Loading...
HomeMy WebLinkAboutSEP2019-00036 FPA2019-00008 logging .75 ac - SEP Determinations - 7/1/2019 a STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 -(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 July 15,2019 Michael MacSems, SEPA Responsible Official Mason County Department of Community Services Planning Division PO Box 279 Shelton, WA 98584 Dear Michael MacSems: Thank you for the opportunity to comment on the determination of nonsignificance for the Rodius Harvest for Home Site and Access Road Project(SEP2019-00036)as proposed by John W.Rodius. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): WATER QUALITY/WATERSHED RESOURCES UNIT: Chris Montague-Breakwell(360) 407-6364 Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. Construction Stormwater General Permit: The following construction activities require coverage under the Construction Stormwater General Permit: 1. Clearing, grading and/or excavation that results in the disturbance of one or more acres and discharges stormwater to surface waters of the State; and 2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or Michael MacSems July 15,2019 Page 2 sale will ultimately disturb one acre or more and discharge stormwater to surface waters of the State. a) This includes forest practices(including, but not limited to,class IV conversions) that are part of a construction activity that will result in the disturbance of one or more acres, and discharge to surface waters of the State;and 3. Any size construction activity discharging stormwater to waters of the State that Ecology: a) Determines to be a significant contributor of pollutants to waters of the State of Washington. b) Reasonably expects to cause a violation of any water quality standard. If there are known soil/ground water contaminants present on-site, additional information (including,but not limited to:temporary erosion and sediment control plans; stormwater pollution prevention plan; list of known contaminants with concentrations and depths found; a site map depicting the sample location(s);and additional studies/reports regarding contaminant(s))will be required to be submitted. You may apply online or obtain an application from Ecology's website at: http://www.ecy.wa.gov/prograins/wg/stormwater/construction/-Application. Construction site operators must apply for a permit at least 60 days prior to discharging stormwater from construction activities and must submit it on or before the date of the first public notice. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments, please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (MLD:201903744) cc: Chris Montague-Breakwell, WQ John W. Rodius (Proponent) MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2019-00036 Description of This SEPA is associated with a Class IV General FPA Proposal: for logging approximately .75 acres of a 4-acre parcel.The site had an average slope of about 15% and is mapped Stable by the DNR. No critical areas have been identified on or adjacent to the cutting area.The applicant shall provide a narrative addressing minimum stormwater and erosion control requirements prior to the issuance if the Class IV G FPA. A Road Access Permit must be secured from Mason County Public Work before the permit can be issued. Proponent: John W Rodius Location of Proposal: No address. Parcel Number: 12217-14-90042 Legal Description: Portion SE %, NE %, Sec 17, Twp. 22N., Rng 1W., W.M., Directions to Site: Across from 800 E North Bay Rd, Allyn, WA. The Lead Agency for this proposal has determined that it does not have a probably significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency.This information is available to the public upon request. Please contact Michael MacSems at ext. 571, or mms@co.mason.wa.us with any questions. This DNS is issued under WAC 197-11-340(2).The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by 7/15/2019. Appeal of this determination must be filed within a 14-day period following this final determination date,per Mason County Code Chapter 15.11 Appeals. Date: 7/1/2019 v6v�-�� Kell Rowen,Mason County Planning Manager,Dept of Community Services 122177590123 a 12217140007O F ' 122171480300 122171390101 122178888888 122171400020 IW c 4 r yn, - � 12217139010 12217140", '1 l �{ � , . 122170060 00 E a 1 490042 4 122171 T ° 122171490043 922171490042 i �' .� 122171490044 \ Q 122171400080 -- 122172400010 IFIV)14 122171490043'' _. O 122171400042 a, ' S 122171400050 ✓1 o .,. 122171490044 122174200010 s �c 122174100010 ' 122174200110 r-.: E n +�igritalGlobe GeoEye i-cubed, U4 swi , U- E� in• erogrid, I x 122i/410 0 poheGIS User Community Department of Archaeology and Historic Preservation 42.300003 5415 .. h 42 300003 59 50 4230000101 1' � 42.3000046504 V 42.3000002038 \ 4<) ,0400541..:4 „ 42.3000032995 4 423C?t}{}CF )i;.'2 " s o ti 423000038906 ` . 