Loading...
HomeMy WebLinkAboutBLD2002-01204 - BLD WSEC - 11/4/2002 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT WSEC/VIAQ Compliance Application Owner n �y elephone: �3 Parcel#: f— �1 2, Type of proje (� New Residence ( ) Addition ( ) Remodel Total Sq. Ft. >/� 1 s Floo r:�� 2" floor: Heated Basement: of heated area:: Heating System: &-.)q/,t" Glazing Prescri tive Option see reverse side circle one: I " II III Percentage: Compliance Method O Component Performance , Chapter 5— Calculation worksheets required I oho Check one:: O Systems analysis, Chapter 4 Whole House Ventilation system O Whole House Ventilation using a Heat Ventilation sing exhaust fans&window or wall fresh air Recovery Ventilation System (VIAQ 303.4.4) System vents (VIAQ 303.4.1) Check one O Whole House Ventilation Integrated O Whole House Ventilation using an inline with a Forced Air System (VIAQ 303.4.2) supply fan. VIAQ 303.4.3) Window & Door Schedule (If needed, attach an additional sheet) Total Manufacturer Room/location U-Factor Size Quantity Square Feet Windows: 4/-•4%�E G/,� a 6,4FF - 3 3 `,<3 a 1 C( Windows: Total Sq. ft. Doors: �n Sod/ &iVT (o a Doors: Total Sq. Ft Total window and door area Total window & door area I3 q /(divided by) total sq. ft of heated area DU = /-3 %of glazing MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Permit Assistance Center SHELTON (360) 427-9670 BELFAIR (360)275-4467 SEATTLE (206)464-6968 ELMA(360)482-5269 FAx: (360) 427-7798 WEB SITE: www.co.mason.wa.us P.O. Box 186, SHELTON 98584 2001 Washington State Energy Code (WSEC) effective July 1, 2002 2000 Ventilation and Indoor Air Quality Code (VIAQ) Code Compliance Application Form i The following information will be required for the WSEC and VIAQ plan review: 1. Complete the Washington State Energy Code/ Ventilation and Indoor Air Quality Code (WSECNIAQ)application located on the reverse side. 2. Complete the window and door schedule on the reverse side. Include all windows, skylights, sliding glass doors, french doors and any door that is more than 50% glass. Use rough opening dimensions of the windows and doors. Information about the U-factor of the window will also help to expedite the energy code review. If you are complying with the WSEC by prescriptive path and are using the area weighted average method you must include your calculations. 3. On your building plans note the location and fuel type of water heater, location of exhaust fans (bathroom, laundry, kitchen, etc.) and R-factor of insulation proposed for walls, floors, ceilings and slabs, 4. Questions? Call Mason County Community Development at (360) 427-9670 ext. 284. Additional WSEC and VIAQ compliance information is available on the internet at: www.energy.wsu.edu/buildings/ Prescriptive Requirements °'for Group R Occupancy Climate Zone 1, Table 6-1 Glazing Glazing U-factor Wall Wall Wall Area %of Door Ceiling Vaulted Above interior4 exterior Slab 4 Option Floor U s 2 Ceiling3 Grade below 4 Below Floors on ,0 Vertical Overhead Factor t2 grade Grade Grade I 12% .35 .58 .20 R-38 R-30 R-15 R-15 R-10 R-30 R-10 II* 15%" .40 .58 .20 R-38 R-30 R-21 R-21 R-10 R-30 R-10 III Unlimited Single Family Res .40 .58 .20 R-38 R-30 R-21 R-21 R-10 R-30 R-10 (R-3)Only 'Reference Case/Call (360)427-9670 ext.284 for footnote information. Log&solid timber wall with a min. avg.thickness of 3.5"are exempt from the above grade wall insulation requirements.