HomeMy WebLinkAboutBLD2008-00512 Heatpump - BLD Permit / Conditions - 5/1/2008 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
i�
RESIDENTIAL BUILDING PERMIT BLD2008-00512
OWNER: JODY SCOTT RECEIVED: 5/1/2008
CONTRACTOR: ALL SEASONS INC. 879-9144-278-9144 LICENSE: ALLSEI*03055 EXP: 12/17/2009 ISSUED: 5/1/2008
SITE ADDRESS: 181 E OLYMPIC CT ALLYN EXPIRES: 11/1/2008
PARCEL NUMBER: 122175100020
LEGAL DESCRIPTION: LAKELAND VILLAGE#11-A LOT: 20
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
HEAT PUMP (EXISTING FURNACE) HWY 3 TO LINE DRIVE W TO E OLD RANCH RD NORTH ON OLD RANCH
TO E OLYMPIC CT W TO ADDRESS
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: MEC Fire Dist.: 5 No.of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Water Body:
Make: Length: Ft. Front: Ft. Shoreline: Ft. SEPA?:
Rear: Ft. Slope: Ft. Shoreline Desi
Model: Width: Ft. Side 1: Ft. g
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Heat Pump 1 Mechanical Fee TAM 5/1/2008 $17.00 B12008000
Mechanical Base Fee TAM 5/1/2008 $26.60 B12008000
Total $43.60
BLD2008-00512 Please refer to the following pages for conditions of this permit. 1 of 3
CASE NOTES FOR
BLD2008-00512
CONDITIONS FOR
BLD2008-00512
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are pot tial risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-64770982 The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) Owner/Age responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
x n
3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revo do .
X
4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall���ade prior to requesting additional inspections.
X
5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason Count rdirtances and building regulations.
6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prev 9 tion from being taken. No more than one extension may be granted.
X
BLD2008-00512 Please referto the following pages for conditions of this permit. 2 of 3
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The er or the agent he owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described property and trr�ture re iew and inspec `
OWNER OR AGENT: / v DATE: / -
--T
BLD2008-00512 Please refer to the following pages for conditions of this permit. 3 of 3
Cn
o CONCRETE MECHANICAL MANUFACTURED HOME
0
C) Footings I Setbacks Date By Ribbons
Gas Piping
0o intenor Date By Interior-Date By Date By
cn �-
N Extent Date By Exterior-Date By
0
Sot-tom
Point Load I isolated Footings INSULATION Date By
BG f BLAB INSULATION
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Data By
Date By Data By DECKS
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Type:
Date By Date By Date By
D.W.v DRYWALL Type.
Int Brace Wall Date
Date 6y Date By r
FINAL INSPECTION
m Water Line Fire Separation NC
8 Date By Date By Date J By' CD
Dt0
`° Pass or Request Inspect. c
0 T y pe of Insp. Fail Date Date Done By Comments
<D If N
0
co
v
co
m
m
0
8
_
a
0
0
c
m j
r
i
i
0