Loading...
HomeMy WebLinkAboutBLD2024-00457 Repair Tree Damage - BLD Application - 3/22/2024 MASON COUNTY COMMUNITY SERVICES =l C _ PERMIT ASSISTANCE CENTER: C •BUILDING-PLANNING•PUBLIC HEALTH-FIRE MARSHAL 615 W.Alder Street,Shelton,WA 985B4 Phone Shelton:(360)427-9670ext 352-Fax.(360)427-7798Phone MAR 2 2 2024 Bellair.(360)275 4467•Phone Elma:(360)482-5269 BUILDING PERMIT APPLICATIONW.'Alder Street PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION NAME::,\� �� C'r NAtyIE: (f'r\CY ll;a e i Skcs LLC MAILING ADDRESS: J MAIING DRESS:; > ; CITY �k�r1 STATE: r ZIP: CITY v1 STATE t�:>r ZIP:QmY PHONE ft PHONE:Zie-o L,2-i-7 PHONE*2: EMAIL: ArxLjk ct EMAIL- L&I PRIMARY CONTACT: OWNER❑ CONTRACTORS OTHER[] NAME fZ EMAIL MAILING A . -; I, ,FATE _ZIPS �t PHONE CELL RESS PARCEL INFORMATION: PARCELNU1,0FR(12DigitNumbm) I,{Zpc�S, OV��� ZONING__!�j-rypti- LEGAL DESCRIPTION(Abbreviated) IST�RI`CT SITEADDRESS DIRECTIONS TO SITE ADDRESS IS THE PROJECT WIT-HIN 300 FT OF SLOPE(S)GREATER THAN 14%.- YES❑ NO#SNOW LOAD:_psf IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all char apply); SALTWATER❑ LAKE❑ RIVERICREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ TYPE OF WORK: NEW❑ ADDITION❑ ALTERATION❑ REPAm>0 OTHER rl USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Ete) IS USE: PRIMARY SEASONAL❑ NUMBER OF BEDROOMS NUMBER OF BATHROOMS DATED STRUCTURE? YES ffhoteBldg)X YES(Partjs)ofBlde❑ NO❑DESCRIBE WORK_7:V e SOUARE FOOTAGE:(propasedf 1ST FLOOR ,.fL 2ND FLOOR qQ sq.fL 3RD FLOOR sq.ft. BASEMENT sq.fL DECK sq.ft. COVERED DECK sq.fL STORAGE sq.& OTHER sq.$ GARAGE q.f-Attached% Detached❑ CARPORT sq.fL Attached❑ Detached I] MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERLALNUNBER ENVIRONMENTAL HEALTH: - SEWAGWSEWER SOURCE: SEPTICA SEWER❑ 1 NEW❑ EXISTING❑ PLUMBING IN STRUCTURE? YES❑ NO•y V-yes,attach completed W.1,AdeguaryForm PERDXBTa2IFOUNDATTON�PROPOSED? YES❑ NOZ EXISTING SQ.FT. EXISTING BEDROOMS PROPOSED BEDROOMS -'Q TOTALBEDROOMS — OWNER acknowledges that submission of inaccurate information may result in estop work order or permit revocation.Acknowledgement of such Is by signature below.I dedare that lam the owner and I further declare that 1 am entitled to receive this permit and to do the work as proposed.I have . obtained permissionfmm all the necessary patties,including any easement holder or parties of interest regarding this project.The owner or legal represerdative,represents that the information provided Is accurate and grants employees of Mason County access to the above desonbad property and structure(s)for review and inspection.This permitlapprrcation becomes nun&void If work or authomsd construction Is not commenced within 180 days or r oonstnrction work is suspended.for a period of 180 days. PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PER APPLICATION OF ISO DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) Xl-ftnatura of OWNER(Must be signed by the OWNER) Date n ,4R)MENTAI.TREW �- ePROVED(,'-iDATE` g DEhIFJ)�F .'DIE; � AGSItQaTES/COlYDITTONS<' BUILDING DEPARTMENT J TL PLANNING DEPAR MENNT FIRE MAR SEAL PUBLIC HEALTIi Permit Nc `�tiJ1.1./ZA-c) O � w; MASON COUI _, ED COMMUNITY DEVELOPN ' - Permit Assistance Center, Building,Planning MAR 22 2024 PLUMBING & MECHANICAL PERMIT APPLICAT�QN Alder Street OWNER NFORMATION: CONT CTOR INFORMATION: NAME: NAME: MAILING DRESS: MAILING A DRESS: '1 E lace \e CITY: STATE:ZIP: C CITY:`-la-qn STATE: ZIP: I"PHONE: PHONE:' -7-14StpCELL: 2nd PHONE: EMAIL : &<ior[ S�oRCto( -C'cW1 EMAIL: L&I REG# i�[r (�(V12 EXP.o/_a)I PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number): ��� (�(� /o� Zoning: LEGAL DESCRIPTION(Abbreviated): SITE ADDRESS: �G I o�dIC CITY: DIRECTIONS TO SITE ADDRESS: L TYPE OF JOB: NEW 0 ADD=ALI=REPAOTHER=USE OF BUILDING LOCATION OF FIXTURES/UNITS—I ST FLOO 2"DFLOOR=BASEMENT=GARAGE ]OTHER PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No.of Fixtures Fees Fuel Type:Electric' �LPGQNatural Gas[�Ductles= Toilets ape of Unit No.of Units Fees Bathroom Sink Furnace _ Bath Tubs I Heat Pump Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hose bibs Dryer Vent Other Solar Panel Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER acknowledge submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF /CONTIATION OFTHIS PERMIT IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS TE THE APPLICATION. V /Zature of Owner Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT -m- PLANNING DEPARTMENT FIRE MARSHAL Rev:1/27/2016 JBN i�?L 0 RDRq-00 4 s7 S UPERIOR WALL I'INISHES 301 E.Wallace Kneeland Blvd.,Ste. 224, Box 118 Shelton,WA 98584 Office/Fax: 360-427-7456 ESTIMATE aperiorwallfinishes@aol.com RF E I V E D Date Estimate Shiloh Downer AP - 3 2024 Feb 27, 2024 2024-023 Price Valid for 30 Days 70 E Westwood Dr, 615 W. Alder Stree Shelton, WA 98584 Contact Name Shiloh Downer Phone Number 360-470-2420 Email Address Shilohd420@msn.com —_ ------_ -— ------ - -� Job Address Project Manager Phone Number Same as above. Josh T(360)229-0898 Scope of Work 1. Purchase all materials necessary for completion of job as described in bid. 2. Remove and replace roof. 3. Remove and replace sheathing as needed. 4. Remove and replace scissor truss 5. Remove and replace gutters 6. Remove and replace drywall 7. Remove and replace soffit&fascia 8. Remove and replace siding 9. Remove and replace insulation (ceilings only bring to code) 10.Remove and replace doors 11.Install flooring, carpet&baseboards 12.Remove and replace deck 13.Remove and replace electrical 14.Install new cabinets, sinks, appliances,vanity, mirror,toilet, shower&tub 15.Remove and replace plumbing 16.Paint interior and exterior 17.Remove and replace cedar fence 18.Clean up all debris created by employees of Superior Wall Finishes. Note:Delivery Fees to be applied after drop. All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Superior Wall Finishes,LLC is not responsible for heat,trade damage or excessive moisture.Contractor to pay for any stocking or scrapping cost above standard. All extra work to be priced prior to work being performed or will be done at T&M rate of$85.00 per hour+15%markup on all cost. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate.All agreements contingent upon strikers,accidents,or delays beyond our control.Superior Wall Finishes, LLC warrants a one-year workmanship warranty.Our workers are fully covered by Workers Compensation Insurance.Superior Wall Finishes, LLC has permission to take before and after photos regarding the project used for marketing,promotions,and references.Work will begin once contract is signed,weather permitting. 