41.;t7(�Ot?48�;11 �� 423000 0 52 98E 4t.77 t,ra 42300003 � ,r ,, �;� 640000003848 42300+D0.32261 42:3000004636i 42.3 00 0045 891� `. c40000057126 42.3 0000 5,1�92 5 42.3000050.it:}5 -- � 4 2.3 0000 54134 � 423000050305 42-3 0 00 0 5.3925 ` T22R01W � 42 ��t.�,-�ti5w'17f) �` ` 843000028404 170. z 42:3000053165 x 4 ' 52772 4230000063.37 ti 42.30t1[ 0r,21 7(1 � � 11 i { { 17 c,7 2 } -423000o34'"2 S 42.3000(15277z_ 423000011466 I�4 41 01}00.150.3 42:3t}0001018 3c3 r -1 1ti I 42. 0000042 5 --- � � 4230t_1002-8 0" I 42300000625 423000017829 June 24, 2019 1:4,349 C 0 0.035 0.07 0.14 mi 5 Determined Eligible Township Range & Sections 0 0.05 0.1 0.2 km Determined Not Eligible I Count g L� y Sources:Esrt HERE,Garrnin,Intermap,increment PCorp.,GEBCO,USGS, FAO,NPS,NRCAN,GeoBase,IGN,KadasterNL,Ordnance Survey,Esri �' No Determination �^h :, ':' fi�ti�. '' .� � � ��, q� ti�•, rr"' .�r yr; � � .. f �"�k � a.;. � t� i' � 1 ` r4 � � # � ��� .. � �.� .'F t. "jig :� � w;Vn' �Ji '+t 4 •� !. t` �t�� .; .. `2. h• �..✓ �. i,� . . �F` , l t•. .. Y ..w °� s�. .. �.' � �' 4.. -_e- r - i 'i ;. . �. ,.� .. ,� v . �_ ,. ' � •• e4 � c c *11 i � ;i�' .:d Y S. Z .dam' r 1 ... '-t. ,t �i' �.lid . _. y .: -� � ,. ..® .� �, �. �_ �.x .-.. - f t �y+ ,, `._ ,<_ ;t .: �. ���# "'fir '[ a4- r `t� �'" '.s; 1'f: "�1�. 'ar'a ..1 f Sri� � ��' ��,�,��- ��G, :. , - 5N„ 1,T- ' ._ ,.. � i - , At 3iP�r IT- - ��PRr: is77 ' f - > < •{' as 1 ,,,fir •P'°['' � �• � � � .. e �a .M ��s Conditions for FPA 19-08, John Rodius, North Bay Rd ARCHAEOLOGICAL RESOURCES Archaeological or historical resources, such as ruins, sites, buildings, artifacts, fossils, or other objects of antiquity that may have significance from an historical or scientific standpoint, which may be encountered by the developer/contractor, shall not be further disturbed. If the developer/contractor encounters any such artifacts,he/she shall immediately stop work and notify Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result in civil penalties. X HOURS OF OPERATION Noise associated with this application shall not exceed what is allowed under Mason County Code 9.36. Operations shall start no earlier than 7:00 AM and shall end before 8:00 PM on a daily basis. X MINIMUM FPA STOMWATER and EROSION CONTROL The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field prior to site development. During the site development period, no disturbance beyond the flagged clearing limits shall be permitted. The flagging shall be maintained by the applicant/contractor for the duration of project. Stabilized construction entrances shall be installed at the beginning of construction and maintained for the duration of the project. Additional measures may be required to ensure that all paved areas are kept clean for the duration of the project. The ESC (erosion and storm water control) facilities shown on this plan are the minimum requirements for anticipated site conditions. During the site development period,these ESC facilities shall be upgraded as needed for unexpected storm events and to ensure that sediment and sediment-laden water do not leave the site.. This project will not disturb more than .75 acres or create more than 5,000 square feet of new impervious surfaces and the applicant SHALL provide a written narrative that meets the Minimum Requirements of the 2012 WSDOE Manual,which shall be adhered to once the permit is issued. X SLASH ABATEMENT This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW 76.04.600 and WAC 332-24-650. An extreme fire hazard could be created if one or more of the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of an existing structure and/or designated public use area, which is not owned by the owner of the fire hazard area. The landowner is fully liable in the event of fire,if he or she fails to appropriately abate the hazard. Extreme fire hazards shall be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural Resources(DNR). X SLASH ABATEMENT This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW 76.04.600 and WAC 332-24-650. An extreme fire hazard could be created if one or more of the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of an existing structure and/or designated public use area, which is not owned by the owner of the fire hazard area. The landowner is fully liable in the event of fire, if he or she fails to appropriately abate the hazard. Extreme fire hazards shall be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural Resources (DNR). X SEPA Environmental Checklist Mason County Permit Center Use: ❑ Single Family DNS: $600.00 SEP 20 1 ! - 606?J to Other DNS: 0 to 9.99 acres: $730 Parcel#: _1 aaa I-I- 14-- -IxL4' . 