Loading...
HomeMy WebLinkAboutBLD2006-01944 Addition - BLD WSEC - 3/16/2007 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMEN , `.-. WSEC/VIAQ Compliance Application `�Q, Owner: �' Telephone: Y� � a� Parcel#: A t/ I Type of project ( ) New Residence ( dt`)Addition ( ) Remodel Total Sq. Ft. 1S Floor : 2"d floor: Heated Basement: of heated area:: E- Heating System Type: O Electric wall heater O Electric Central Furnace O LPG Furnace O Heat Pump with electric furnace O Heat pump with gas furnace O Boiler, specify fuel type: O Other: Specify Glazing O Prescriptive Option see reverse side circle one: 1 II IV Percentage: Compliance Method O Component Performance , Chapter 5— Calculation worksheets required Check one:: O S stems analysis, Chapter 4 O Whole House Ventilation system O Whole House Ventilation using a Heat Ventilation using exhaust fans&window or wall fresh air Recovery Ventilation System (VIAQ 303.4.4) System vents (VIAQ 303.4.1) Check one O Whole House Ventilation Integrated O Whole House Ventilation using an inline with a Forced Air System (VIAQ 303.4.2) supply fan. VIAQ 303.4.3) Window & Door Schedule (if needed, attach an additional sheet) Total Manufacturer Room/location U-Factor Size Quantity Square Feet Windows: Windows: Total Sq. ft. y Doors: Doors: Total Sq. Ft Total window and door area Total window & door area /(divided by) total sq. ft of heated area = %of glazing MAY-25-07 FRI 07 :36 OLYMPIC HEATING 13604277466 P. 01 Rhyac-t~Z"Wriliul&Light Commercial HVAC Loads Elite Software Devsla�Ya4htsLrlc. C3f�t lc Heating.� '"Prig ot+�lon;YYA 995ti4 N � Total Building Summary Loads ompgri�rnt ,area 'son Lat. Set, 'Ft l a.�stlon Ovan loss: _... . Clain ..... _ 6" ita Un 3A-v-o: C:lazing-golal>le pane low a(e= 0.40), operable 255 6,757 0 12,716 12,716 window, vinyl frame, u-value 0,53 11P: poor-polyurethane Core 40.5 588 0 306 306 12E-0stiv: Wall-Frame, R-19 insulation in 2 x 6 stud 1224.5 4,163 0 1,449 1,449 cavity, no board insulation,siding finish, wood studs . 168-33: Roof/Ceiling-Under attic or knee wall,Vented 1032 1,342. 0 1,342 1,;42 Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-38 insulation 20P-19: Floor-Over open crawl space or garage. Passive, 1672 4,180 0 836 83£ R-19 blanket insulation, any cover Subtotals for structure: 17,030 0 16.649 16.649 People: 0 0 0 0 Equornent: 0 0 0 Lighting: 0 0 0 Ouctwork: 6,394 -406 5,691 5,285 Infiltration: Winter CFM: 201, Summer CFM: 89 10,950 -1,213 1,946 733 Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Total Building Load Totals: 34,374 -1,619 24,286 22,687 C ck,.iquvlas Total Building Supply CFM: 1,113 CFM Per Square ft.. 0.G65 Square ft. of Room Area: 1,672 Square ft. Per Ton: 636 Volume(ft") of Cond. Space: 13,376 Air Turnover Rate(per hour): 5.0 Total Healing Required With Outside Air: 34,374 Btuh 34.374 MBH Total Sensible Gain: 24,286 Btuh 107 % Total latent Cain: -1,619 Btuh -7 % Total Cooling Required With Outside Air: 22,667 Btuh 1,89 Tons (Based On Sensible* Latent) s _. . .... _ .. ... . 2.63 Tons (Based On 77%Sensible Cepacity) F�otas Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. is C'ElitF!lRhvacw\Projects\johansonpaul.rhv Wednesday, April 25. 2007. 7.20 AM f JACK FROST CONST. 1511 DICKINSON AVE.E. SHELTON,WASH.98594 WASHINGTON INSULATION 8535 COMMERCE PLACE DRIVE NE.#E LACEY, WASH.98516 RE:PAUL JOHANNSON 71 E. SPRINGWOOD LANE SHELTON,WASH.99584 TO WHOM IT MAX CONCERN: WASHINGTON INSULATION WAS CONTRACTED TO INSULATE ABOVE DWELLING AND WAS DONE SO. ALL WORK INSTALLED TO CODE IN A WORKMAN LIKE MANNER. ALL WALLS (2X6)WITH R21,ALL WALLS(2X4)WITH 3.25"THERMAX R20.6,FLOOR WITH R30 AND TWINED, ALL CEILING AREAS WITH R38 BATTS,BAFFLES INSTALLED PER CODE,THERM,AX RI O AT HEADERS, AIR SEAL PACKAGE TO N.W.E.CODE AS WELL. ALSO SUPPLIlED AND INSTALLED 6 MIL.BALCK GROUND COVER HERB NORQUIST-SALE REP.-WASHINGTON INSULATION 1(900)287.9587 X106 3\16\07 i k in T i u'TnCM T LJQ4M 0 T J G1G1�/4 L/t'Gl 1 JACK FROST CONSTRUCTION, INC. 1511 Dickinson St. Bus. 426-0953 Shelton WA 98584 Fax 426-4227 jfc.inc@telisphere.com I, Paul Johanson, owner of the home at 71 Springwood Lane, witnessed the installation of insulation: R21-walls, R-38 ceiling and R-30 under floor of addition. IP7 Paul Johans , owner Date I, Jack Frost, builder of addition on the home at 71 Springwood Lane, witnessed the installation of insulation: R21-walls, R38- ceiling and R30-under floor of addition. 1 Jack Fro t Date