'Down payment of half for materials needed,and rest of payment when project is complete unless other arrangements have been made. i F­111111111111111111111 Terms: Payment due upon receipt unless other arrangements have been made. Cost $147,290.50 Late charge it per day,thereafter. — 'Credit cards accepted with a 3.5%charge for inconvenience fees' Acceptance of Estimate Tax(Mason County The price,specifications,and conditions are satisfactory and are hereby 8.5%) $12,961.77 accepted.You are authorized to do the work as specified.Payment will be made as outlined above. Signature Date ' Total $160,252.27 t � PIN Own Sound Adjusters O V 1 �/S P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com Insured: SHILOH DOWNER RECEIVED Home: (360)470-2420 Property: 70 E WESTWOOD DR. SHELTON,WA 98584 MAR 2 2 2024 Claim Rep.: NICK LAFONTAINE 615 W. A i d e r Street Business: (360)447-8639 E-mail: CLAIMS@SOUNDADJUSTERS. COM Claim Number: I4U5628001H Policy Number: OCMJ446106027736331 Type of Loss: Other Date of Loss: Date Received: Date Inspected: Date Entered: 2/l/2024 12:00 AM Price List: WAOL8X FEB24 Restoration/Service/Remodel Estimate: SHILOH DOWNER ***Please be advised, To Whom It May Concern: We reserve all of our rights as a Public Insurance Adjuster.Any attempt to interfere with our contract or our business relationship with our client will be considered"tortious interference",also known as"intentional interference with contractual relations",and will be followed up with the appropriate civil action against the tort feasor and the company they are acting as an agent of,in the jurisdiction where our contract originated. Indemnity is defined as a contractual obligation of one party(indemnifier)to compensate the loss incurred to the other party (indemnity holder)due to the acts of the Indemnitor or any other party.The insurance contract is built around this principle.The following demand is for indemnity.This is not a retail bid for construction and not a race to the bottom to see who can do it the cheapest.This is compliance with an insurance contract to make the insured whole and bring them to pre-loss condition.Our valuation is to make the insured whole and bring the insured to a pre-loss condition.To bring an insured to pre-loss condition,all the obligations of the contract,building code,manufacturer's instructions,OSHA and other requirements must be met and are reflected in the contract.These are not upgrades and are not the cost of doing business.After reading the contract,I have not seen anywhere that specifically says any of my line items are not paid for and since all of the items are reasonable,they should be paid in accordance with the principle of indemnity. This valuation was prepared accordingly The Adjuster understands what overhead and profit is and how it applies to business, OSHA standards and the consequences of not adhering to their requirements,as well as general construction processes and time involved in the construction.The Adjuster understands that skilled labor and licensing is required for specific trades such as roofing,electrical and plumbing so the valuation will accurately reflect the appropriate labor codes.The Adjuster also understands that the increase in the cost of the line item is justified due to the necessity for skilled labor and the increased costs in worker's compensation rates for workers involved in these trades. Incurred cost is a basic accounting principle and is defined as a cost that a company becomes liable for.If there is an agreement that the loss is covered by the contract,the insurer becomes liable for this loss as it is an incurred cost.The insured and an insurer have an insurance contract,not a construction contract.The insured incurred cost in the amount of our valuation when the loss occurred.We have met our obligations of the contract by fulfilling our duties after loss.Now the insurance must meet its duties of indemnity.r This is an addendum to our Initial proof of loss.The insured is in agreement with the demand.Our demand is reasonable and should be paid upon receipt.Failure to indemnify the client will be a breach of the insurance contract. Please adhere to the statutory timelines in regard to the handling of this claim. Sound Adjusters P.O.Box 3956 �Iy Silverdale,WA 98383 (360)447-8639 claiins@soundadjusters.com WADLEIGH_SUPPLEMENT Dwelling Roof Roof DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 1. R&R Tarp-all-purpose poly-per sq ft 600.00 SF 1.46 100.21 262.80 1,239.01 (0.00) 1,239.01 (labor and material) Total: Roof 100.21 262.80 1,239.01 0.00 1,239.01 Roof r,,A, 2011.73 Surface Area 20.12 Number of Squares 225.51 Total Perimeter Length 62.92 Total Ridge Length DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV ROOFING: 2. Remove Laminated-comp.shingle rfg.- 20.12 SQ 52.04 119.78 314.12 1,480.94 (0.00) 1,480.94 w/out felt 3. Laminated-comp.shingle rfg.-w/out 24.00 SQ 178.41 489.84 1,284.56 6,056.24 (0.00) 6,056.24 felt 4. Roofing felt-synthetic underlayment 20.12 SQ 32.94 75.82 198.82 937.39 (0.00) 937.39 5. Ice&water barrier 95.90 SF 1.39 15.25 40.00 188.55 (0.00) 188.55 6. R&R Drip edge 225.51 LF 2.16 55.72 146.14 688.96 (0.00) 688.96 7. Asphalt starter-universal starter course 225.51 LF 1.71 44.11 115.68 545.41 (0.00) 545.41 8. R&R Continuous ridge vent-shingle- 62.92LF 8.01 57.66 151.20 712.85 (0.00) 712.85 over style 9. R&R Ridge cap-composition shingles 62.92 LF 5.00 35.99 94.38 444.97 (0.00) 444.97 10. R&R Valley metal 31.97 LF 5.05 18.48 48.44 228.36 (0.00) 228.36 11. R&R Roof vent-turtle type-Metal 6.00 EA 54.21 37.21 97.58 460.05 (0.00) 460.05 12. R&R Flashing-pipe jack 3.00EA 39.84 13.67 35.86 169.05 (0.00) 169.05 13. R&R Exhaust cap-through roof-6" 2.00 EA 78.23 17.90 46.94 221.30 (0.00) 221.30 to 8" 14. Flashing,20"wide 24.00LF 3.44 9.45 24.76 116.77 (0.00) 116.77 15. Step flashing 8.00 LF 7.02 6.42 16.84 79.42 (0.00) 79.42 16. Chimney flashing-average(32"x 36") 1.00 EA 298.70 34.18 89.62 422.50 (0.00) 422.50 17. Remove Additional charge for high 20.12 SQ 4.82 11.09 29.10 137.17 (0.00) 137.17 roof(2 stories or greater) 18. Additional charge for high roof(2 20.12 SQ 13.84 31.85 83.54 393.85 (0.00) 393.85 stories or greater) SHILOH-DOWNER 2/27/2024 Page:2 e Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Roof DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV SHEATHING: 19. R&R Sheathing-radiant barrier-1/2"- 600.00 SF 3.93 269.75 707.40 3,335.15 (0.00) 3,335.15 OSB TRUSSES: 20. R&R Scissor truss-4/12 slope 126.00 LF 12.62 181.91 477.04 2,249.07 (0.00) 2,249.07 21. Crane and operator- 14 ton capacity- 6.00 HR 185.00 126.98 333.00 1,569.98 (0.00) 1,569.98 65'extension boom GUTTERS/DOWNSPOUTS: 22. R&R Gutter/downspout-aluminum- 154.33 LF 6.00 105.92 277.80 1,309.70 (0.00) 1,309.70 up to 5" 23. Gutter guard/screen 110.33 LF 3.81 48.09 126.10 594.55 (0.00) 594.55 Totals: Roof 1,807.07 4,738.92 22,342.23 0.00 22,342.23 Total: Roof 1,907.28 5,001.72 23,581.24 0.00 23,581.24 Total: Dwelling 1,907.28 5,001.72 23,581.24 0.00 23,581.24 Exterior Exterior Front Elev Formula Elevation 52'x 18'x 22' 1508.00 SF Walls 52.00 LF Floor Perimeter 1508.00 SF Long Wall 1508.00 SF Short Wall 68.12 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV SOFFIT,FASCIA,&GUTTERS: 24. R&R Soffit-wood 44.00 SF 7.46 37.56 98.46 464.26 (0.00) 464.26 25. R&R Fascia- 1"x 6"-#3 cedar 22.00 LF 8.79 22.13 58.02 273.53 (0.00) 273.53 SIDING&INSULATION: 26. R&R Siding-shiplap-cedar 96.00 SF 10.49 115.21 302.12 1,424.37 (0.00) 1,424.37 27. R&R House wrap(air/moisture barrier) 96.00 SF 0.45 4.94 12.96 61.10 (0.00) 61.10 28. R&R Batt insulation-6"-R21- 96.00 SF 2.18 23.94 62.78 296.00 (0.00) 296.00 unfaced batt DOORS,WINDOWS,&TRIM SHILOH_DOWNER 2/27/2024 Page:3 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Front Elev DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 