HomeMy WebLinkAboutSHX2009-00048 - SHX Application - 10/8/2009 S7gTFo MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
o
o n o 0 Planning Division
i o T i P O Box 279, Shelton, WA 98584
Y
N (360)427-9670
°~ r0BEKEFT ,r�11 �� :
1864 n
K�d1 � ';'� Exemption from Shoreline Management Act
=-1-Substantial Development Permit Requirement
Case No.: SHX2009-00048
The Proposal By: SIMPSON LUMBER LLC 1 �
421 S FRONT STREET PN r `T 72�0 LS- 40 ` 0a000
SHELTON,WA 98584
To undertake the following development: TO B \ J i- IN TH
To protect upper bank along Goldsborough Creek following 2009 wini'cr`Sto'rm-"damage, place
riprap rock starting at 8 feet above channel and the previously placed rock, then extending back
11 feet towards the railroad tracks in a 100-foot length area where bank washout occurred; action
will protect emergency rock placement during that 2009 event.
Within GOLDSBOROUGH CREEK and/or its associated wetlands is exempt from the requirement of substantial
development because the development is categorized under WAC 173-27-040(2) as being category
B-normal maintenance
Please contact Allan Borden at ext 365 if you have an questions.
to��aC �`�
Issued: 10/8/2009
Expires: 10/8/2011 Authorized Local Government Official
SCE U C�k6vL
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
Intranetix Viewer [5301150190C.tifJ Page 1 of 1
® Scale:lo..._.........%0
Sa , waELrEL
' 4t
d �aMt O L7tt.A
lONNS LAJCL
4 3 2
\ 7TlRTLL'LAKE
4 G
o4i /I SHELTOII
I! AiRPL RT
s 10 1 t
b
i !
Dwton � ate, �
d
CT 14
eteec
_ _............._....
_
20 $dam area � ._mea
23
n
Lo 200�1
http://map l.msc.fema.gov/idms/IntraView.cgi?ROT=O&O—X=7953&O—Y=8039&O—ZM... 9/29/2009
Intranetix Viewer [5301150190C.tif] Page 1 of 1
APPROXIM A'I-E.SCALE IN FEE 7'
t 600 0 70gq
'� M1110NA1 F10001N50RANtf Pt06RAY
FIRM
FLOOD INSURANCE RATE MAP
MASON COUNTY,
WASHINGTON
t (UNINCORPORATED AREAS)
r
"^ 15
x PANEL 190 OF 300
w _ se.wN,»oex wnrw«nu»or.wnsreot
t
C�
Ss a
y .I
' y
ZONE C COMMUNITY-PANEL NUMBER
Z�y 530115 0190 C
/ EFFECTIVE DATE:
MAY 17,1988
I.
a - "'��.:.Fndenl EmY Mnwp.mnnt A/,ensy
.ONE A,---
ZON E A a aMetn.i#Ich m.r nwor eeew nw .�»e�, .�,.,K.rer
N�,-;- �� htN nl k For the lehwl pfoWatfHonti.nen nbe�t NenmH4lootl in
Aropwm IwA anent ahto4 the nE1,/A FlaaE Men 6Eero vt.�.wr.mee.
Dc-,,-- 2,do-mil
6S
http://map l.msc.fema.gov/idms/IntraView.cgi?ROT=O&O_X=7431&O_Y=5083&O_ZM... 9/29/2009
i=EMA 100 year f &I
data not availabte� for
thi rea but said to"" "
-be o 3'
°as
1
N
x ,
100 ;yecx , f loud said to � AI
H
k
Hi h Water Line '
Ah
ow
r
j t Lev et
r<
u
P e
P
r
N»
v_
Y
ty xM
k y
-------------------------------------
2 0 0 9 AGENCY USE ONLY
WAS H I N G TO N STATE Army or of Ps Date received:
of Engineers. ,
Seattle District ,
i
Joint Aquatic Resources Permit
Application (DARPA) Form hel
Agency reference#:
USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW. Tax Parcel#(s):
Part 1—Project Identification
Unique project information that makes it easy to identify. [hem =-------------------------------------
1a. Unique Project Identifier Number (UPI #) he► ]
• Don't have one yet?Get one at http://www.epermitting.wa,gov or call the Washington Governor's Office of Regulatory Assistance
at(800) 917-0043.