10 to 20 acres: $880 Over 20 acres: $1100 Date R RECEIVED ❑ DS/EIS: $5000+ $90 per hour MAY 14 2019 615 W. Alder Street Purpose of checklist. Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: Lhei This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. A. BACKGROUND �,z� 1. Name of proposed project, if applicable: Jhei 2. Name of applicant: c k � n 3. Address and phone number of applicant and contact person: help_] 3 Y Uyla7v SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11 4. Date checklist prepared: ;ram / /`/ 76j 9 5. Agency requesting checklist: LneiPll �y S�•� c S 6. Proposed timing or schedule (including phasing, if applicable): rnelpl SOv/U '4 S A I S C) i L 7. Do you have any plans for future additions, exinsion, or further activity related to or connected with this proposal? If yes, explain. hey Alln 8. List any environmental information you know about that has been prepared, or will be prepared, 4< directly related to this proposal. �nei"t N Cw t, 11114 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. L,ei l /(/A� 10. List any government approvals or permits that will be needed for your proposal, if known. [Lejpj (-07-114/ 11. Give brief, complete description of our proposal, it ludin the proposed uses and the size of , P p Y P p 9 P p the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) `q go, ��� tie 12c) ✓ J � � To OPPill LY horm -C , , T� . 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. t Parcel#(s): O L] o� Address: Legal Description: Twp/Range/Section and/or GPS location: T,�02 1Z 1 5 eC ( 7 SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 2 of 11 B. ENVIRONMENTAL ELEMENTS hei 1. Earth a. General description of the site �h (circle one): Flat, rolling, (Ell 7Y, steep slopes, mountainous, other: b. What is the steepest slope on the/site (approximate percent slope)? Lhem / z c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these Soils. rem plotev vucd circo-el . Loa " �b � C_ d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, INtC' � describe. iiielp e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. H CW ' f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hl e /- g. About what percent of the site will be covered with impervious surfaces after project C construction (for example, asphalt or buildings)? rheip qp✓r A 'Z-c"/6 h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: jheij S hc-I 1 YVJ-k-l-- IM I l%`m to VV% S k-W-WC�-v a E'va Si u/' Q ti C VA,"k &C, V-e� 2C►Z 2. Air ws a. What types of emissions to the air would result from the proposal during construction, operaf and maintenance when the project is completed? If any, generally describe and give _. approximate quantities if known. 1)I'4cff%lve b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. L;_�tLpj ✓�J c. Proposed measures to reduce or control emissions or other impacts to air, if any: Lhei GZ// SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11 3. Water a. Surface Water: ne! 1) Is there any surface water body on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream river it flows into. [i,elpl 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Lrreic, /v C) 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. ne( 4) Will the proposal require surface water withdrawals or .diversions? Give general description, purpose, and approximate quantities if kn wn. ltiegilpl 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. �i,e!p; /( /c) 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. Inelpl b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. ne!h /,-;C) 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. Jnti� c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. neip1 /lJ A SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 4 of 11 2) Could waste materials enter ground or surface waters? If so, generally describe. help] /,/C) 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: ®vim ti'� 4. Plants �ielp] a. Check the types of vegetation found on the site: iheipj 4 deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain orchards, vineyards or other permanent crops wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered?Lt,ei + , b c. List threatened and endangered species known to be on or near the site. lt2fji d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: (hulpl e. List all noxious weeds and invasive species known to be on or near the site. 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: lnc1 i birds: hawk, heron, eagle, songbirds, other: I LS /$1 I �'C S mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 11 b. List any threatened and endangered species known to be on or near the site. nt eM c. Is the site part of a migration route? If so, explain. Lid d. Proposed measures to preserve or enhance wildlife, if any: JneM i e. List any invasive animal species known to be on or near the site. ILI 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. 