29. R&R Vinyl window,horizontal 2.00 EA 434.25 99.36 260.54 1,228.40 (0.00) 1,228.40 sliding,12-23 sf 30. Additional charge for a retrofit 2.00 EA 161.25 36.89 96.76 456.15 (0.00) 456.15 window,12-23 sf 31. Add on for grid(double or triple 2.00 SF 5.22 1.20 3.14 14.78 (0.00) 14.78 glazed windows) 32. R&R Specialty wood window unit,12- 1.00EA 1,867.30 213.61 560.18 2,641.09 (0.00) 2,641.09 23 sf 33. Add.charge for a retrofit window, 12- 1.00 EA 289.13 33.07 86.74 408.94 (0.00) 408.94 23 sf-difficult PAINT: 34. Clean with pressure/chemical spray 1,508.00 SF 0.46 79.35 208.10 981.13 (0.00) 991.13 35. Mask and prep for paint-paper and 68.12 LF 1.03 8.02 21.04 99.22 (0.00) 99.22 tape(per LF) 36. Exterior-paint two coats 1,508.00 SF 1.53 263.95 692.18 3,263.37 (0.00) 3,263.37 37. Prime&paint exterior soffit-wood 44.00 SF 2.85 14.35 37.62 177.37 (0.00) 177.37 38. Prime&paint exterior fascia-wood, 22.00 LF 2.71 6.83 17.88 84.33 (0.00) 84.33 6"-8"wide 39. Two ladders with jacks and plank(per 2.00DA 130.33 29.82 78.20 368.68 (0.00) 368.68 day) 40. Scaffolding Setup&Take down-per 4.00 HR 55.36 25.34 66.44 313.22 (0.00) 313.22 hour Totals: Front Elev 1,015.57 2,663.16 12,555.94 0.00 12,555.94 Front Deck LxWxH 12'x 8'x 0" 96.00 SF Walls&Ceiling 96.00 SF Ceiling 10.67 SY Flooring 96.00 SF Floor 40.00 LF Ceil.Perimeter 40.00 LF Floor Perimeter DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 41. R&R Trim board-V x 8"-installed 40.00 LF 10.41 47.64 124.92 588.96 (0.00) 588.96 (cedar) 42. R&R 2"x 4"cedar-deck grade(.667 96.00LF 7.07 77.65 203.62 959.99 (0.00) 959.99 BF per LF) 43. R&R Deck guard rail-cedar 18.00 LF 79.90 164.53 431.46 2,034.19 (0.00) 2,034.19 44. Paint deck-2 coats paint 96.00 SF 1.84 20.20 53.00 249.84 (0.00) 249.84 SHTWH_DOWNER 2/27/2024 Page:4 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Front Deck DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 45. Paint deck handrail-2 coats paint 18.00 LF 12.45 25.64 67.24 316.98 (0.00) 316.98 Totals: Front Deck 335.66 880.24 4,149.% 0.00 4,149.96 Right Elev Formula Elevation 60'x 18'x 18' 1620.00 SF Walls 60.00 LF Floor Perimeter 1620.00 SF Long Wall 1620.00 SF Short Wall 69.97 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV PAINT: 46. Clean with pressure/chemical spray 1,620.00 SF 0.46 85.25 223.56 1,054.01 (0.00) 1,054.01 47. Mask and prep for paint-paper and 69.97 LF 1.03 8.24 21.62 101.93 (0.00) 101.93 tape(per LF) 48. Exterior-paint two coats 1,620.00 SF 1.53 283.56 743.58 3,505.74 (0.00) 3,505.74 49. Two ladders with jacks and plank(per 2.00 DA 130.33 29.82 78.20 368.68 (0.00) 368.68 day) 50. Scaffolding Setup&Take down-per 4.00 HR 55.36 25.34 66.44 313.22 (0.00) 313.22 hour Totals: Right Elev 432.21 1,133.40 5,343.58 0.00 5,343.58 Rear Elev Formula Elevation 52'x 18'x 22' 1508.00 SF Walls 52.00 LF Floor Perimeter 1508.00 SF Long Wall 1508.00 SF Short Wall 68.12 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV SOFFIT,FASCIA,&GUTTERS: 51. R&R Soffit-wood 100.00 SF 7.46 85.35 223.80 1,055.15 (0.00) 1,055.15 SHILOH_DOWNER 2/27/2024 Page:5 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Rear Elev DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 52. R&R Fascia-1"x 6"-#3 cedar 50.00 LF 8.79 50,28 131.86 621.64 (0.00) 621.64 SIDING&INSULATION: 53. R&R Siding-shiplap-cedar 96.00 SF 10.49 115.21 302.12 1,424.37 (0.00) 1,424.37 54. R&R House wrap(air/moisture barrier) 96.00 SF 0.45 4.94 12.96 61.10 (0.00) 61.10 55. R&R Batt insulation-6"-R21- 96.00 SF 2.18 23.94 62.78 296.00 (0.00) 296.00 unfaced batt DOORS,WINDOWS,&TRIM 56. R&R Vinyl window,horizontal 2.00 EA 434.25 99.36 260.54 1,228.40 (0.00) 1,228.40 sliding,12-23 sf 57. Additional charge for a retrofit 2.00 EA 161.25 36.89 96.76 456.15 (0.00) 456.15 window, 12-23 sf 58. Add on for grid(double or triple 2.00 SF 5.22 1.20 3.14 14.78 (0.00) 14.78 glazed windows) 59. R&R 6-0 6-8 vinyl sliding patio door 1.00 EA 1,126.56 128.89 337.98 1,593.43 (0.00) 1,593.43 PAINT: 60. Clean with pressure/chemical spray 1,508.00 SF 0.46 79.35 208.10 981.13 (0.00) 981.13 61. Mask and prep for paint-paper and 68.12 LF 1.03 8.02 21.04 99.22 (0.00) 99.22 tape(per LF) 62. Exterior-paint two coats 1,508.00 SF 1.53 263.95 692.18 3,263.37 (0.00) 3,263.37 63. Prime&paint exterior soffit-wood 100.00 SF 2.85 32.60 85.50 403.10 (0.00) 403.10 64. Prime&paint exterior fascia-wood, 50.00 LF 2.71 15.50 40.66 191.66 (0.00) 191.66 6"-8"wide 65. Two ladders with jacks and plank(per 2.00 DA 130.33 29.82 78.20 368.68 (0.00) 368.68 day) 66. Scaffolding Setup&Take down-per 4.00 HR 55.36 25.34 66.44 313.22 (0.00) 313.22 hour Totals: Rear Elev 1,000.64 2,624.06 12,371.40 0.00 12,371.40 Left Elev Formula Elevation 60'x 18'x 18' 1620.00 SF Walls 60.00 LF Floor Perimeter 1620.00 SF Long Wall 1620.00 SF Short Wall 69.97 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV SOFFIT,FASCIA,&GUTTERS: SHILOH_DOWNER 2/27/2024 Page:6 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Left Elev DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 67. R&R Soffit-wood 64.00 SF 7.46 54.63 143.22 675.29 (0.00) 675.29 68. R&R Fascia- 1"x 6"-#3 cedar 32.00 LF 8.79 32.19 84.38 397.85 (0.00) 397.85 PAINT: 69. Clean with pressure/chemical spray 1,620.00 SF 0.46 85.25 223.56 1,054.01 (0.00) 1,054.01 70. Mask and prep for paint-paper and 69.97 LF 1.03 8.24 21.62 101.93 (0.00) 101.93 tape(per LF) 71. Exterior-paint two coats 1,620.00 SF 1.53 283.56 743.58 3,505.74 (0.00) 3,505.74 72. Prime&paint exterior soffit-wood 64.00 SF 2.85 20.87 54.72 257.99 (0.00) 257.99 73. Prime&paint exterior fascia-wood, 32.00 LF 2.71 9.92 26.02 122.66 (0.00) 122.66 6"-8"wide 74. Two ladders with jacks and plank(per 2.00 DA 130.33 29.82 78.20 368.68 (0.00) 368.68 day) 75. Scaffolding Setup&Take down-per 4.00 HR 55.36 25.34 66.44 313.22 (0.00) 313.22 hour Totals: Left Elev 549.82 1,441.74 6,797.37 0.00 6,797.37 Total: Exterior 3,333.90 8,742.60 41,218.25 0.00 41,218.25 Total: Exterior 3,333.90 8,742.60 41,218.25 0.00 41,218.25 Interior Attic DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 76. Remove Blown-in insulation- 900.00 SF 2.38 245.05 642.60 3,029.65 (0.00) 3,029.65 Machine removal Totals: Attic 245.05 642.60 3,029.65 0.00 3,029.65 Upstairs SHILOH_DOWNER 2/27/2024 Page:7 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com °Ve is Living Room Height:Peaked t 306.70 SF Walls 232.38 SF Ceiling a^43 s 539.08 SF Walls&Ceiling 234.58 SF Floor a.iving Room � Hed26.06 SY Flooring 36.80 LF Floor Perimeter s 'r 47.73 LF Ceil.Perimeter V 13-4"1 1-3•'1 Window 3' 11 1/2"X 5'1/4" Opens into Exterior Window 3'115/16"X 4' 11 13/16" Opens into Exterior Missing Wall 6 3/4"X 8' Opens into LIVING_ROOM2 Missing Wall 8'9 13/16"X 8' Opens into Exterior Missing Wall 3'81/4"X 8' Opens into Exterior Missing Wall 615/16"X 8' Opens into LIVING_ROOM2 Missing Wall 3'5 3/16"X 8' Opens into Exterior Missing Wall-Goes to Floor 3'1"X 8' Opens into HALLWAY Missing Wall 8'91/16"X 8' Opens into DINING_KITCH Subroom: Living Room Closet 1(2) Height:9'9" 120.12 SF Walls 13.00 SF Ceiling 5' Cl 133.12 SF Walls&Ceiling 13.00 SF Floor A Living Room Closet 1 (2'Li g�ow -5'1"- 1 1.44 SY Flooring 10.67 LF Floor Perimeter 6" 5" 15.72 LF Ceil.Perimeter Door 