1 b. Project Name (Examples: Smith's Dock or Seabrook Lane Development) [help]
Carman Road Railroad Right-Away Repairs and Maintenance
Part 2—Applicant
The person or organization responsible for the project. hf M
2a. Name (Last, First, Middle) and Organization (if applicable)
Simpson Lumber LLC
2b. Mailing Address (Street or PO Box)
421 S. Front St.
2c. City, State, Zip
Shelton, Washington
2d. Phone(1) 2e. Phone(2) 2f. Fax 2 . E-mail
( 360 )4901216 ( ) ( 360) 427 4931 jenslow@simpson.com
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this
application.) hf eM
3a. Name (Last, First, Middle) and Organization (if applicable)
Jerry Enslow
3b. Mailing Address (Street or PO Box)
421 S. Front St.
3c. City, State, Zip
Shelton, Wa. 98958
3d. Phone(1) 3e. Phone(2) 3f. Fax 3 . E-mail
( 360) 490 1216 ( ) ( 360) 427 4931 jenslow@simpson.com
JARPA 2009 Page 1 of 12
Fart 4—Property Owner(s) [help]
Contact information for people or organizations owning the property(ies) where the project will occur. [heV
❑ Same as applicant. (Skip to Part 5.)
X❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple property owners. Complete the section below and use JARPA Attachment A for each
additional property owner.
4a. Name (Last, First, Middle) and Organization (if applicable)
Simpson Lumber LLC
41b. Mailing Address (Street or PO Box)
421 S. Front St.
4c. City, State, Zip
Shelton, WA 98584
4d. Phone(1) 4e. Phone(2) 4f. Fax 4g E-mail
( 360 ) 490 1216 ( ) ( 360) 427 4931 jenslow@simpson.com
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. h( eM
❑ There are multiple properties or project locations (e.g., linear projects). Complete the section below and use
JARPA Attachment B for each additional property.
5a. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5n.) [help]
Carman Road North, no address - see lat/long
5b. City, State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.) [help]
Shelton, WA 98584
5c. County h[ eMMason
Mason
5d. Provide the section, township, and range for the project location. hel
Y4 Section Section Township Range
100'R R R/W in S12 SE+NW SE Tr20n R4W
5e. Provide the latitude and longitude of the project location. heel ]
• Example:47.03922 N lat./-122.89142 W long
47*13.360N — 123*10.583W
5f. List the tax parcel number(s) for the project location. [help]
• The local county assessor's office can provide this information.
420154000000
5g. Indicate the type of ownership of the property. (Check all that apply.) help]
❑ State Owned Aquatic Land ❑ Tribal X❑ Private
❑ Other publicly owned (federal, state, county, city, special districts like schools, ports, etc.)
JARPA 2009 Page 2 of 12
5h. Contact information for all adjoining property owners, lessees, etc. (If you need more space, use JARPA
Attachment C.)
Name Mailing Address Tax Parcel #(if known)
None, Simpson owns adjacent
lands
.................................................................................__...__..................__....__.._...................................................................................
...................................................................._.................................._...._...........--_.........................._..............................._.._.........._................
5i. Is any part of the project area within a 100-year flood plain? hei
❑ Yes X❑ No ❑ Don't know
5j. Briefly describe the vegetation and habitat conditions on the property. hei
This is a railroad right of way surrounded be, forest lands, trees, ferns, brush.
5k. Describe how the property is currently used. [Leip]
Currently used as a railroad right a way
51. Describe how the adjacent properties are currently used. hei
All forest lands.
JARPA 2009 Page 3 of 12
5m. Describe the structures (above and below ground) on the property, including their purpose(s). Lei
No structures above or below. But a railroad track is centered in the right a way.
5n. Provide driving directions from the closest highway to the project location, and attach a map. el
From State highway 101 travel west to the Carman road to RR Track Crossing. Continue 500 and turn right
onto a logging road. Drive to the logging road gate. Park at the gate and walk to your right.
Part 6—Project Description
6a. Summarize the overall project. You can provide more detail in 6d. hel
The railroad right-a-way will be used daily. At this section on the track during last January's heavy rain fall
approximately a 100' long area adjacent to the track washed out.
Place riprap starting about 8' above the Goldsborough Creek and 11' landward toward the RR track to secure
the this area.
6b. Indicate the project category. (check all that apply.)
❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
X❑ Maintenance ❑ Environmental Enhancement
6c. Indicate the major elements of your project. (check all that apply.) h( elpl
❑ Aquaculture ❑ Culvert ❑ Float ❑ Road
X❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey ❑ Scientific Measurement
❑ Boat House ❑ Dike / Levee /Jetty ❑ Land Clearing Device
❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs
❑ Boat Lift ❑ Dock/ Pier ❑ Mining ❑ Stormwater facility
❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool
❑ Bulkhead ❑ Fence ❑ Piling ❑ Utility Line
❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall (upland)
❑ Channel Modification ❑ Fishway
❑ Other:
JARPA 2009 Page 4 of 12
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. Lheip]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year flood plain.