1r� b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. jhe_p] c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: jtei /`IY�YV--ram 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. ci,ei�; /V- 1) Describe any known or possible contamination at the site from present or past uses. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. /,,'U /--t-E- 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. 4) Describe special emergency services that might be required. F SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11 5) Proposed measures to reduce or control environmental health hazards, if any: b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? �,c4 1 G 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. jpj Uer 7 3) Proposed measures to reduce or control noise impacts, if any: ih,et jChMl`� 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. n f?QS 16G1 1 'I( tA��r b. Has the project site been used as working farmlands or working forest lands? If so, describe. /v 0 How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? [nel 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: c. Describe any structures on the site. 1hei d. Will any structures be demolished? If so, what? jr,�1 e. What is the current zoning classification of the site? ,ri!pi S f. What is the current comprehensive plan designation of the site? h SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 7 of 11 g. If applicable, what is the current shoreline master program designation of the site? ILeIPJ h. Has any part of the site been classified as a critical area by the city or county? If so, specify. i. Approximately how many people would reside or work in the completed project? nl e U j. Approximately how many people would the completed project displace? nr eEp1 k. Proposed measures to avoid or reduce displacement impacts, if any: Lll L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Lrazi�, m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. /_/ (J -Af b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. (he+ c. Proposed measures to reduce or control housing impacts, if any: 1nei 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? r� /UP71T b. What views in the immediate vicinity would be altered or obstructed? [tLei l c. Proposed measures to reduce or control aesthetic impacts, if any: mei 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur?rng1i /'J C� b. Could light or glare from the finished project be a safety hazard or interfere with views? be SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11 c. What existing off-site sources of light or glare may affect your proposal? n[ tl d. Proposed measures to reduce or control light and glare impacts, if any: [help] 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? iel,, A ) /,4- b. Would the proposed project displace any existing recreational uses? If so, describe. news /L/t:--) c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: of eM 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. [oeip b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. 1L!-,; c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surreys, historic maps, GIS data, etc. b]gito I,U 151)A 12() d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. �Y o,,,A(A 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. (!2� SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 9 of 11 b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop?ILtIpi c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate?Lh ,1 j d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). Leipl 1 e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. nei 1 f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? Ihejpl g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. h. Proposed measures to reduce or control transportation impacts, if any: LiEV] AJ'a 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. [neip S b. Proposed measures to reduce or control direct impacts on public services, if any. ['eIs_ 16. Utilities a. Circle utilities currently available at the site: r�ti electrici natural gas, water, refuse service, telephone, anitary sewer, septic system, other SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11 b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. ; )e1�j C. SIGNATURE The above answers are true and compile e best of my knowledge. I understand that the lead agency is relying on them to make ' d sion. Signature: Date Signed: M j y 20 g r Print