5'5/8"X 6'6 3/4" Opens into LIVING_ROOM2 Cabil4 15) i13 '5" r Subroom: Living Room Closet 2(1) Height:9'9" 3'3" - - 91.36 SF Walls 7.74 SF Ceiling g Room C1osd > 99.10 SF Walls&Ceiling 7.74 SF Floor 8„ 0.86 SY Flooring 8.64 LF Floor Perimeter 5" 0" 11.28 LF Ceil.Perimeter Door 2'7 5/8"X 7'5/8" Opens into LIVING_ROOM2 DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: 77. R&R Batt insulation- 12"-R38- 253.13 SF 2.88 83.40 218.70 1,031.11 (0.00) 1,031.11 unfaced batt 78. R&R Two coat plaster(no lath) 253.13 SF 9.38 271.63 712.30 3,358.29 (0.00) 3,358.29 79. Texture drywall-machine- 253.13 SF 1.14 33.01 86.58 408.16 (0.00) 408.16 knockdown 80. R&R Stud wall-2"x 4"x 8'- 16"oc 12.00 LF 24.71 33.92 88.96 419AO (0.00) 419.40 SHILOH_DOWNER 2/27/2024 Page: 8 Sound Adjusters P.O.Box 3956 €: Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Living Room DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 81. R&R Batt insulation-4"-R13- 518.18 SF 1.43 84.78 222.30 1,048.08 (0.00) 1,048.08 unfaced bait 82. R&R 1/2"drywall-hung,taped, 518.18 SF 3.63 215.19 564.28 2,660.46 (0.00) 2,660.46 floated,ready for paint 83. Texture drywall-light hand texture 518.18 SF 1.19 70.54 184.98 872.15 (0.00) 872.15 LIGHTS,FIXTURES&ELECTRICAL: 84. Light fixture 2.00 EA 90.04 20.61 54.02 254.71 (0.00) 254.71 85. Combination CO/Smoke detector 1.00 EA 120.34 13.77 36.10 170.21 (0.00) 170.21 86. Thermostat 1.00 EA 130.44 14.92 39.14 184.50 (0.00) 184.50 87. Heat/AC register-Mechanically 1.00 EA 33.28 3.81 9.98 47.07 (0.00) 47.07 attached 88. Outlet or switch cover 8.00 EA 4.42 4.04 10.60 50.00 (0.00) 50.00 FLOORING: 89. Remove Carpet 255.33 SF 0.37 10.80 28.34 133.61 (0.00) 133.61 90. Carpet 293.63 SF 4.12 138.40 362.92 1,711.08 (0.00) 1,711.08 15%waste added for Carpet. 91. Carpet pad 255.33 SF 0.75 21.91 57.46 270.87 (0.00) 270.87 92. Additional charge for screwing down 255.33 SF 0.91 26.59 69.70 328.64 (0.00) 328.64 underlayment/subfloor 93. R&R Baseboard-2 1/4"stain grade 56.11 LF 4.66 29.91 78.44 369.82 (0.00) 369.82 PAINT: 94. Floor protection-self-adhesive plastic 255.33 SF 0.78 22.79 59.74 281.69 (0.00) 281.69 film 95. Mask and prep for paint-plastic, 74.73 LF 1.72 14.70 38.56 181.80 (0.00) 181.80 paper,tape(per LF) 96. Seal/prime(1 coat)then paint(1 coat) 771.31 SF 1.22 107.65 282.30 1,330.95 (0.00) 1,330.95 the walls and ceiling 97. Seal&paint door slab only(per side) 1.00 EA 49.19 5.63 14.76 69.58 (0.00) 69.58 98. Seal&paint door/window trim&jamb 1.00 EA 40.56 4.64 12.16 57.36 (0.00) 57.36 -(per side) 99. Seal(1 coat)&paint(1 coat)casing 17.00LF 1.94 3.77 9.90 46.65 (0.00) 46.65 100. Seal(1 coat)&paint(1 coat)trim 56.11 LF 1.83 11.75 30.80 145.23 (0.00) 145.23 101. Seal(1 coat)&paint(1 coat) 56.11 LF 1.93 12.39 32.48 153.16 (0.00) 153.16 baseboard 102. Final cleaning-construction- 255.33 SF 0.36 10.52 27.58 130.02 (0.00) 130.02 Residential Totals: Living Room 1,271.07 3,333.08 15,714.60 0.00 15,714.60 SHILOH_DOWNER 2/27/2024 Page:9 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com Dining/Kitchen Height:Sloped T UPPet Z. L.ii.Din , 404.80 SF Walls 200.17 SF Ceiling ing/Kitchetl7PPer 604.98 SF Walls&Ceiling 198.34 SF Floor e 22.04 SY Flooring 46.65 LF Floor Perimeter 1 a 52.80 LF Ceil.Perimeter Door 5' 11 1/8"X 6'811/16" Opens into Exterior Window 3' 1/2"X 3'1" Opens into Exterior Missing Wall 8'91/16"X 8' Opens into LIVING_ROOM2 DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: 103. R&R Batt insulation- 12"-R38- 200.17 SF 2.88 65.95 172.94 815.38 (0.00) 815.38 unfaced batt 104. R&R Two coat plaster(no lath) 200.17 SF 9.38 214.80 563.28 ' 2,655.68 (0.00) 2,655.68 105. Texture drywall-machine- 200.17 SF 1.14 26.10 68.46 322.75 (0.00) 322.75 knockdown 106. R&R Stud wall-2"x 4"x 8'- 16"oc 12.00 LF 24.71 33.92 88.96 419.40 (0.00) 419.40 107. R&R Batt insulation-4"-R13- 404.80 SF 1.43 66.22 173.66 818.74 (0.00) 818.74 unfaced batt 108. R&R 1/2"drywall-hung,taped, 404.80 SF 3.63 168.10 440.82 2,078.35 (0.00) 2,078.35 floated,ready for paint 109. Texture drywall-light hand texture 404.80 SF 1.19 55.11 144.52 681.34 (0.00) 681.34 LIGHTS,FIXTURES&ELECTRICAL: 110. Light fixture 1.00 EA 90.04 10.30 27.02 127.36 (0.00) 127.36 111. Combination CO/Smoke detector 1.00 EA 120.34 13.77 36.10 170.21 (0.00) 170.21 112. Heat/AC register-Mechanically 1.00 EA 33.28 3.81 9.98 47.07 (0.00) 47.07 attached 113. Outlet or switch cover 2.00 EA 4.42 1.01 2.66 12.51 (0.00) 12.51 KITCHEN CABINETRY&FIXTURES: 114. Cabinetry-upper(wall)units 0.00 LF 168.98 0.00 0.00 0.00 (0.00) 0.00 115. Cabinetry-lower(base)units 0.00 LF 244.44 0.00 0.00 0.00 (0.00) 0.00 116. Cabinet panels-side,end,or back 0.00 SF 17.10 0.00 0.00 0.00 (0.00) 0.00 117. Toe kick-pre-finished wood-1/2" 0.00 LF 10.15 0.00 0.00 0.00 (0.00) 0.00 118. Cabinet knob or pull 0.00 EA 9.32 0.00 0.00 0.00 (0.00) 0.00 119. Countertop-flat laid plastic laminate 0.00 LF 44.98 0.00 0.00 0.00 (0.00) 0.00 120. Countertop edge treatment-laminate 0.00 LF 5.78 0.00 0.00 0.00 (0.00) 0.00 121. 4"backsplash for flat laid countertop 0.00 LF 8.98 0.00 0.00 0.00 (0.00) 0.00 122. Sink-double basin 0.00 EA 430.39 0.00 0.00 0.00 (0.00) 0.00 123. Sink faucet-Kitchen 0.00 EA 296.85 0.00 0.00 0.00 (0.00) 0.00 124. Sink drain assembly with stop 0.00 EA 57.95 0.00 0.00 0.00 (0.00) 0.00 125. P-trap assembly-ABS(plastic) 0.00 EA 79.73 0.00 0.00 0.00 (0.00) 0.00 126. Garbage disposal/disposer 0.00 EA 286.99 0.00 0.00 0.00 (0.00) 0.00 127. Dishwasher 0.00 EA 704.67 0.00 0.00 0.00 (0.00) 0.00 SHILOH_DOWNER 2/27/2024 Page: 10 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Dining/Kitchen DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 128. Appliance water line-1/4" O.00EA 82.94 0.00 0.00 0.00 (0.00) 0.00 129. Install Range-drop in 0.00 EA 160.53 0.00 0.00 0.00 (0.00) 0.00 130. Install Microwave oven-over range 0.00 EA 173.91 0.00 0.00 0.00 (0.00) 0.00 w/built-in hood 131. Install Refrigerator-side by side-16 0.00 EA 32.09 0.00 0.00 0.00 (0.00) 0.00 to 22 cf FLOORING: 132. Clean floor-tile 198.34 SF 0.84 19.06 49.98 235.65 (0.00) 235.65 133. R&R Baseboard-2 1/4"stain grade 46.65 LF 4.66 24.87 65.22 307.48 (0.00) 307.48 PAINT: 134. Floor protection-self-adhesive 198.34 SF 0.78 17.69 46.42 218.82 (0.00) 218.92 plastic film 135. Mask and prep for paint-plastic, 52.80 LF 1.72 10.39 27.24 128.45 (0.00) 128.45 paper,tape(per LF) 136. Seal/prime(1 coat)then paint(1 coat) 604.98 SF 1.22 84.44 221.42 1,043.94 (0.00) 1,043.94 the walls and ceiling 137. Seal(1 coat)&paint(1 coat) 46.65 LF 1.93 10.30 27.00 127.33 (0.00) 127.33 baseboard 138. Final cleaning-construction- 198.34 SF 0.36 8.16 21.42 100.98 (0.00) 100.98 Residential Totals: Dining/Kitchen 834.00 2,187.10 10,311.44 0.00 10,311A4 Pol Stith Tub a v% Bathroom Height:8' b, 5, 0 157.14 SF Walls 40.24 SF Ceiling Bathroom 197.39 SF Walls&Ceiling 40.24 SF Floor CIO 4.47 SY Flooring 19.36 LF Floor Perimeter 20.94 LF Ceil.Perimeter Hellw Door 1' 7"X 6' 6 3/4" Opens into HALLWAY SHILOH_DOWNER 2/27/2024 Page: 11 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com Subroom: Bath Tub(1) Height:8' =6) 85.11 SF Walls 13.69 SF Ceiling 98.80 SF Walls&Ceiling 13.69 SF Floor 1.52 SY Flooring 10.64 LF Floor Perimeter ' 10.64 LF Ceil.Perimeter inR Missing Wall 5' 15/16"X 