Stabilize the bank. Riprap will be delivered by truck to the RR right-a-way. A 330 Cat excavator with a thumb
attachment will place each rock. Additional 2" to 4" clean rock will be placed behind the riprap.
6e. What are the start and end dates for project construction? (month/year) h[ elp]
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: Soon as possible 2009 End date: Before year end 2009 ❑ See JARPA Attachment D
6f. Describe the purpose of the work and why you want or need to perform it. h[_eM
During a high rain fall event last January (2009) a portion of ground adjacent to the railroad track washed out.
Need to install the riprap to prevent a re-occurrence of this event. A re-occurrence will compromise the operation
of the railroad
6g. Fair market value of the project, including materials, labor, machine rentals, etc. [help]
$30,000
6h. Will any portion of the project receive federal funding? [help]
• If yes, list each agency providing funds.
❑ Yes X❑ No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)
-------------
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. Ewp]
X❑ Not applicable
JARPA 2009 Page 5 of 12
7b. Will the project impact wetlands? [help] --
❑ Yes X❑ No ❑ Don't know
7c. Will the project impact wetland buffers? hei ]
❑ Yes X❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? [heipj
• If yes, submit the report, including data sheets, with the JARPA package.
❑ Yes X❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [help]
• If yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes X❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? LWpj
• If yes, submit the plan with the JARPA package.
❑ Yes ❑ No X❑ Not applicable
7g. Use the table below to list the type and rating of each wetland that will be impacted; the extent and duration
of the impact; and the type and amount of compensatory mitigation proposed. If you are submitting a
compensatory mitigation plan with a similar table, you may simply state (below) where we can find this
information in the mitigation plan. [kip]
Activity causing Wetland type Impact area Duration Proposed Wetland
impact (fill, and rating (sq. ft. or acres) of impact2 mitigation mitigation area
drain, excavate, category' type (sq. ft. or acres)
flood, etc.)
DNA DNA DNA DNA DNA DNA
' Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland
rating forms with the JARPA package.
2 Indicate the time (in months or years, as appropriate)the wetland will be measurably impacted by the activity. Enter"permanent"if
applicable.
3 Creation (C), Re-establishment/Rehabilitation (R), Enhancement(E), Preservation (P), Mitigation Bank/ln-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
7h. For all filling activities identified in 7g., describe the source and nature of the fill material, the amount in
cubic yards that will be used, and how and where it will be placed into the wetland. [help]
None in wetlands
i
7i. For all excavating activities identified in 7g., describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. hem
None in wetlands
JARPA 2009 Page 6 of 12
7j. Summarize what the compensatory mitigation plan is meant to accomplish, and describe how a watershed
approach was used to design the plan. [help]
DNA
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [help)
X❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
X❑ Not applicable
This work will take place above and landward of Goldsborough Creek. Please see cross section view picture
8b. Will your project impact a waterbody or the area around a waterbody? h[ gld
x❑ Yes ❑ No
8c. Summarize impact(s) to each waterbody in the table below. Lem]
Activity Waterbody Impact Duration Amount of Area (sq. ft. or
causing impact name location' of impact2 material to be linear ft.) of
(clear, dredge, placed in or waterbody
fill, pile drive, removed from directly affected
etc.) waterbody
none Goldsborou h adjacent week none none
Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the
waterbody and indicate whether the impact will occur within the 100-year flood plain.
z Indicate the time(in months or years,as appropriate)the waterbody will be measurably impacted by the work. Enter"permanent"if
applicable.
8d. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? heI
• If yes, submit the plan with the JARPA package.
❑ Yes ❑ No X❑ Not applicable
8e. Summarize what the compensatory mitigation plan is meant to accomplish. Describe how a watershed
approach was used to design the plan.
• If you already completed 7j., you do not need to restate your answer here. [helpl
See 7 J ---- —
JARPA 2009 Page 7 of 12
8f. For all activities identified in 8c., describe the source and nature of the fill material, amount (in cubic yards) 1
you will use, and how and where it will be placed into the waterbody. (help]
No material will be place in the waterbody
8g. For all excavating or dredging activities identified in 8c., describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. (neip]
No material will be place in the waterbody
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project.
9a. If you have already worked with any government agencies on this project, list them below. [help
Agency Name Contact Name Phone Most Recent
Date of Contact
Mason County Over the counter/planning ( 360) 427 7262 09/21/09
depart + permit depart
913. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of
Ecology's 303(d) List? heAi
• If yes, list the parameter(s) below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
❑ Yes X❑ No
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [help]
• Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
#17110017 This is as close as you get from this site. "Skokomish"
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? [help]
• Go toh!!p:.//wwvvecy.wa..qov/serviceslgis/maps/wria/wria.htm to find the WRIA#.
