Loading...
HomeMy WebLinkAboutBLD2013-00928 Ductless Heat Pump - BLD Permit / Conditions - 10/18/2013 r# �' Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 279 Shelton, WA 98584 i MECHANICAL PERMIT BLD2013-00928 OWNER: WILLIAM PARKER CONTRACTOR: BLACK HILLS INC 360-705-8590 LICENSE: BLACKH1006DA EXP: 7/19/2015 RECEIVED: 10/18/2013 SITE ADDRESS: 110 E ISLAND LAKE RD SHELTON ISSUED: 10/18/2013 PARCEL NUMBER: 420121290030 EXPIRES: 4/18/2014 LEGAL DESCRIPTION: TR 3 OF W1/2 NE TR A OF SP#311 AF#329897 PROJECT DESCRIPTION: DIRECTIONS TO SITE: DUCTLESS HEAT PUMP HWY 101 RIGHT ON SHELTON SPRINS RD LEFT ON E ISLAND LAKE RD General Information Setback Information Type of Use: SF Insp.Area: Front: Ft. Shoreline: Ft. Type of Work: MEC Fire Dist.: Rear: Ft. Slope: Ft. Valuation: Side 1: Ft. Side 2: Ft. Mechanical Fixtures FEES Type Qty. Type By Date Amount Receipt Heat Pump 1 Mechanical Permit Fee TW 10/18/201 $18.20 S220130000( Mechanical Base Fee TW 10/18/201 $28.50 S220130000( Total $46.70 BLD2013-00928 Please refer to the following pages for conditions of this permit. Page 1 of 2 CASE NOTES FOR BLD2013-00928 CONDITIONS FOR BLD2013-00928 1) Contractor registration I s are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are ential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-098 . The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) Owner/Age n is resp nsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUM STANDA DS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE. X � 4) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County divan nd building regulations. X 6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a per' d not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have vente tion from being taken. No more than one extension may be granted. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by m9os of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County acceXVo the above described property and structure for review and/inspection. OWNER OR AGENT: DATE: X0 BLD2013-00928 Please refer to the following pages for conditions of this permit. Page 2 of 2 W ' o CONCRETE Ptp'!'n� MANUFACTURED HOME y No Interior-Date By w Footings/Setbacks Fxterpr-Date Fly Ribbons T m CD Darn �' INSULATION Date By 000 Foundation Walls BG I SLAS INSULATION Set-up Date By Date By date By r r FRAMING Floors FIRE DEPARTMENT D Date By _ Date By Date By Wafts _. PLUMBING Date By DECKS Da tg t3yr Groundwork Vault TANKS By ate Date By D to Date By p w v Date By OTHER Date By DRYWALL Type: Date By Water Line Date BY Type: Date By Int.Brace Wall Date B — y r BY y MECHANICAL DFireSeperatian FINAL INSPECTION c CD Date By Date By Date I� Z )3 By LOA� _ W ° Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments hi 0 lz7jr 3 LEI y 6 O n O 7 a o' W O Err (D 3 v co CD 0