8' Opens into BATHROOMI DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: 139. R&R Batt insulation-12"-R38- 53.94 SF 2.88 17.77 46.60 219.72 (0.00) 219.72 unfaced batt 140. R&R Two coat plaster(no lath) 53.94 SF 9.38 57.88 151.78 715.62 (0.00) 715.62 141. Texture drywall-machine- 53.94 SF 1.14 7.03 18.44 86.96 (0.00) 86.96 knockdown 142. R&R Stud wall-2"x 4"x 8'-16"oc 12.00 LF 24.71 33.92 88.96 419.40 (0.00) 419.40 143. R&R 1/2"drywall-hung,taped, 242.25 SF 3.63 100.60 263.80 1,243.77 (0.00) 1,243.77 floated,ready for paint 144. R&R Batt insulation-4"-R13- 242.25 SF 1.43 39.63 103.92 489.97 (0.00) 489.97 unfaced batt 145. Texture drywall-light hand texture 242.25 SF 1.19 32.98 86.48 407.74 (0.00) 407.74 LIGHTS,FIXTURES&ELECTRICAL: 146. Bathroom ventilation fan w/light 1.00 EA 196.31 22.46 58.90 277.67 (0.00) 277.67 147. Light fixture 1.00 EA 90.04 10.30 27.02 127.36 (0.00) 127.36 148. Detach&Reset Light bar-3 lights 1.00 EA 80.26 9.18 24.08 113.52 (0.00) 113.52 149. Ground fault interrupter(GFI)outlet 2.00 EA 41.47 9.49 24.88 117.31 (0.00) 117.31 150. Outlet 2.00 EA 23.00 5.27 13.80 65.07 (0.00) 65.07 151. Switch 2.00 EA 23.80 5.45 14.28 67.33 (0.00) 67.33 152. Outlet or switch cover 6.00 EA 4.42 3.03 7.96 37.51 (0.00) 37.51 SHOWER/T'UB&SURROUND 153. R&R Waterproof panel shower 1.00 EA 538.45 61.60 161.54 761.59 (0.00) 761.59 surround w/trim-up to 98 SF 154. Shower faucet 1.00 EA 266.54 30.50 79.96 377.00 (0.00) 377.00 155. R&R Bathtub 1.00EA 1,164.51 133.21 349.34 1,647.06 (0.00) 1,647.06 156. Tub/shower faucet 1.00 EA 355.58 40.68 106.68 502.94 (0.00) 502.94 157. R&R Shower door 1.00 EA 625.21 71.52 187.56 884.29 (0.00) 884.29 158. Towel ring 1.00 EA 34.70 3.97 10.42 49.09 (0.00) 49.09 CABINETRY&FIXTURES: 159. R&R Vanity 3.50LF 247.43 99.07 259.80 1,224.88 (0.00) 1,224.88 160. Sink-single 1.00 EA 307.04 35.13 92.12 434.29 (0.00) 434.29 161. Sink faucet-Bathroom 1.00 EA 250.85 28.69 75.26 354.80 (0.00) 354.80 162. Sink drain assembly with stop 1.00 EA 57.95 6.63 17.38 81.96 (0.00) 81.96 163. P-trap assembly-ABS(plastic) 1.00 EA 79.73 9.13 23.92 112.78 (0.00) 112.78 164. Detach&Reset Mirror-1/4"plate 16.00 SF 8.33 15.25 39.98 188.51 (0.00) 188.51 glass SHILOH_DOWNER 2/27/2024 Page: 12 tSound Adjusters I P.O.Box 3956 Silverdale,WA 98383 f (360)447-8639 claims@soundadjusters.com CONTINUED-Bathroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 165. Toilet 1.00 EA 601.56 68.82 180.46 850.84 (0.00) 850.84 166. Toilet seat 1.00 EA 62.98 7.20 18.90 89.08 (0.00) 89.08 167. Plumbing fixture supply line 1.00 EA 25.07 2.87 7.52 35.46 (0.00) 35.46 168. Toilet paper holder 1.00 EA 30.42 3.48 9.12 43.02 (0.00) 43.02 DOORS,WINDOWS&TRIM: 169. R&R Interior door-Colonist-stain 1.00 EA 394.26 45.10 118.28 557.64 (0.00) 557.64 grade jamb&casing 170. Door knob-interior 1.00 EA 48.48 5.55 14.54 68.57 (0.00) 68.57 171. R&R Casing-2 1/4"stain grade 17.00 LF 4.06 7.91 20.72 97.65 (0.00) 97.65 172. R&R Baseboard-2 1/4"stain grade 30.00 LF 4.66 15.99 41.96 197.75 (0.00) 197.75 FLOORING: 173. Remove Vinyl floor covering(sheet 53.94 SF 1.27 7.84 20.56 96.90 (0.00) 96.90 goods) 174. Vinyl floor covering(sheet goods) 59.33 SF 4.27 28.98 76.00 358.32 (0.00) 358.32 175. Underlayment-3/8"BC plywood 53.94 SF 3.58 22.09 57.94 273.14 (0.00) 273.14 176. Additional charge for screwing down 53.94 SF 0.91 5.62 14.72 69.43 (0.00) 69.43 underlayment/subfloor 177. Floor preparation for resilient flooring 53.94 SF 0.90 5.55 14.56 68.66 (0.00) 68.66 178. R&R Vinyl-metal transition strip 3.00 LF 4.86 1.66 4.36 20.60 (0.00) 20.60 PAINT: 179. Floor protection-self-adhesive 53.94 SF 0.78 4.81 12.62 59.50 (0.00) 59.50 plastic film 180. Mask and prep for paint-plastic, 31.58 LF 1.72 6.21 16.30 76.83 (0.00) 76.83 paper,tape(per LF) 181. Seal/prime(1 coat)then paint(1 coat) 296.19 SF 1.22 41.34 108.40 511.09 (0.00) 511.09 the walls and ceiling 182. Seal(1 coat)&paint(1 coat)casing 17.00LF 1.94 3.77 9.90 46.65 (0.00) 46.65 183. Seal(1 coat)&paint(1 coat) 30.00 LF 1.93 6.63 17.38 81.91 (0.00) 81.91 baseboard 184. Final cleaning-construction- 53.94 SF 0.36 2.22 5.82 27.46 (0.00) 27.46 Residential Totals: Bathroom 1,184.01 3,104.92 14,638.64 0.00 14,638.64 SHILOH_DOWNER 2/27/2024 Page: 13 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claiins@soundadjusters.com Hallway Height:8' Bathroom - ► 135.14 SF Walls 34.28 SF Ceiling ►2'4'*2'8-1" 1-2" - 169.43 SF Walls&Ceiling 34.28 SF Floor HaUway --'-#-2'V '' 3.81 SY Flooring 15.57 LF Floor Perimeter 3 2'3" N 28.23 LF Ceil.Perimeter Door 2'7 5/8"X 6' 1011/16" Opens into MASTER_BEDRO Door 2'7 7/16"X 7'17/16" Opens into BEDROOM-3 Door 2'813/16"X 6' 1011/16" Opens into BEDROOM_4 Missing Wall-Goes to Floor 3' 1"X 8' Opens into LIVING_ROOM2 Door 1'7"X 6'6 3/4" Opens into BATHROOM1 DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: 185. R&R Batt insulation-12"-R38- 34.28 SF 2.88 11.30 29.62 139.64 (0.00) 139.64 unfaced batt 186. R&R Two coat plaster(no lath) 34.28 SF 9.38 36.79 96.46 454.79 (0.00) 454.79 187. Texture drywall-machine- 34.28 SF 1.14 4.47 11.72 55.27 (0.00) 55.27 knockdown 188. R&R Stud wall-2"x 4"x 8'-16"oc 12.00 LF 24.71 33.92 88.96 419.40 (0.00) 419.40 189. R&R Batt insulation-4"-R13- 135.14 SF 1.43 22.10 57.98 273.33 (0.00) 273.33 unfaced batt 190. R&R 1/2"drywall-hung,taped, 135.14 SF 3.63 56.12 147.16 693.84 (0.00) 693.84 floated,ready for paint 191. Texture drywall-light hand texture 135.14 SF 1.19 18.40 48.24 227.46 (0.00) 227.46 LIGHTS,FIXTURES&ELECTRICAL: 192. Light fixture 2.00 EA 90.04 20.61 54.02 254.71 (0.00) 254.71 193. Combination CO/Smoke detector 1.00 EA 120.34 13.77 36.10 170.21 (0.00) 170.21 194. Outlet or switch cover 4.00 EA 4.42 2.03 5.30 25.01 (0.00) 25.01 195. Thermostat 1.00 EA 130.44 14.92 39.14 184.50 (0.00) 184.50 196. Heat/AC register-Mechanically 1.00 EA 33.28 3.81 9.98 47.07 (0.00) 47.07 attached DOORS,WINDOWS&TRIM: 197. Interior door-Colonist-stain grade 1.00 EA 368.57 42.16 110.58 521.31 (0.00) 521.31 jamb&casing 198. Door knob-interior 1.00 EA 48.48 5.55 14.54 68.57 (0.00) 68.57 199. R&R Casing-2 1/4"stain grade 21.00 LF 4.06 9.75 25.58 120.59 (0.00) 120.59 200. R&R Baseboard-2 1/4"stain grade 15.57 LF 4.66 8.29 21.76 102.60 (0.00) 102.60 FLOORING: 201. Remove Carpet 34.28 SF 0.37 1.46 3.80 17.94 (0.00) 17.94 202. Carpet 39.43 SF 4.12 18.59 48.74 229.78 (0.00) 229.78 15%waste added for Carpet. 203. Carpet pad 34.28 SF 0.75 2.94 7.72 36.37 (0.00) 36.37 204. Additional charge for screwing down 34.28 SF 0.91 3.56 9.36 44.11 (0.00) 44.11 underlayment/subfloor SHILOH_DOWNER 2/27/2024 Page: 14 Sound Adjusters S P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Hallway DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV PAINT: 205. Floor protection-self-adhesive 34.28 SF 0.78 3.06 8.02 37.82 (0.00) 37.82 plastic film 206. Mask and prep for paint-plastic, 28.23 LF 1.72 5.55 14.56 68.67 (0.00) 68.67 paper,tape(per LF) 207. Seal/prime(1 coat)then paint(1 coat) 169.43 SF 1.22 23.65 62.02 292.37 (0.00) 292.37 the walls and ceiling 208. Seal&paint door slab only(per side) 1.00 EA 49.19 5.63 14.76 69.58 (0.00) 69.58 209. Seal(1 coat)&paint(1 coat)casing 21.00 LF 1.94 4.67 12.22 57.63 (0.00) 57.63 210. Seal(1 coat)&paint(1 coat) 15.57 LF 1.93 3.43 9.02 42.50 (0.00) 42.50 baseboard 211. Final cleaning-construction- 34.28 SF 0.36 1.42 3.70 17.46 (0.00) 17.46 Residential Totals: Hallway 377.95 991.06 4,672.53 0.00 4,67253 t1lalyBedroom 1 Height: 8' 9"3 r238.06 SF Walls 87.60 SF Ceiling dr_ 1325.67 SF Walls&Ceiling 87.60 SF Floor T 9.73 SY Flooring 30.67 LF Floor Perimeter Z< 37.65 LF Ceil.Perimeter ►2'8-'+ IT 1"I Window 4' 1 15/16"X 3'61/2" Opens into Exterior Door 2'813/16"X 6' 1011/16" Opens into HALLWAY '-''5 r Subroom: Bedroom 1 Closet(1) Height:8' 1. 