MIS99-0809 PARCEL :420125500018 PLATsSPPL0 DIV : BLK : LOT : 16
JOB ADDRESS : 211 E SPRiNGWOOD DR SHELTON
APPLICANT : DAVID SCOTT 432-1625
OWNER : DAV I D SCOTTT 432- 1625
LEGAL : SPAIN6NOOD LOT 18 8 TO 15 Of NE NN TO 1 01' SP 1691 SEE SUR`� 6/68 PD M�EXpIRAT10N
PROJECT DESCRIPTION : rlUL`��tolo(
install furnace and Water heater IDA,fE -"
PROJECT LOCATION %
HWY 101 N TO AIRPORT GROCERY RIGHT ON SPRINGS RIGHT TO SPRING DRIVE LEFT TO SITE
PROJECT NOTES %
TYPE AMOUNT BY DATE RECEIPT
PLFE: $ 7 .00 NJP 12/20/99 52365
MCFE T 13 .25 NJP 12/20/99 52365
MCFE $ 5 .50 NJP 12/20/99 52365
MCBS S 22 .00 NJP 12/20/99 52365
TOTAL : 67 . 75 OWNER OR AGENT DATE:
NIS _PINT, rev: 04If1192 COMPLIANCE TO ATTACHED'CONDITIONS IS
REQUIRED
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D W WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
iL
L
J
MASON COUNTY
Mason County Bldg. III 426 W, Cedar
P.O. Box 186 Shelton, Washington 98584
f
PE Rf%A i T C 0 r4 D 1 11- 1 C7Nc:;
Case No . : M 1599--0809
For : DAVID SCOTT
Pages 3 1
1 ) PURSUANT TO 1997 UNIFORM BUILDING CODE , ALL SITE MUST BE MARKED WITH APPROVED NUMBERS
OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT
THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED
ON RATES ADOPTED FEE SCHEDULES AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF
7 n? ngWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS .
X
2 ) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL. CODES AND UBC
REQUIREMENTS
x
11 ) installation of heating equipment in single family residences shall meet the
requirement of the 1991 WSEC . The furnace to be Installed shall not exceed 150% of the
heating design Iliad or prescriptive requirements of Chapter 9 . Furnace efficiency
shall be .78 AFUE or higher . Ducts shall be taped , sealed and mechanically fastened
with a minimum of 3 fasteners per Joint . Ducts shall be insulated to R-8 .
,;ONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date b date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg, III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
X.
4 ) ALL FURNACE INSTALLATIONS SHALL. MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE 1994
WASHINGTON STATE ENERGY CODE (WSEC ) . ANY PORTION OF THE MECHANICAL SYSTEM THAT IS
ALTERED OR REPLACED SHALL. MEET THE MINIMUM STANDARDS SET FORTH IN THE 1994 W4EC AND
1997 UNIFORM MECHANICAL CODE . X
5 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE .x
6 ) Fuel piping shall be Inspected after the installation of gas piping is complete , and
before the attachment of fixtures , appliances , or shut-off valves . At the time of
inspection the test pressure shall be no less than 10 psi held for no less than 15
minutes . Appliances attached to the piping shall not be used until the final inspection
has been approved by the building inspector .
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D W WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
Conditions of this Case are listed below:
Case No.:MIS99-0809
1 ) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITE MUST BE MARKED
WITH APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS
TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING
THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS
BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A
REINSPECTION FEE, BASED ON RATES ADOPTED FEE SCHEDULES AND THE
1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR
FAILS POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS.
X
2) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL. CODES AND UBC
X MENTS
X
3) Installation of heating equipment in single family residences
shall meet the requirement of the 1991 WSEC. The furnace to be
installed shall not exceed 150% of the heating design load or
prescriptive requirements of Chapter 9. Furnace efficiency shall
be .78 AFUE or higher. Ducts shall be taped, sealed and
mechanically fastened with a minimum of 3 fasteners per joint.
Ducts s I be insulated to R-8.
X
4) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET
FORTH IN THE 1994 WASHINGTON STATE ENERGY CODE (WSEC). ANY
PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL
MEET THE MINIMUM STANDARDS !,E�rTH IN THE 1994 WSEC AND 1997
UNIFORM MECHANICAL CODE. X
5) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON
COUNTY BUIJ_ I DEPARTMENT AND UNIFORM BUILDING
CODE.x
6) Fuel piping shall be inspected after the installation of gas
piping is complete, and before the attachment of fixtures,
appliances, or shut-off valves. At the time of inspection the
test pressure shall be no less than 10 psi held for no less than
15 minutes. Appliances attached to the piping shall not be used
until the final inspection has been approved by the building
inspector.
i
FORM MUST BE COMPLETED IN INK PERMIT NO.:
PLEASE PRESS HARD MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar/P.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968
APPLIC T INFO_RMATI N CONTRACTOR INFORMATION
Owner Contractor NameC c_
Mail Add ess fi Mailin Ad r ss
Cit Stat Zip ode City $tat p Code
Phone - ther Ph.( Ph. - ther Ph.(
Lien/Title Holder Contractor Reg. 4 0 P
Address Expiration
SEPTIC INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System Name of
Sewer System
PARCEL INFORM ON-12 digit Tax Parcel No. �- , I /45 / b Fire District
Legal Description If
Site Address(Please include eet name, street number and city)
Directions to site
Is your property within 200' of the following: Body of Water(Name) Saltwater
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs
TYPE OF JOB New Add Alt Repair Other Use of Building
Location of Fixtures/Units 1st Floor 2nd Floor Basement Garage Closet
PLUMBING FIXTURES(Show Number of each) MECHANICAL UNITS Fuel Type: Electric
Type of Fixture No. of Fixtures Fees LPG Natural Gas_J Heatpump
Toilets Type of Unit No. of Units Fees
Bath Basins Furnace
—
Bath Tubs Heatpumps
Showers Vent Fans
Water Heater �_ Propane Tank
Laundry Wsher Gas Outlets
Sinks Wood/Gas/Pellet Stove
Dishwasher Direct Vent?
Other Other
Other Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTURE/UNIT.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-1 certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work
confor ance therewith. No chapges shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without
appr a first obtaining approval.
Dat X Date
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by Date Submittal Amount Due Receipt No. cal
...
DE#"ARTfVif+1TAE:R E1N RPts OVEI): . . Q 'IE#3 GAf�t DES::
Building Department r
Occ Group Type Constr.
Planning Department
Other
Other
.: . . ::.::.;.:.....
DES: .
....................................................................................................
Permit Fee Site Inspection
Plan Review Fee UFC Plan Review Fee
Plumbing&Base Fee Other
Mechanical&Base Fee Other
Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal ( )
Violation Fee TOTAL FEES