLID WASTE (WAC51-50-009): Identify the location. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. Statement of special inspections prepared by registered design professional in responsible charge. Complete a Special Inspection authorization form. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. • STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include MSDS sheets for each product. • STORAGE RACKS greater than 5'9" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. • SPRINKLER SYSTEM: Verify that design calculations include additional load attributed to required fire sprinkler system. • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings where applicable. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. • OTHER: PERMITS REQUIRED FOR PROJECT o BUILDING o PLUMBING/ MECHANICAL ❑ GRADING PERMIT (When greater than 200 cubic yards) ❑ CHANGE OF USE o FIRE PROTECTION, where required. See Fire Marshal comments o SIGN o FENCE (Greater than 7'0" above grade) r, 0 ADDITIONAL NOTES: WHEN YOU ARE READY, SUBMIT FOUR (4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3) COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE, ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE EXCEEDS 4000 SQ. FT.): • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details, etc. • MECHANICAL PLAN, • PLUMBING PLAN AND • NON-RESIDENTIAL ENERGY CODENENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • DEFERRED SUBMITTAL WILL NOT BE ACCEPTED. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF THE 1997 UBC. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND LOAD: 85 MPH, Exp B (Unless proven otherwise) SNOW LOAD: 25 psf REFERENCE CODE EDITIONS: Effective July 1, 2013 2012 INTERNATIONAL BUILDING CODE (IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND; ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50, AND THE 2009 INTERNATIONAL EXISTING BUILDING CODE. 2012 UNIFORM PLUMBING CODE (UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15, AND 16, PART I. 2012 INTERNATIONAL MECHANICAL CODE (IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D, AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 54. 2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us. MASON COUNTY FIRE MARSHAL PRE-SUBMISSION CONFERENCE NOTES FIRE MARSHAL REPRESENTATIVE: Debbera Coker(360)427-9670 EXT 510, E-Mail: DLC@co.mason.wa.us DATE: January 14, 2015 PROJECT/PROJECT TRACKING NUMBER: PAR2015-00001 PROJECT REPRESENTATIVE(S) or APPLICANT: John Keates, Mason County Facilties PROJECT DESCRIPTION & SIZE: Construct 12,500 sq. ft structure to store evidence, 6 to 8 bay structure to store vehicles and boat(s), fence facility. The following information is essential to perform a plan review by the Fire Marshal's office. Proposed construction plans and documents should include all information listed below. Please note that the Fire Marshal representative has made every attempt to identify all critical information that will be needed based upon the information provided in the pre-application documents. Additional information may be necessary when the Fire Marshal is presented with proposed plans for the project. The information provided below references the current adopted codes. A complete list is provided at the end of this document. • OCCUPANCY CLASSIFICATION & USE : Based upon information provided the occupancy classification is S1. Identify the occupancy classification(s) and specify use as defined and specified in accordance to the current International Building Code (IBC), Chapter 3 and International Fire Code (IFC), Chapter 2. • CONSTRUCTION TYPE: Based upon information provided the type of construction in type VB Referencing IBC, Chapter 6 clearly identify the type of construction. • WATER SUPPLY& FIRE HYDRANT: Referencing IFC, Section 508; clearly identify the location of fire hydrants. When located within 400-ft of the furthest section of building fire flow is provided. • FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Please provide a copy of the completed worksheet with proposed construction documents. • EMERGENCY VEHICLE ACCESS: A copy of the "Standards for Fire Apparatus Access Roads" adopted through Mason County Building Code, Section 14.17 is attached. Verify that documents clearly identify code compliance. • ADDRESSING: MARK ADDRESS OF BUILDING. Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings shall have an approved address. Applications for an approved address can be obtained on the Mason County website at: www.co.mason.wa.us, Forms and Brochures, Community Development, the address to the referenced web page is: http://www.co.mason.wa.usfforms/Community_DevAndex.php. Each building within the facility shall be distinguished with a separate identification so that emergency personnel can find the building in the event ti of an emergency. • EXITS: Verify that construction plans comply with IBC and IFC Chapter 10. Provide a code evaluation that includes calculations demonstrating compliance to Section 1004. Construction plans must clearly identify all exits, exit paths, length, signage information, etc. • AUTOMATIC FIRE ALARM: REQUIRED... Referencing IFC, Section 907 and NFPA 72, provide information demonstrating compliance. Note that automatic fire alarm systems shall require a separate "Mason County Fire Protection System Permit Application". The application can be obtained by going to same website and page referenced above. • SPRINKLER SYSTEM: Referencing IFC, Section 903 and NFPA 13, provide information demonstrating compliance. Note that automatic fire sprinkler systems shall require a separate "Mason County Fire Protection System Permit Application". The application can be obtained by going to same website and page referenced above. • KNOX BOX: Referencing IFC, Section 506, access shall be required, typically through use of a knox box. Provide compliance information with construction documents. Contact the local fire district to make arrangements for an approved key box, location, etc. The local fire district for your project is Fire District Number: 11 and can be reached as follows: (360) 426-1822 • GAS METERS/TANKS: Referencing The International Fuel Gas Code (IFGC) and NFPA 58 provide compliance information as required within the referenced codes. • STORAGE (TYPE, HEIGHT, ETC.) Referencing IFC, Chapter 19 (Lumber yards and wood working facilities), Chapter 23 (High-piled combustible storage), Chapter 27 (Hazardous Materials), etc. o Identify all materials to be stored, including commodity classification (see IFC2303 and Table 2306.2), and type of plastics when applicable. Include anticipated quantities, loose or baled, anticipated height, o Identify hazardous materials classified as a physical or health hazard, include MSDS sheets as specified in IFC Section 2703.4. Referencing Table 2703.1.1(1), identify proposed control areas and method of protection. Referencing IFC Section 2704, identify spill control and proposed secondary containment, see also IFC Table 2704.2.2 o Identify method of storage (i.e. racks, shelves, pallets and what storage method is constructed of such as plastic, wood, metal, etc.) If pallets will be used , identify location of unused pallets and anticipated quantity o Identify flammable and combustible liquids, flammable gases, and flammable solids regulated under IFC Chapters 34, 35 and 36. Include information demonstrating compliance, including proposed storage, classification of flammable material and/or combustible liquid. • OTHER: REFERENCE CODE EDITIONS: Effective July 1, 2013 2012 INTERNATIONAL BUILDING CODE (IBC), INCLUDING APPENDIX CHAPTERS C, E; SECTION 101 THROUGH 106,AND H; EXCLUDING SECTION H106, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND'ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-50, INCLUDING AS APPENDIX M, 2006 INTERNATIONAL EXISTING BUILDING CODE. 2012 INTERNATIONAL RESIDENTIAL CODE FOR ONE-AND TWO-FAMILY DWELLINGS(IRC), Including Appendix Chapter G, as published by the International Code Council Excluding Part IV Energy, Part VII Plumbing, Part VIII Electrical and Appendix Chapters A, B, C, D, E, F, H, I, J, K, L, M, N, O, P, and Q; and adopting the Washington State Building Code WAC 51-51. 2012 INTERNATIONAL FIRE CODE, published by the International Code Council, excluding Appendix A, and adopting Appendices B, C, D, E, F, G and adopting the Washington State Building Code WAC 51-54. 2012 UNIFORM PLUMBING CODE (UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57. 2012 INTERNATIONAL MECHANICAL CODE (IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2012 INTERNATIONAL ENERGY CONSERVATION CODE IECC AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51- 11 I I I I I I r Case Activity Listing 4/15/2015 12:16:07PM Case#: PAR2015-00001 lip, Assigned Doue Activity Description Date I pate 2 Date 3 hold Msp Ib By Updated Updated By PARB50 Public Works Review 1/2/2015 None FJP 2/4/2015 FJP A Road Access Permit(RAP)will be needed and can be picked up at Public Works. Typically one access per parcel is allowed unless a second can be justified. PARA10 Application Received 1/2/2015 None GMM 1/2/2015 GMM PARB20 Building Plan Review 1/2/2015 1/14/2015 None DONE DLC 2/4/2015 DLC See bldg dept.document attached Meeting held on 2.4.2015 notes: _ 1)Based upon information resented the project will not involve more than 200 cubic yards. Referencing 14.44.050 a grading permit is not required when<200cubic ds are involved P P P J Y g g g P q y o ed to the development. Stormwater plan shall be required. Include stormwater plan with bldg permit documents. 