WRIA 14
JARPA 2009 Page 8 of 12
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? h[ eAi
• Gotohttp://www.ecv.wa.gov/programslwq/�qW /criteria.html for the standards.
❑ Yes ❑ No X❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? [hepj
• If you don't know, contact the local planning department.
• For more information, go to: http://mvw.ecy.wa. oq v/programs/sea/sma/laws rules/173-26/211 designations.htmi.
X❑ Rural ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? h[ d
• Go to http://www.dnr.wa.qov/BusinessPermits/Topics/ForestPracticesApplications/Pageslfp watertyping.aspx for the Forest
Practices Water Typing System.
❑ S X❑ F ❑ Np El Ns
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [L,eIp]
• If no, provide the name of the manual your project is designed to meet.
❑ Yes ❑ No DNA
Name of manual:
9i. If you know what the property was used for in the past, describe below.
For over a 100 years used as a railroad right-a-way and still is
9j. Has a cultural resource (archaeological) survey been performed on the project area? h[ eM
• If yes, attach it to your JARPA package.
❑ Yes X❑ No
9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. h[ eip]
None
91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. h[ elp)
None
JARPA 2009 Page 9 of 12
Part 10—Identify the Permits You Are Applying For
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or helpCa)ora.wa.gov.
10a. Compliance with the State Environmental Policy Act (SEPA). (check all that apply.) the p]
• For more information about SEPA, go to www.ecy.wa.gov/programs/sea/sepa/e-review.htmi.
copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (check the box below in 10b.)
• Submit the Fish Habitat Enhancement Project form with this application. The form can be found at:
http://www.epermitting.wa.gov/site/alias_resourcenter/jarpa_jarpa_form/9984/jarpa_form.aspx.
X❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
X❑ Other: Exempt from "Shoreline Management Permit" per Mason County
❑ SEPA is pre-empted by federal law. hjel l
10b. Indicate the permits you are applying for. (check all that apply.) h( elpl
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
X❑ Shoreline Exemption Type (explain): Maintenance work
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
JARPA 2009 Page 10 of 12
Washington Department of Fish and Wildlife:
X❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA 2009 Page 11 of 12
'Part 11—Authorizing Signatures
Signatures required before submitting the JARPA package.
11a. Applicant h Signature (required) [help]
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. —J�;— (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. ��`(initial)
A li ant Date
11 b. Authorized Agent Signature hel
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Date
11 c. Property Owner Signature (if not applicant) [bp .]
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
S t MP�6 A I ICI-Jav\— L LCI
Property Owner "ate
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact The Governor's Office of Regulatory Assistance(ORA). People with hearing loss
can call 711 for Washington Relay Service. People with a speech disability can call (877) 833-6341.
ORA publication number: ENV-019-09
JARPA 2009 Page 12 of 12
10/8/2009
12:18:36PM
Mason County
1rf;4
Parcel Summary Report For Parcel # 420154000000
Land Use: HIGHWAY/STREET RIG Parcel Size: 9.22 Legal Description:
Tax Code: 134 Land Value: 13,830.00 100' R R R/W IN S1/2 SE & NW SE
Fire Disctrict: 16 Improvement Value: 0.00
School District: 309 Total Value: $ 13,830.00
Zoning*: RW
Notes:
*Please verify zoning with the Mason County Planning Dept.
Site Address
Address
Role People
Type Last Name M.I. First Name Address 1 Address 2 City State Zip Phone 1 Ext Phone 2
Cases Associated With Parcel # 420154000000
Case Number Status Project Description Applicant/Owner
SHX2009-00048 ISS To protect upper bank along Goldsborough Creek following 2009 winter SIMPSON LUMBER LLC
storm damage, place riprap rock starting at 8 feet above channel and the
previously placed rock, then extending back 11 feet towards the railroad
tracks in a 100-foot length area where bank washout occurred; action will
protect emergency rock placement during that 2009 event.
Page 1 of 1 Parcel Summary_rpt
To: Mason County
From: Simpson Lumber LLC
Agent:Jerry Enslow—360 490 1216
Purpose: Shoreline Exemption Permit
Simpson Lumber's Railroad Track with in Simpson Lumber's RR Right of Way near the Carman Rd No is in
need of maintenance/repair. A portion of land near the track washed out. I am requesting an exemption
from "Shoreline Permit".The repairs required should be done ahead of the rainy season. A JARPA is
attached.
Thank you,
akO-,W
Jerry Enslow