Loading...
HomeMy WebLinkAboutBLD2008-00512 Heatpump - BLD Permit / Conditions - 5/1/2008 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 i� RESIDENTIAL BUILDING PERMIT BLD2008-00512 OWNER: JODY SCOTT RECEIVED: 5/1/2008 CONTRACTOR: ALL SEASONS INC. 879-9144-278-9144 LICENSE: ALLSEI*03055 EXP: 12/17/2009 ISSUED: 5/1/2008 SITE ADDRESS: 181 E OLYMPIC CT ALLYN EXPIRES: 11/1/2008 PARCEL NUMBER: 122175100020 LEGAL DESCRIPTION: LAKELAND VILLAGE#11-A LOT: 20 PROJECT DESCRIPTION: DIRECTIONS TO SITE: HEAT PUMP (EXISTING FURNACE) HWY 3 TO LINE DRIVE W TO E OLD RANCH RD NORTH ON OLD RANCH TO E OLYMPIC CT W TO ADDRESS General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: MEC Fire Dist.: 5 No.of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Water Body: Make: Length: Ft. Front: Ft. Shoreline: Ft. SEPA?: Rear: Ft. Slope: Ft. Shoreline Desi Model: Width: Ft. Side 1: Ft. g Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Heat Pump 1 Mechanical Fee TAM 5/1/2008 $17.00 B12008000 Mechanical Base Fee TAM 5/1/2008 $26.60 B12008000 Total $43.60 BLD2008-00512 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2008-00512 CONDITIONS FOR BLD2008-00512 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are pot tial risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-64770982 The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) Owner/Age responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. x n 3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revo do . X 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall���ade prior to requesting additional inspections. X 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Count rdirtances and building regulations. 6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prev 9 tion from being taken. No more than one extension may be granted. X BLD2008-00512 Please referto the following pages for conditions of this permit. 2 of 3 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The er or the agent he owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and trr�ture re iew and inspec ` OWNER OR AGENT: / v DATE: / - --T BLD2008-00512 Please refer to the following pages for conditions of this permit. 3 of 3 Cn o CONCRETE MECHANICAL MANUFACTURED HOME 0 C) Footings I Setbacks Date By Ribbons Gas Piping 0o intenor Date By Interior-Date By Date By cn �- N Extent Date By Exterior-Date By 0 Sot-tom Point Load I isolated Footings INSULATION Date By BG f BLAB INSULATION Date By Data By FIRE DEPARTMENT Foundation Walls Floors Data By Date By Data By DECKS FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Type: Date By Date By Date By D.W.v DRYWALL Type. Int Brace Wall Date Date 6y Date By r FINAL INSPECTION m Water Line Fire Separation NC 8 Date By Date By Date J By' CD Dt0 `° Pass or Request Inspect. c 0 T y pe of Insp. Fail Date Date Done By Comments <D If N 0 co v co m m 0 8 _ a 0 0 c m j r i i 0