2)Sanitation is not required for buildings not normally occupied such as the evidence bldg and vehicle/boat storage bldg. Future development including office,and training will need to be provided with facilities as required in the IBC and UPC with hot and cold running water. 3)Verify essential use in accordance with IBC 1604.5. Proposed bldgs appear to meet the criteria of an essential bldg in risk category IV. As such buildings shall be designed and inspected iccardance with the risk factor including structural observation. PARB40 Environ.Health Review 1/2/2015 1/14/2015 None DONE CEW 1/14/2015 CEW Will need water adequacy sign of from the City of Shelton.Licensed designer will need to address flows and waste strength unless you can hook up to the City of Shelton Sewer. PARB60 Fire Marshal Review 1/2/2015 1/14/2015 None DONE DLC 1/14/2015 DLC 1.14.2015 See document attached PARM999 Attached Document 1/14/2015 None DONE DLC 2/4/2015 DLC Meeting scheduled for 1.14.2015 was canceled because the representative was not able to attend. An email containing information was sent to the representative. See document attached-DLC 1.14.2015 SEE ALSO NOTES ADDED TO BLDG ACTIVITY RELATING TO 2.4.2015 MEETING. Page 1 of 2 CaseActivity..rpt Case Activity Listing 4/15/2015 �I Case#: PAR2015-00001 12:16:07PM lip, Assigned Done Activity Description Date 1 Date 2 Dale 3 hold Msp To By updated updated 13y PARB10 Planning Review 1/2/2015 2/4/2015 None DONE GBM GBM 4/15/2015 GBM Grace Miller attended the meeting on behalf of the Planning Department.The property is Zoned as"Public Institutional"within the Shelton Urban Growth Area.The proposed Government Buildings are listed as"Permitted Uses"within this zoning.The applicable Planning Department comments include the following criteria and requirements: 1) Airport Overlay Zone-The property is located within an Airport Overlay Zone,regulated by the Airport Overlay Ordinance 17.16.010.Staff gave you a copy during our meeting.It appears that the applicable criteria of Airspace Protection Areas,Section 17.60.060,70,80,and 100 apply.Please contact Brandon Palmer with the Port of Shelton to determine which Air Space Zone your proposal is located in and if you are required to obtain aproval from the FAA for the proposed construction.Once you receive documentation/approval from the Port and/or FAA,please submit it to the Permit Assistance Center so that we may review and verify compliance with this ordinance has been completed.This will be an administrative decision. 2) Aquifer Recharge Area-The project is located on a Class II(Highly Susceptible)Critical Aquifer Recharge Area.Aquifers are regulated by the Mason County Resource Ordinance 17.01.080.Staff gave you a copy during our meeting.The Title Notification Form must be completed and recorded within the Mason County Auditor's Office.Then a copy to the Planning Department for the parcel file.This can be done during the Building Permit Application process.Please verify that the materials stored within the facility meet the requirements of the ordinance.If they do not or any of the listed materials are to be on site,additional permitting may be required. 3) Resource Ordinance-Fish&Wildlife Habtat Critical Areas Resource Ordinance section 17.01.110:It is possible that pocket gophers are present on the building site.The pocket gopher is designated within the Fish&Wildlife Habitat Conservation Area Chapter of the Resource Ordinance as a state threatened species.Therefore,a Habitat Management Plan addressing the potential pocket gopher habitat will be required.The Habitat Management Plan may be submitted for review with the SEPA checklist,in advance of the Building Permit Applications. 4) SEPA-Please submit a completed SEPA checklist for the Planning Department to review and process either to the Building Permit Application or with it.There is a 14 day comment period once the SEPA determination is issued.Staff gave you a copy during the meeting.The Habitat Management Plan for the pocket gophers should be submitted with the checklist. 5) Parking and Stormwater Plan-Please sumbit a Parking and Stormwater Plan with your Building Permit Application.The parking shall conform to the Mason County Parking Standards 17.08 within the Shelton Urban Growth Area Development Regulations 17.07.The Stormwater Plan and Checklist are to be submitted to the Planning Department for review as part of the Building Permit Application.Staff gave you a copy of each during our meeting.You may wish to work with Loretta Swanson,Public Works Dept.,to assist you with the submittal.The parking and Stromwater Plan must consider potential impacts to the critical aquaifer recharge area. The application does not appear to require a Mason Environmental Permit or Secial Use Permit at this time.Please let us know if you have any questions. Page 2 of 2 CaseActivity-rpt