HomeMy WebLinkAboutFPA2019-00008 - FPA Permit / Conditions - 7/18/2019 Mason County
Planning Division of Community Development
� pl
615 W.Alder St. Bldg. 8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
FPA2019-00008 FOREST PRACTICES
PROJECT DESCRIPTION: FOREST PRACTICE APPLICATION TO LOG ISSUED: 07/18/2019
75 ACRES OF A 4 ACRE PARCEL
SITE ADDRESS: 801 E NORTH BAY RD ALLYN EXPIRES: 07/18/2021
PARCEL: 122171490042
APPLICANT: JOHN W RODIUS OWNER: JOHN W RODIUS
P O BOX 334 P O BOX 334
UNION,WA 98592 UNION,WA 98592
1.360.670.1217
FEES: Paid Due
Forest Practice Review $300.00 $0.00
Totals : $300.00 $0.00
CONDITIONS
* ARCHAEOLOGICAL RESOURCES
Archaeological or historical resources, such as ruins, sites, buildings, artifacts,fossils, or other objects of antiquity that may
have significance from an historical or scientific standpoint,which may be encountered by the developer/contractor, shall not
be further disturbed. If the developer/contractor encounters any such artifacts, he/she shall immediately stop work and notify
Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result
in civil penalties.
X
* HOURS OF OP:�ith
TI
Noise associat this application shall not exceed what is allowed under Mason County Code 9.36. Operations shall
start no rli Zan 7:00 AM and shall end before 8:00 PM on a daily basis.
i
X
Printed by:Ariane Paysse on:07/1B/2019 01:10 PM
Page 1 of 2
Mason County
e �1
z � F^ Planning Division of Community Development
615 W. Alder St. Bldg. 8
{� Shelton, WA 98584
-- 360-427-9670 ext 352
www.co.mason.wa.us
FOREST PRACTICES FPA2019-00008
MINIMUM FPA STOMWATER and EROSION CONTROL
The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field prior to site development. During
the site development period, no disturbance beyond the flagged clearing limits shall be permitted.The flagging shall be
maintained by the applicant/contractor for the duration of project.
Stabilized construction entrances shall be installed at the beginning of construction and maintained for the duration of the
project. Additional measures may be required to ensure that all paved areas are kept clean for the duration of the project.
The ESC (erosion and storm water control)facilities shown on this plan are the minimum requirements for anticipated site
conditions. During the site development period,these ESC facilities shall be upgraded as needed for unexpected storm
events and to ensure that sediment and sediment-laden water do not leave the site.
This project will not disturb more than .75 acres or create more than 5,000 square feet of new impervious surfaces and the
applicant SHALL provide a written narrative that meets the Minimum Requirements of the 2012 WSDOE Manual, which shall
be adhered to once the permit is issued.
X
SLASH ABATEMENT
This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an
extreme fire hazard under RCW 76.04.600 and WAC 332-24-650.An extreme fire hazard could be created if one or more of
the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of
an existing structure and/or designated public use area, which is not owned by the owner of the fire hazard area.
The landowner is fully liable in the event of fire, if he or she fails to appropriately abate the hazard. Extreme fire hazards shall
be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural
Resources (DNR).
X
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating'construction or the performance of construction.
Issued By: � �-
X.
Contractor or Authorized Agent: Date:
7--/q -- 70�]
Printed by Ariane Paysse on:07/18/2019 01.10 PM
Page 2 of 2
RECEIVED
MASON COUNTY
aq AY 14 2019
COMMUNITY SERVICES
Building,Planning,Environmental Health,Community Health
15 W. Alder Street
615 W.Alder St.-Bldg.8,Shelton,Wa 98584 F PA O( - noo0F)
Phone:(360)427-9670 ext.352♦ Fax:(360)427-7798
FOREST PRACTICES APPLICATION/NOTIFICATION
Type IV General
This application should be accompanied with an Environmental Checklist(SEPA)as well as an activity map/site plan which addresses
items listed below.
