Loading...
HomeMy WebLinkAboutBLD2012-00697 Final Ductless Heat Pump - BLD Permit / Conditions - 9/17/2012 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 i� MECHANICAL PERMIT BLD2012-00697 OWNER: BILL& MARTHA, TONDRE RECEIVED: 9/17/2012 CONTRACTOR: PRICE JONES LLC 360.377.6119 LICENSE: EXP: ISSUED: 9/17/2012 SITEADDRESS: 131 W MEADOWS PL SHELTON EXPIRES: 3/17/2013 PARCEL NUMBER: 420087890022 LEGAL DESCRIPTION: TR 2-B OF SURV 15/150 TR 2 OF SIP#2340 PROJECT DESCRIPTION: DIRECTIONS TO SITE: DUCTLESS HEATPUMP General Information Setback Information Front: Ft. Shoreline: Ft. Type of Use: Insp.Area: Rear: Ft. Slope: Ft. Type of Work: Fire Dist.: Valuation: Side 1: Ft. Side 2: Ft. Mechanical Fixtures FEES Type Qty. Type By Date Amount Receipt Heat Pump 2 Mechanical Permit Fee TW 9/17/2012 $18.20 S220120000( Mechanical Base Fee TW 9/17/2012 $28.50 S220120000( Total $46.70 BLD2012-00697 Please refer to the following pages for conditions of this permit. Page 1 of 2 CASE NOTES FOR BLD2012-00697 CONDITIONS FOR BLD2012-00697 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance DivisigF There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1- 047-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X ki 2) Ownnt is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X ��``�� 3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in per a ation. X 4) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with X Mason CAwrtv-ordinances and building regulations. 5) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder ave ented action from being taken. No more than one extension may be granted. X This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is 9byipeans of a progress inspection. The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Masory/Coynty+ ss t b escr' roperty and structure r review and inspection. OWNER OR AGENT: �'=` " DATE: BLD2012-00697 Please refer to the following pages for conditions of this permit. Page 2 of 2 MASON COUNTY PERMIT NO. ��C��—�J� PLUMBING/MECHANICAL PERMIT APPLICATION 426 W. Cedar-P.O. Box 186, Shelton,WA 98584 Shelton (360)427-�670-Belfair(360)275-4467-Elma(360)482-5269 n the web www.co.mason.wa.us APPLIC N INMATION� CONTRACTOR IN ORM TION Owner F Rs re— Company Name `L Mail% g Ad res f� 1 Mailin Address Lc City. State_,f Zip Code ` `� City ,S�ta�e Zip Code cd W4- Phone Other Ph. Phone fv ther Ph.— —13 Lien/Title Holder Contractor Reg. # f Exp. � 3-. E mail address E Mail Address, Drivers Lic.# DOB Drivers Lic.# WE 5 OB 1/2!�' 25 _ SEPTIC INFORMATION - Connect to New Septic. Existing Septic. Connect to Sewer System Name of Sewer System PARCEL INFORMATION- 12 Digit Parcel No Fire District Legal Description Site Address(Please include street name,street number and city) Directions to site Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% TYPE OF JOB - New Add Alt Repair Other Use of Building Location of Fixtures/Units- 1st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Tyne of Fixture No. of Fixtures Fees Fuel Type:Electric_LPG—Natural Gas_Heat Pump_ Toilets Type of Unit No.of Units Fees Bathroom Sink Furnace Bath Tubs Heatpumps Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kithen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hosebibs Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OVVNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from thaln to apply for this peMlitzod conduct the work proposed. The owner or agent on owners behalf,represents that the information provideda t r s of ason Co my access to the above described property and structure for review and inspection. PR ROGRESS INSPECTION. X Date: a Owner/O Hers sentative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bid Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group—Type Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Inspection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/Pellet Stove Fee Other Violation Fee TOTAL FEES too o CONCRETE Gas plpi"9 MANUFACTURED HOME o ----- Interbr-Date By — Z N Footings 1 Setbacks Exter*r-Date By Ribbons p Date By INSULATION Date By m A Foundation Walls BG!SLAB INSULATION Setup p Date By Date By Date By r FRAMING Floors FIRE DEPARTMENT Q° Date By im Date By []rate By Walls > DECKS PLUMBING Date By DciEu By _ Groundwork Vault Date D By Date BY Date By Attic o.w.v Date By OTHER Date By DRYWALL Type. Da to By Water Line Date By Type. Date By Int.Brace Wall Date By CD MECHANICAL QaEe By FINAL INSPECTION � (D Fire Seperation O fD Date By Date By Date By t j m 0 Pass or Request Inspect. CD o Type of Insp. Fail Date Date Done By Comments W fn O 1 a o' V1 O _S y rD 3 0