1 94.01 SF Walls 12.30 SF Ceiling 106.31 SF Walls&Ceiling 12.30 SF Floor B *1 OR cly 1.37 SY Flooring 11.20 LF Floor Perimeter T 1 15.44 LF Ceil.Perimeter Door 4'3"X 6'117/16" Opens into BEDROOM-4 DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: SHILOH_DOWNER 2/27/2024 Page: 15 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Bedroom 1 DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 212. R&R Batt insulation-12"-R38- 32.00 SF 2.88 10.55 27.64 130.35 (0.00) 130.35 unfaced batt 213. R&R Two coat plaster(no lath) 32.00 SF 9.38 34.34 90.06 424.56 (0.00) 424.56 214. Texture drywall-machine- 32.00 SF 1.14 4.17 10.94 51.59 (0.00) 51.59 knockdown 215. R&R Batt insulation-4"-R 13- 64.00 SF 1.43 10.48 27.46 129.46 (0.00) 129.46 unfaced batt 216. R&R 1/2"drywall-hung,taped, 64.00 SF 3.63 26.57 69.70 328.59 (0.00) 328.59 floated,ready for paint 217. Texture drywall-light hand texture 64.00 SF 1.19 8.71 22.84 107.71 (0.00) 107.71 LIGHTS,FIXTURES&ELECTRICAL: 218. Light fixture 1.00 EA 90.04 10.30 27.02 127.36 (0.00) 127.36 219. Heat/AC register-Mechanically 1.00 EA 33.28 3.81 9.98 47.07 (0.00) 47.07 attached DOORS,WINDOWS&TRIM: 220. Interior door-Colonist-stain grade 1.00 EA 368.57 42.16 110.58 521.31 (0.00) 521.31 jamb&casing 221. Door knob-interior 1.00 EA 48.48 5.55 14.54 68.57 (0.00) 68.57 222. R&R Casing-2 1/4"stain grade 38.00 LF 4.06 17.65 46.28 218.21 (0.00) 218.21 223. R&R Baseboard-2 1/4"stain grade 41.86 LF 4.66 22.32 58.52 275.91 (0.00) 275.91 FLOORING: 224. Remove Carpet 99.90 SF 0.37 4.23 11.08 52.27 (0.00) 52.27 225. Carpet 114.88 SF 4.12 54.15 142.00 669.46 (0.00) 669.46 15%waste added for Carpet. 226. Carpet pad 99.90 SF 0.75 8.57 22.48 105.98 (0.00) 105.98 227. Additional charge for screwing down 99.90 SF 0.91 10.40 27.28 128.59 (0.00) 128.59 underlayment/subfloor PAINT: 228. Floor protection-self-adhesive 99.90 SF 0.78 8.92 23.38 110.22 (0.00) 110.22 plastic film 229. Mask and prep for paint-plastic, 53.09 LF 1.72 10.45 27.40 129.16 (0.00) 129.16 paper,tape(per LF) 230. Seal/prime(1 coat)then paint(1 coat) 431.97 SF 1.22 60.29 158.10 745.39 (0.00) 745.39 the walls and ceiling 231. Seal(1 coat)&paint(1 coat)casing 38.00LF 1.94 8.44 22.12 104.28 (0.00) 104.28 232. Seal(1 coat)&paint(1 coat) 41.86LF 1.93 9.24 24.24 114.27 (0.00) 114.27 baseboard 233. Final cleaning-construction- 99.90 SF 0.36 4.11 10.78 50.85 (0.00) 50.85 Residential Totals: Bedroom 1 375.41 984A2 4,641.16 0.00 4,641.16 SHILOH_DOWNER 2/27/2024 Page: 16 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 all i (360)447-8639 claims@soundadjusters.com EBedroom 2 Height:8' 315.12 SF Walls 134.66 SF Ceiling 449.78 SF Walls&Ceiling 134.66 SF Floor 14.96 SY Flooring 40.32 LF Floor Perimeter 47.15 LF Ceil.Perimeter 2'10" Door 2'7 7/16"X 7'17/16" Opens into HALLWAY Window 4' 13/8"X 3'5 3/4" Opens into Exterior Subroom: Bedroom 2 Closet(1) Height:8' tN 80.35 SF Walls 10.32 SF Ceiling - t 90.68 SF Walls&Ceiling 10.32 SF Floor R4 , ' llv 1.15 SY Flooring 9.48 LF Floor Perimeter LA13.69 LF Ceil.Perimeter ~2'7"--f Missing Wall-Goes to Floor 4'21/2"X 6' 11 1/16" Opens into BEDROOM-3 DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV FLOORING: 234. Remove Carpet 144.98 SF 0.37 6.14 16.10 75.88 (0.00) 75.88 235. Carpet 166.73 SF 4.12 78.59 206.08 971.60 (0.00) 971.60 15%waste added for Carpet. 236. Carpet pad 144.98 SF 0.75 12.44 32.62 153.80 (0.00) 153.80 237. Final cleaning-construction- 144.98 SF 0.36 5.97 15.66 73.82 (0.00) 73.82 Residential Totals: Bedroom 2 103.14 270.46 1,275.10 0.00 1,275.10 1-. " 1,--" ,..1 t 5'6" --� f"4'6" T Master Bedroom Height:8 t 324.30 SF Walls 172.57 SF Ceiling Mader Bedroom I�I 496.87 SF Walls&Ceiling 172.57 SF Floor T t 19.17 SY Flooring 43.38 LF Floor Perimeter 3) 52.68 LF Ceil.Perimeter Hallwa s., y Door 2'7 5/8"X 6' 1011/16" Opens into HALLWAY Window 3' 119/16"X 3' 10 7/16" Opens into Exterior Window 4' 1 1/16"X 4'2" Opens into Exterior Door 2'51/16"X 7'5/8" Opens into MASTER_BATHR SHILOH_DOWNER 2/27/2024 Page: 17 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 t (360)447-8639 claims@soundadjusters.com c Subroom: Void(1) Height: 8' 2'4° 86.71 SF Walls 11.54 SF Ceiling 98.25 SF Walls&Ceiling 11.54 SF Floor 1.28 SY Flooring 10.28 LF Floor Perimeter 14.53 LF Ceil.Perimeter Door 4'3 X 6' 117/16" Opens into MASTER_BEDRO DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: 238. R&R Batt insulation-12"-R38- 32.00 SF 2.88 10.55 27.64 130.35 (0.00) 130.35 unfaced batt 239. R&R Two coat plaster(no lath) 32.00 SF 9.38 34.34 90.06 424.56 (0.00) 424.56 240. Texture drywall-machine- 32.00 SF 1.14 4.17 10.94 51.59 (0.00) 51.59 knockdown 241. R&R Batt insulation-4"-R13- 64.00 SF 1.43 10.48 27.46 129.46 (0.00) 129.46 unfaced batt 242. R&R 1/2"drywall-hung,taped, 64.00 SF 3.63 26.57 69.70 328.59 (0.00) 328.59 floated,ready for paint 243. Texture drywall-light hand texture 64.00 SF 1.19 8.71 22.84 107.71 (0.00) 107.71 LIGHTS,FIXTURES&ELECTRICAL: 244. Light fixture 1.00 EA 90.04 10.30 27.02 127.36 (0.00) 127.36 245. Combination CO/Smoke detector 1.00EA 120.34 13.77 36.10 170.21 (0.00) 170.21 246. Heat/AC register-Mechanically 1.00 EA 33.28 3.81 9.98 47.07 (0.00) 47.07 attached DOORS,WINDOWS&TRIM: 247. Interior door-Colonist-stain grade 1.00 EA 368.57 42.16 110.58 521.31 (0.00) 521.31 jamb&casing 248. Door knob-interior 1.00 EA 48.48 5.55 14.54 68.57 (0.00) 68.57 249. Bypass(sliding)door set-Colonist 1.00 EA 292.32 33.44 87.70 413.46 (0.00) 413.46 250. Door dummy knob-interior 1.00 EA 30.13 3.45 9.04 42.62 (0.00) 42.62 251. R&R Casing-2 1/4"stain grade 38.00 LF 4.06 17.65 46.28 218.21 (0.00) 218.21 252. Detach&Reset Closet rod 6.00 LF 2.84 1.95 5.12 24.11 (0.00) 24.11 253. Detach&Reset Shelving- 12"-in 6.00 LF 9.50 6.53 17.10 80.63 (0.00) 80.63 place 254. R&R Baseboard-21/4"stain grade 53.66LF 4.66 28.60 75.02 353.68 (0.00) 353.68 FLOORING: 255. Remove Carpet 184.11 SF 0.37 7.79 20.44 96.35 (0.00) 96.35 256. Carpet 211.73 SF 4.12 99.80 261.70 1,233.83 (0.00) 1,233.83 15%waste added for Carpet. 257. Carpet pad 184.11 SF 0.75 15.80 41.42 195.30 (0.00) 195.30 258. Additional charge for screwing down 184.11 SF 0.91 19.16 50.26 236.96 (0.00) 236.96 underlayment/subfloor PAINT: 259. Floor protection-self-adhesive 184.11 SF 0.78 16.43 43.08 203.12 (0.00) 203.12 plastic film SHILOH_DOWNER 2/27/2024 Page: l8 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Master Bedroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 260. Mask and prep for paint-plastic, 67.22 LF 1.72 13.22 34.68 163.52 (0.00) 163.52 paper,tape(per LF) 261. Seat/prime(1 coat)then paint(1 coat) 595.12 SF 1.22 83.06 217.82 1,026.93 (0.00) 1,026.93 the walls and ceiling 262. Seal(1 coat)&paint(1 coat)casing 38.00LF 1.94 8.44 22.12 104.28 (0.00) 104.28 263. Seal(1 coat)&paint(1 coat) 53.66LF 1.93 11.84 31.06 146.46 (0.00) 146.46 baseboard 264. Final cleaning-construction- 184.11 SF 0.36 7.58 19.88 93.74 (0.00) 93.74 Residential Totals: Master Bedroom 545.15 1,429.58 6,739.98 0.00 6,739.98 ---+_' „--4 Master Bathroom Height:8' �3'1" r 179.95 SF Walls 47.79 SF Ceiling t 2'8" 227.74 SF Walls&Ceiling 47.79 SF Floor td Bathroo 5.31 SY Flooring 23.34 LF Floor Perimeter Ath TO c - v �� 25.76 LF Ceil.Perimeter 3' Door 2'51/16"X 7'5/8" Opens into MASTER_BEDRO Window 3'3/8"X 2' 1113116" Opens into Exterior Subroom: Shower(1) Height: 8' b 81 9;!, , 76.32 SF Walls 11.16 SF Ceiling =........ 