Name of Signee: O D �S If applicable, Position and Agency/Organization: Date Submitted: s- V- 2G SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11 MASON COUNTY DCD SEPA Contact List Sent SEPA 7o � — 0,36 to(check all that apply) on } Skokomish Tribal Nation,Nat.Res.Dept. WA Department of Commerce ATTN: Julian Sammons reviewteam@commerce.wa.gov N 541 Tribal Center Rd.,Skokomish Nation,98584 jsammons@skokomish.org U.S.Army Corps of Engineers dsarff@skokomiosh.org SEPA Reviewer-Jason Sweeney Skokomish Tribal Historic Preservation Officer PO Box C-3755,Seattle,98124 ATTN: Kris Miller Jason.t.sweeney@usace.army.mil 80 N Tribal Center Rd,Skokomish Nation,98584 shlanay'l@skokomish.org WA Dept.of Fish and Wildlife Quinault Indian Nation SEPAdesk@dfw.wa.gov ATTN: Mark Mobbs O Box 189,Tahola,98587 WA Dept.of Fish and Wildlife Efmmobbs@quinault.org ATTN: Chris Waldbillig Squaxin Tribal Nation,Natural Res.Dept. 450 Port Orchard Blvd,Suite 290 2952 SE Old Olympic HWY,Shelton 98584 Port Orchard,WA 98366 jdickison@squaxin.us Chris.waldbillig@dfw.wa.gov emarbet@squaxin.us szaniewski@squaxin.us ED WA Dept.of Fish and Wildlife rfoster@squaxin.us ATTN: Darrin Masters The Confederated Tribe of the Chehalis 450 Port Orchard Blvd, Suite 290 ATTN: SEPA Reviewer-Glen Connelly Port Orchard,WA 98366 420 Howanut Rd., Oakville, 98568 Dar,in.Masters@dfw.wa.gov gconnelly@chehalistribe.org WA DNR,South Puget Sound Region WA Dept.of Fish and Wildlife 950 Farman Avenue N, Enumclaw,98022-9282 ATTN: Allison Cook southpuget.region@dnr.wa.gov (Habitat Biologist-S Puget Sound Watershed) WA DNR,Aquatic Resources 1111 Washington St SE,Olympia WA,98501 O BOX 47027, Olympia, 98504-7027 allison.cook@dfw.wa.gov and@dnr.wa.gov WA DNR,SEPA Center ED WA Dept.of Transportation ATTN: External Coordinator ATTN: Dale Severson O BOX 47015,Olympia,98504-7015 P.O. Box 47440, Olympia 98504-7440 sepacenter@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov Olympic Region Clean Air Agency ATTN: Lauren Whybrew City of Shelton 1,2940-B Limited Ln. NW,Olympia.98502 ATTN:Jason Dose lauren.whybrew@orcaa.org 525 West Cota St.,Shelton 98584 QjMason County Transit jasond@ci.shelton.wa.us ATTN: Danette Brannin 790 E Johns Prairie Rd,Shelton,98584 Port of Shelton dbrannin@masontransit.org ATTN: Brandon Palmer Mason County PUD#1 21 West Sanderson Way,Shelton 98584 ATTN: Darrin Hall andonP@portofshelton.com N 21971 Hwy 101,Shelton,98584 darrinh@mason-pud1.org ZD,pt of Archaeology&Historic Preservation Mason County PUD#3 P.O. Box 48343,Olympia,98504-8343 TTN: Kristin French SEPA@dahp.wa.gov kristin.french@masonpud3.org WA Department of Ecology Tacoma Public Utilities-Real Property Services Environmental Review Section ATTN: Dave Letterman PO BOX 47703, Olympia, 98504-7703 3628 S 35th St,Tacoma, 98409-3192 separegister@ecy.wa.gov dletterm@cityoftacoma.org 0 WA Department of Health Mason Cty P.W.ATTN: ATTN:Joe Laxson joe.laxson@doh.wa.gov 0 Mason Cty E.H.ATTN: . Other: 0 Mason Cty Bldg ATTN: Agent: Applicant: Q School District: MC DCD last updated on 2/28/19 rv-�, , Yj z > I C//, 2 gee op n 2ocfk l� C6 r 2, I no,✓e Flk� c'�Cf/.X✓/ Be v .,<P�.. ,.=c/e-1' 2 , 3 /✓ ✓6 U N/ n ��D�s s fly 12 �� -07 \122171400041" 122171390103 122171390102 \ 122171490041 122171490042 171490041 4 122170060000, A c 1 f 1221714900 2 ( ` � t ` � T. � l t � (T22NR1 W, 1 ti G ` l 122171490043 t l 122170060000 122171490044 Nam, ,yam 1r ' �0GA 122174200010 122174100030 122174200110 u S 1 inch = 100.62 feet l W. .E �v� CCU 7Glq d� }� Q 1 inch =0 miles _ \ .y, 6 �'�S"� •�i� �� � f � � ��A + b a - sir + • b� :� 6 �.� a i•v J. 1r• }i. { . OF yy i z� R 1 r +i.t. l r � I ..4 s r jF �>� OT ti.. 4 !:L4- m • a f',.r.. q e �. +��.. O.. - it•, . '!1'•r '�J' 1 L! ��'F, K' rq •� t ' A +rrs � t yr ti + 7 'Q a 4 � r w J r .w a �F i • � `x � All [ 111 i11"r� •S .�• r r; r i • ,ice, .. ,,F+S '!. .y ' . '� IN • � r x k4l, is � e�Lr AV y i I ``0 Page 1 of 1 Michael MacSems - Re: Mason County SEPA 19-36 Rodius From: Allan Eaton To: Michael MacSems Date: 7/8/2019 8:32 AM Subject: Re: Mason County SEPA 19-36 Rodius CC: Diane Sheesley; Fred Perryman PW has no comment on this SEPA application. Allan L. Eaton II Mason County Public Works Assistant Road Operations & Maintenance Manager Phone: (360) 427-9670 Extn.784 Fax: (360)427-8448 Email:AllanE@co.mason.wa.us Mail To: 100 W Public Works Drive Shelton, WA 98584 >>> Michael MacSems 7/1/2019 11:36 AM >>> Please find attached Mason County SEPA DNS for: Applicant:John W Rodius Project: Class IV G FPA Location: North Bay Rd, Allyn, WA County Contact: Michael MacSems, mms@co.mason.wa.us Comment Deadline:7/15/2019 Thank you, Michael file:///C:/Users/mms/AppData/Local/Temp/XPgrpwise/5D22FF93 Masonmail 100161346213... 7/8/2019