TYPE OR PRINT IN INK:
1. Landowner Timber Owner and O erator information.
Legal Name of LANDOWNER Le al Name of TIMBER OWNER Legal Name of OPERATOR
k►` , !' k h ,
Mailing A dress: Mailing Address: Mailing Address:
-/ 0a A v X 3
City,State,Zip dity,State,Zip City,State,Zip
aAj1e1v%j ioyrh ,7 ,77011 1^14
Phone
Phone( ) Phone('�r O-6,7d _/ �L0)6 -676
—IZ17
Email: J� �67Q 1 Z Email: (p Email:
2. Contact person information. Wuv, (4 C1 U I Z S )j`
Contact�Person O Phone( ) � G 7� - z 1 7
3 O VX 126d [ Email:
3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: D 7 q 1176
For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829.
4. Legal description where the forest practices will occur.
Parcel Number Sub Division '/.'/. Section Township Range E/w
5. Answer Bch question as it applies to your proposed forest practice.
a. No. [] Yes. Is the activity within an urban growth area?
b. o. [] Yes. Is the activity within a public park? NO
C. ' No. [ Yes. Is the activity within 500 feet of a public park? Park name:
d. []No. { Yes. Is the activity located on lands platted after January 1, 1960?
e. )(No. [] Yes. Is the activity within 200 feet of saltwater lake river/creek/stream pond
wetland seasonal runoff slopes which exceed 15%?
f. What is the expected duration of F A?
Proposed start date: Qrfrl Proposed end date:
6. Are you cuttin or remoVing timber?
[]No. Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the
activity map.
Rev.August 2017
Acres Volume to be Steepest Slope in
Unit# Harvest Type Yarding Method net Harvested mb Harvest Unit
�utic v
7. Are you constructing or abandoning roads?
�No. [] Yes. Complete the table below. Show locations and identify all road activities on the activity map.
Total Length Steepest Side Slope Abandonment Date
Type of Activity feet % MoNr
Road Construction b Does Not Apply
Temporary Road Construction
Road Abandonment
Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife
(WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm.
8. Are you installing or replacing water-crossings?
[]No. [] Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map.
Crossing Crossing Dimensions Crossing Crossing Dimensions
Identifier Type width x length) Identifier Type width x length)
9. Mark the following activities that will be done in or over typed water.
Activity in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream
Removing culverts of bridges
Equipment crossing
Ground skidding
Suspending cables
Cable yarding
Falling and bucking
Other
l o. I y activity in a wetland or wetland buffer?
No. [] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map.
Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area
Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres)
other
11. Describe how the following are identified on the ground.
• Harvest boundaries/unit comers:
• Right-of-way limits and centerlines for road work,culverts and bridges:
• Critical areas and critical area buffer boundaries:
Page 2 of 4
12. Have you reviewed this 1 forest practices activity area to determine whether it may involve historic sites and/or Native American
cultural resources? 1py,
o. [] Yes.
13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest
Practices Act and Rules an - ason County Forest Practices Conversion Ordin ce as well as all other federal,statp or local
regulations. Complian 'th the Forest Practices Act and Rules and the M6on County Forest Practices Conv sion Ordinance
does not ensure co iance with the Endangered Species Act or oth deral state or local laws.
Signature o WNER Signature of T O R Signature o ' OR
(if different th wn (If differ that downer)
S e)k R c-4
/ate:
e: � 7� R ► S Print name: �DID►� 1��( 1 ✓-S Print name: .,�Date: O Date: / ` - G
Additional information: (Optional)
Per Mason County Ordinance 11.05,Section 11.05.120,a site map shall accompany this application which includes the
following information.
I Harvest boundaries and tree retention areas.
II The approximate location of any structures.
III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads,and landings
within the proposal.
IV The location of future land development including stormwater management facilities and vegetation to be retained
for site landscaping,open space,wildlife habitat, screening,and/or buffers.
V Site topography at contour intervals of 40 feet.
VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance.
VII Drainage ways and culverts.
VIII Site area targeted for further harvest including proposed timing.
IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet.
Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification.
Page 3 of 4
t
NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion
control review.Projects which disturb more than one acre(regardless of total lot size)will require an engineered
stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE
Stormwater Manual.Applicants will be charged for Public Works staff time to review these plans and applications.
Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a
NPDES(National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to
Mason County's threshold.WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is
not a perquisite for FPA approval.It is the responsibility of the applicant to obtain this permit when required.
FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730
10 to 20 Acres$880
Over 20 Acres$1,100
EIS(DS)$5,000+90/hr
Departmental Review
(For Office Use Only)
Site visit:
Date approved: <l
Masola County Community Services
Page 4 of 4
122171400041-
122171390103 122171390102
122171490041
122171490042
171490041
L
1221700600001
to
rF �� i �1 m
122171490012
122171490043 �.
122170060000• ��
� 122171490D44 ,- Vv - ,
0 m ��OWN moo,
W
122174200010
122174100030
122174200110
N
" I'(d S 1 inch = 100.62 feet i
w E CcVj 7CJlr1 d,
_0
1 inch = 0 miles
FINDINGS OF FACT
FPA Case# 2019-00008
APPLICANT: John Wayne Rodius
APPLICATION DATE: May 14, 2019
Mason County has reviewed the above referenced application for Class IV General Forest
Practices and finds it in conformance with all applicable County land use regulations in
effect at the time of application.
FINDINGS
The proposed FPA is compliant with the following conditions:
The proponent has paid the prescribed fees.
The proponent has filed a complete, signed application.
A map has been received that complies with the requirements of 11.05.120:
(I) Harvest boundaries and tree retention areas.
(II) The approximate location of any structures.
(III) The location of all existing and proposed streets, right-of-ways, easements, skid
roads, haul roads, and landings within the proposal.
(IV) The location of future land development including stormwater management
facilities and vegetation to be retained for site landscaping, open space, wildlife
habitat, screening, and/or buffers.
(V) Site topography at contour intervals of 40 feet.
(VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas
Ordinance.
(VII) Drainage ways and culverts.
(VIII) Site area targeted for further harvest including proposed timing.
(IX) North arrow and scale shall be shown on all site plans. The scale shall be no
smaller than one inch to 200 feet.
That this FPA is in conformance with the following Mason County ordinances:
11.05
That the proposed FPA involves .75 acres on a 4-acre parcel.
That the notifications required by 11.05.060 have been made if applicable.
Note: Harvest unit is greater than 500 ft from a State Park.
Mason County Resource Ordinance
I
_X_That at the issuance of this permit will not result in a violation of the Mason
r County Resource Lands and Critical Areas Ordinance. The site was inspected by
Michael MacSems of the Mason County Planning Department who determined
that any critical area buffer and/or steep slope issues have been resolved.
Geo-Technical Report/Assessment Review
A Geo-Technical__ Assessment_Report(check one) was written by
and a submittal checklist was approved by Michael MacSems
of Mason County DCD on_
N/A
Washington State Department of Transportation
_X_A DOT Access Permit is not required for this proposal.
A DOT Access Permit is required for this proposal.
Date Approved by DOT:
Mason County Road Access Permit
Road Access Permits 19-38 was issued by Mason County Public Works on
6/28/2019.
Shoreline Master Program
That, if applicable, all activity under this application are in conformance with the
Mason County Shoreline Master Program and has a shoreline designation of N/A.
State Environmental Policy Act
This application for FPA#2019-00008:
_X_Has been reviewed for SEPA compliance under case#: SEP 2019-00036.
Is SEPA exempt.
X DNS
MDNS
Stormwater Management
A Stormwater and Erosion Control plan written to the specifications of the 2012
WSDOE Stormwater Manual by , as well as a submittal
checklist was reviewed Michael MacSems of DCD and he approved a submittal
checklist on
Submitted narrative for Minimum Requirements 1-5.
2
Permission from Underlying Property Owners: 4
Y
Yes—Signed by John Rodius.
CONCLUSION
In conclusion, this application for Class IV General Forest Practices is consistent with the
above criteria and that the public uses and Mason County has fulfilled its statutory
obligations.
RECOMMENDATIONS
I,being the Director of the Mason County Community Services,hereby attest to and
certify that appropriate provisions have been made for this Class IV General Forest
Practices Application and hereby recommend approval. In addition to these facts
evidenced by the contents of the file for this Forest Practice Application.
Signed,
David indoor, Director Community Services Dept. Date
hjWV , � T7/I 6 /1
Mid ael MacSems, #PA Reviewer Date
3