87.48 SF Walls&Ceiling 11.16 SF Floor x 1.24 SY Flooring 9.54 LF Floor Perimeter 9.54 LF Ceil.Perimeter Missing Wall 4'1 1/4"X 8' Opens into MASTER_BATHR DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: 265. R&R Joist-floor or ceiling-2x4- 1.00 LF 2.42 0.29 0.74 3.45 (0.00) 3.45 w/blocking 266. R&R Batt insulation- 12"-R38- 58.95 SF 2.88 19.43 50.92 240.12 (0.00) 240.12 unfaced batt 267. R&R Two coat plaster(no lath) 58.95 SF 9.38 63.26 165.88 782.09 (0.00) 782.09 SHILOH_DOWNER 2/27/2024 Page: 19 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Master Bathroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 268. Texture drywall-machine- 58.95 SF 1.14 7.68 20.16 95.04 (0.00) 95.04 knockdown 269. R&R Stud wall-2"x 4"x 8'-16"oc 12.00 LF 24.71 33.92 88.96 419.40 (0.00) 419.40 270. R&R Batt insulation-4"-R13- 256.27 SF 1.43 41.92 109.96 518.35 (0.00) 518.35 unfaced batt 271. R&R 1/2"drywall-hung,taped, 256.27 SF 3.63 106.42 279.08 1,315.76 (0.00) 1,315.76 floated,ready for paint 272. Texture drywall-light hand texture 256.27 SF 1.19 34.89 91.48 431.33 (0.00) 431.33 LIGHTS,FIXTURES&ELECTRICAL: 273. Bathroom ventilation fan w/light 1.00 EA 196.31 22.46 58.90 277.67 (0.00) 277.67 274. Light fixture 1.00 EA 90.04 10.30 27.02 127.36 (0.00) 127.36 275. Detach&Reset Light bar-3 lights 1.00 EA 80.26 9.18 24.08 113.52 (0.00) 113.52 276. Ground fault interrupter(GF)outlet 2.00 EA 41.47 9.49 24.88 117.31 (0.00) 117.31 277. Outlet 2.00 EA 23.00 5.27 13.80 65.07 (0.00) 65.07 278. Switch 3.00 EA 23.80 8.16 21.42 100.98 (0.00) 100.98 279. Outlet or switch cover 6.00 EA 4.42 3.03 7.96 37.51 (0.00) 37.51 280. Timer switch 1.00 EA 45.09 5.16 13.52 63.77 (0.00) 63.77 SHOWER/TUB&SURROUND: 281. R&R Fiberglass shower unit 1.00 EA 1,250.19 143.01 375.06 1,768.26 (0.00) 1,768.26 282. Shower faucet 1.00 EA 266.54 30.50 79.96 377.00 (0.00) 377.00 283. R&R Shower door 1.00 EA 625.21 71.52 187.56 884.29 (0.00) 884.29 BATH CABINETRY&FIXTURES: 284. Vanity 3.50LF 237.15 94.95 249.00 1,173.98 (0.00) 1,173.98 285. Sink-single 1.00 EA 307.04 35.13 92.12 434.29 (0.00) 434.29 286. Sink faucet-Bathroom 1.00 EA 250.85 28.69 75.26 354.80 (0.00) 354.80 287. Sink drain assembly with stop 1.00 EA 57.95 6.63 17.38 81.96 (0.00) 81.96 288. Detach&Reset Mirror-1/4"plate 12.00 SF 8.33 11.44 29.98 141.38 (0.00) 141.38 glass 289. Toilet 1.00 EA 601.56 68.82 180.46 850.84 (0.00) 850.84 290. Toilet seat 1.00 EA 62.98 7.20 18.90 89.08 (0.00) 89.08 291. Plumbing fixture supply line 1.00 EA 25.07 2.87 7.52 35.46 (0.00) 35.46 292. Toilet paper holder 1.00 EA 30.42 3.48 9.12 43.02 (0.00) 43.02 293. Towel bar 1.00 EA 33.15 3.80 9.94 46.89 (0.00) 46.89 DOORS,WINDOWS&TRIM: 294. R&R Vinyl window,horizontal 1.00 EA 434.25 49.68 130.28 614.21 (0.00) 614.21 sliding,12-23 sf 295. R&R Window sill 0.00 LF 4.36 0.00 0.00 0.00 (0.00) 0.00 296. R&R Window blind-fabric/woven- 1.00 EA 157.76 18.04 47.34 223.14 (0.00) 223.14 7.1 to 14 SF 297. R&R Window drapery-hardware 1.00 EA 119.65 13.69 35.88 169.22 (0.00) 169.22 SEMOH_DOWNER 2/27/2024 Page:20 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Master Bathroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 298. Interior door-Colonist-stain grade 1.00 EA 368.57 42.16 110.58 521.31 (0.00) 521.31 jamb&casing 299. Door knob-interior 1.00 EA 48.48 5.55 14.54 68.57 (0.00) 68.57 300. R&R Casing-2 1/4"stain grade 17.00LF 4.06 7.91 20.72 97.65 (0.00) 97.65 301. R&R Baseboard-2 1/4"stain grade 32.88 LF 4.66 17.53 45.96 216.71 (0.00) 216.71 FLOORING: 302. Remove Vinyl plank flooring 58.95 SF 1.60 10.79 28.30 133.41 (0.00) 133.41 303. Vinyl plank flooring 64.84 SF 7.18 53.26 139.66 658A7 (0.00) 658.47 304. Add for glued down vinyl plank appl. 58.95 SF 4.54 30.62 80.28 378.53 (0.00) 378.53 over wood substrate 305. Additional charge for screwing down 58.95 SF 0.91 6.14 16.10 75.88 (0.00) 75.88 underlayment/subfloor 306. Floor preparation for resilient flooring 58.95 SF 0.90 6.07 15.92 75.05 (0.00) 75.05 PAINT: 307. Floor protection-self-adhesive 58.95 SF 0.78 5.27 13.80 65.05 (0.00) 65.05 plastic film 308. Mask and prep for paint-plastic, 35.30 LF 1.72 6.94 18.22 85.88 (0.00) 85.88 paper,tape(per LF) 309. Seal/prime(1 coat)then paint(1 coat) 315.22 SF 1.22 43.99 115.38 543.94 (0.00) 543.94 the walls and ceiling 310. Seal(1 coat)&paint(1 coat)casing 17.00LF 1.94 3.77 9.90 46.65 (0.00) 46.65 311. Seal(1 coat)&paint(1 coat) 32.88LF 1.93 7.25 19.04 89.75 (0.00) 89.75 baseboard 312. Final cleaning-construction- 58.95 SF 0.36 2.43 6.36 30.01 (0.00) 30.01 Residential Totals: Master Bathroom 1,219.99 3,199.28 15,083.41 0.00 15,083A1 Total: Upstairs 5,910.72 15,499.90 73,076.86 0.00 73,076.86 Basement SHELOH_DOWNER 2/27/2024 Page:21 {{ Sound Adjusters s P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com T Stairs Height:Sloped 3'0'7— 5'5" 5'�31 46.30 SF Walls 26.40 SF Ceiling 2'I" j 72.69 SF Walls&Ceiling 28.68 SF Floor }I j 1 3.19 SY Flooring 3.75 LF Floor Perimeter sq., 6'i" 6.94 LF Ceil.Perimeter Window 10 5/8"X 6'2 7/16" Opens into Exterior Window 6' 1"X 2'2" Opens into Exterior Door Y 2 5/16"X 7'5/8" Opens into Exterior Window 1111/16"X 6'213/16" Opens into Exterior Missing Wall-Goes to neither Floor/Ceiling 3'91/4"X 9'813/16" Opens into Exterior Missing Wall-Goes to neither Floor/Ceiling 3'91/4"X 9'213/16" Opens into DEN cement Hall Clo 3'4" Subroom: Stairs2(2) Height:Sloped 19.73 SF Walls&Ceiling 19.73 SF Ceiling 4.27 SY Flooring 38.45 SF Floor v Missing Wall Y 4"X 13'3" Opens into LANDING1 Missing Wall-Goes to neither Floor/Ceiling 4' 101/2"X 9'813/16" Opens into DEN Missing Wall Y 4"X 13'3" Opens into BASEMENT_HA2 10 Srairs Sl 3'3 Subroom: Stairs2(3) Height:Sloped 1 19.39 SF Walls&Ceiling 19.39 SF Ceiling 4.21 SY Flooring 37.85 SF Floor 1 Missing Wall Y 31/4"X 18'5" Opens into LANDING1 Missing Wall-(Toes to neither Floor/Ceiling 4'101/2"X 10'5" Opens into Exterior Missing Wall Y 31/4"X 18'5" Opens into STAIRS SHILOH_DOWNER 2/27/2024 Page:22 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 KA_ (360)447-8639 claims@soundadjusters.com Subroom: Stairs(1) Height: 8' 5'i 9„ -4301 33.93 SF Walls 5.67 SF Ceiling 39.60 SF Walls&Ceiling 5.67 SF Floor Stair,3'1) 3 0.63 SY Flooring 3.96 LF Floor Perimeter 1 6.74 LF Ceil.Perimeter IBM I Missing Wail 3'31/4"X 8' Opens into STAIRS4 Door 2'9 3/8"X 7'21/4" Opens into BASEMENT_HAL DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV CEILING&WALLS: 313. R&R Batt insulation-12"-R38- 71.19 SF 2.88 23.47 61.50 289.99 (0.00) 289.99 unfaced batt 314. R&R Two coat plaster(no lath) 71.19 SF 9.38 76.39 200.34 944.49 (0.00) 944.49 315. Texture drywall-machine- 71.19 SF 1.14 9.28 24.34 114.78 (0.00) 114.78 knockdown 316. R&R Stud wall-2"x 4"x 8'-16"oc 8.00 LF 24.71 22.62 59.30 279.60 (0.00) 279.60 317. R&R Batt insulation-4"-R13- 80.23 SF 1.43 13.13 34.42 162.28 (0.00) 162.28 unfaced batt 318. R&R 1/2"drywall-hung,taped, 80.23 SF 3.63 33.31 87.38 411.92 (0.00) 411.92 floated,ready for paint 319. Texture drywall-light hand texture 80.23 SF 1.19 10.92 28.64 135.03 (0.00) 135.03 LIGHTS,FIXTURES&ELECTRICAL: 320. R&R Hanging light fixture 2.00 EA 130.18 29.78 78.10 368.24 (0.00) 368.24 DOORS,WINDOWS&TR1M: 321. Exterior door-solid mahogany- 1.00 EA 1,686.42 192.92 505.92 2,385.26 (0.00) 2,385.26 paneled 322. Door lockset&deadbolt-exterior 1.00 EA 93.65 10.71 28.10 132.46 (0.00) 132.46 323. R&R Casing-2 1/4"stain grade 17.00 LF 4.06 7.91 20.72 97.65 (0.00) 97.65 FLOORING: 324. Remove Carpet 110.65 SF 0.37 4.68 12.28 57.90 (0.00) 57.90 325. Carpet 127.25 SF 4.12 59.98 157.28 741.53 (0.00) 741.53 15%waste added for Carpet. 