HomeMy WebLinkAboutMIS96-0238 Furnance, Hot Water Tank, Connect. to Natural Gas - MIS Permit / Conditions - 4/17/1996 20) CON;'I RUC t ION 11140( D s
DEPARTMU:N r AND UN I t()HM bil 1 N+•
( � MASON COUNTY
'-� Mason County Bldg. III 426 W. Cedar
411
P.0, Box 186 Shelton, Washington 98584
M i ':3 C'; F t— L- A N E 0 t)-- IFS E " M ! T Fail INSPECTIONS CALL 427-•9670
M I S96-0238 PARCEL 142012k I00020 PLAT : D I V . BI-K s LOT :
JOB ADDRESS : F 1180 SHFI_TON—SPRINGS RD -SHELTON
APPLICANTS GERTRUDE SEMANKO
OWNS R - GFR TRUDE SEMANKO
LEGAL t F 211' /F IIE 111, Elf E 21' It OF m E1 1 151'
I
PROJECT DESCRIPTIONS �
FURN. . NOT WATER TANK, CONNFCT I NG TO NATURAL. nAS .
1
PROJECT LOCATION :
TWO TONE GRFY HOUSE: AT INTERSECTION OF ROARDWAI.K AND SHEL TON SPRINGS ROAD OFF S Hf L TON SPRINGS
RD .
- PRO.I 3 rT NO i ES s
.']1CA5.".." '�C'�SfTS'.'d/L'�..TtIYY'.t=.�'IM1'P11Rfa::Oi`y' :LT•". 1
TYPE AMOUNT BY DATE: FiECE: I PT
MCFE $ 6 .50 'TW 04/ 17,96 41684
MCFE $ 6 .50 TW 04/ 17/96 41684 -
MCgu $ 16 .25 TW 04/ 17/96 41684
TOTAL �t6 . 5 1 OWNER O GENT [IATL
'�'33""3J6'r.'i�i:i.'•IIA:Yfi'.'16f^='-9y`'9^i:3'.:�L'b.^�,.�M'.3Yu�t:dL�ti.:�4�t.'^'Mi
#I$ rlr3, tavi 14111192 rOMPI- I ANCP TO ATTACHED CONDITIONS IS
RE«U HIED
CONCRETE MECHAN AL MOBILE HOME
Footings-Setback date C by jl Ribbons
date by Gas i / date b
Foundation Walls date (. ` b Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date b date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date ZG — 7,�' by date by
t
I
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
Casa No . : MIS96-0238
Fort GURTRUDE SEMANKO
Page ! 1
1 ) PiJRSUAN'( TO 1 q91 OIN I F ORM BV I L D I N G CODE , SECTION 305(C ) AND SECTION 513 , ALL SITES MUST
HAVE APPROVFD NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING
VEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR 10 CALLING FOR ANY SITE INSPECTIONS . A
FIE I NSPECT I ON FEE , BASED ON PA-IFS IN TABLE 3A OF THE 1991 UNIFORM BUILDING CODE W 11.1. BE
ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECTIONS .
2 ) ALL CONSTRUCTION MOST MEET OR EXCEED ALL LOCAL CODES AND UBC
REQUIREMENTS
3 ) The owner sha I I have available on site for i nepeot i oti by Mason County, a report
IndiratInG the name and license number of the Installer , the amount of pressure at the
time of testlnn and t1fK length of test time . This report shall he 31grv?d by the perrnn
r �
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b i
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by
PLUMBING date by OTHER
Attic
Groundwork date b
date by y
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
it
1
MASON COUNTY
f Mason County Bldg, III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
4 ) CONSTRUCTION PROGE SS TO BF FIELD GOAPECTED „AS. REQU I RED PER MASON COUNTY BUILDING 1
DEPARTMFNT AND UNIFORM BUILDING CODE
7
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by
PLUMBING date by OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
d
date by ate by
date by
I
I
J