326. Carpet pad 110.65 SF 0.75 9.49 24.90 117.38 (0.00) 117.38 327. Additional charge for screwing down 110.65 SF 0.91 11.52 30.20 142.41 (0.00) 142.41 underlayment/subfloor PAINT: 328. Floor protection-self-adhesive 110.65 SF 0.78 9.88 25.90 122.09 (0.00) 122.09 plastic film 329. Mask and prep for paint-plastic, 13.68 LF 1.72 2.69 7.06 33.28 (0.00) 33.28 paper,tape(Per LF) 330. Seal/prime(1 coat)then paint(1 coat) 151.42 SF 1.22 21.14 55.42 261.29 (0.00) 261.29 the walls and ceiling 331. Paint door slab only-2 coats(per 1.00 EA 48.46 5.54 14.54 68.54 (0.00) 68.54 side) 332. Seal(1 coat)&paint(1 coat)casing 21.00LF 1.94 4.67 12.22 57.63 (0.00) 57.63 SHMOH_DOWNER 2/27/2024 Page:23 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com CONTINUED-Stairs DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 333. Seal(1 coat)&paint(1 coat) 7.71 LF 1.93 1.70 4.46 21.04 (0.00) 21.04 baseboard 334. Final cleaning-construction- 110.65 SF 0.36 4.56 11.94 56.33 (0.00) 56.33 Residential Totals: Stairs 566.29 1,484.96 7,001.12 0.00 7,001.12 Total: Basement 566.29 1,484.96 7,001.12 0.00 7,001.12 Emergency Services Mitigation DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 335. Water Mitigation-Invoice* 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 Totals: Mitigation 0.00 0.00 0.00 0.00 0.00 Pack-Out/Pack-In DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 336. Contents Pack-Out-Invoice* 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 Totals: Pack-Out/Pack-In 0.00 0.00 0.00 0.00 0.00 Testing DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 337. Lead test fee-full service lead survey 1.00 EA 500.00 57.20 150.00 707.20 (0.00) 707.20 -base fee 338. Contamination-air or surface testing 5.00 EA 149.83 85.71 224.74 1,059.60 (0.00) 1,059.60 &lab analysis 339. Megohmmeter check electrical 1.00 EA 1,226.43 140.31 367.92 1,734.66 (0.00) 1,734.66 circuits-average residence Totals: Testing 283.22 742.66 3,501A6 0.00 3,501A6 SHILOH_DOWNER 2/27/2024 Page:24 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com Expert/Engineer DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 340. Engineering fees-Invoice* 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 Totals: Expert/Engineer 0.00 0.00 0.00 0.00 0.00 Structure/Framing DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 341. Framing(Bid Item)* 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.W Totals: Structure/Framing 0.00 0.00 0.00 0.00 0.00 Electrical,Plumbing,&Heating DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 342. Electrical(Bid Item) 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 343. Plumbing(Bid Item) 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 344. HVAC(Bid Item)* 1.00EA 0.00 0.00 0.00 0.00 (0.00) 0.00 Totals: Electrical,Plumbing,&Heating 0.00 0.00 0.00 0.00 0.00 Permits&Fees DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 345. Taxes,insurance,permits&fees(Bid 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 Item) Totals: Permits&Fees 0.00 0.00 0.00 0.00 0.00 Ordinance&Law DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 346. Mason County-Buildings& 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 Construction Ordinance* Totals: Ordinance&Law 0.00 0.00 0.00 0.00 0.00 SHILOH_DOWNER 2/27/2024 Page:25 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com Jobsite Supervision DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 347. Residential Supervision/Project 40.00 HR 78.30 358.31 939.60 4,429.91 (0.00) 4,429.91 Management-per hour Totals: Jobsite Supervision 358.31 939.60 4,429.91 0.00 4,429.91 Debris Removal/Disposal DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 348. General clean-up 30.00 HR 57.52 197.41 517.68 2,440.69 (0.00) 2,440.69 1 hr.per day x 30 days 349. Dumpster load-Approx.40 yards,7- 1.00EA 1,395.00 159.59 418.50 1,973.09 (0.00) 1,973.09 8 tons of debris Totals: Debris Removal/Disposal 357.00 936.18 4,413.78 0.00 4,413.78 Total: Interior 7,720.59 20,245.90 95,452.78 0.00 95,452.78 Other Structures Fence DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 350. R&R Wood fence 5'-G high-cedar 32.00 LF 54.20 152.62 0.00 1,887.02 (0.00) 1,887.02 or equal 351. R&R Wood gate 5'-G high-cedar or 8.00 LF 81.71 57.53 0.00 711.21 (0.00) 711.21 equal Totals: Fence 210.15 0.00 2,598.23 0.00 2,598.23 Total: Other Structures 210.15 0.00 2,598.23 0.00 2,598.23 Non-Salvagable Contents DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 352. Non-Salvagable Contents- 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 ReceiptsMvoices* Totals: Non-Salvagable Contents 0.00 0.00 0.00 0.00 0.00 SHILOH_DOWNER 2/27/2024 Page: 26 ) Y Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com ALFJLoss of Use DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 353. ALE-Receipts/Invoices* 1.00 EA 0.00 0.00 0.00 0.00 (0.00) 0.00 Totals: ALE/Loss of Use 0.00 0.00 0.00 0.00 0.00 Line Item Totals: WADLEIGH_SUPPLEMENT 13,171.92 33,990.22 162,850.50 0.00 162,850.50 Grand Total Areas: 10,095.76 SF Walls 1,669.30 SF Ceiling 11,765.05 SF Walls and Ceiling 1,709.13 SF Floor 189.90 SY Flooring 731.50 LF Floor Perimeter 6,256.00 SF Long Wall 6,256.00 SF Short Wall 890.56 LF Ceil.Perimeter 1,613.13 Floor Area 1,710.67 Total Area 3,724.29 Interior Wall Area 3,727.14 Exterior Wall Area 253.96 Exterior Perimeter of Walls 2,011.73 Surface Area 20.12 Number of Squares 225.51 Total Perimeter Length 62.92 Total Ridge Length 0.00 Total Hip Length Coverage Item Total % ACV Total % Dwelling 160,252.27 98.40% 160,252.27 98.40% Other Structures 2,598.23 1.60% 2,598.23 1.60% Contents 0.00 0.00% 0.00 0.00% Total 162,850.50 100.00% 162,850.50 100.00% SHILOH_DOWNER 2/27/2024 Page:27 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims @ soundadjusters.com Summary for Dwelling Line Item Total 113,300.28 Overhead 16,995.11 Profit 16,995.11 Sales Tax 12,961.77 Replacement Cost Value $160,252.27 Less Deductible (1,500.00) Net Claim $158,752.27 SHILOH_DOWNER 2/27/2024 Page:28 Sound Adjusters P.O.Box 3956 Silverdale,WA 98383 (360)447-8639 claims@soundadjusters.com Summary for Other Structures Line Item Total 2,388.08 Sales Tax 210.15 Replacement Cost Value $2,598.23 Net Claim $2,598.23 SHILOH_DOWNER 2/27/2024 Page: 29