HomeMy WebLinkAboutBLD2024-00290 mechanical - BLD Inspections - 5/16/2024 INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2024-00290 PROJECT ADDRESS 1890 W Shelton Valley Rd Shelton, WA 98584
PARCEL# 420274100010 PROJECT DESCRIPTION installing new air handler and heatpump
OWNER MATHENY MARVIN S&VICKY ADDRESS 1890 W SHELTON VALLEY RD PHONE
CONTRACTOR AMERICOOL HEATING AND A/C LLC ADDRESS P O BOX 880 PHONE 360.273.3300
CONTRACTOR LICENSE AMERIHC833KP LENDER
INSPECTION INSP I DATE Comments INSPECTION INSP DATE Comments
Mechanical/Plumbing Final 0L-r6 - b'
f A(L
L
MASON COUNTY 360-427-9670 Shelton ext.352
" 360-275-4467 Belfair ext. 352
COMMUNITY DEVELOPMENT 360-482-5269 Elma ext. 352
Building,Planning,Fire Marshal
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.masoncountywa.gov
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER: &D -?0,7`f - 00-2qp
ADDRESS/LOCATION: /g`rQ GJ SHEG?rrN J/�I�-LCX�'/�
FINDINGS•
/Vo A-cCEJ's, 81-64X i?ESC OUL-E AIR yAAJO R Awfl
REgfi PyMP TALff Cr1vJ
Items listed above must be corrected to gain compliance.
*THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
Call for re-inspection when corrections are made before proceeding with any further work.
❑ Make corrections, items will be checked on the next inspection.
❑ OK to
Date:_S" :1 ❑ Please contact our office regarding possible
Department: structural damage incurred by recent
Inspector: �� "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-00290 MECHANICAL - RESIDENTIAL
PROJECT DESCRIPTION: INSTALLING NEW AIR HANDLER AND ISSUED: 03/13/2024
HEATPUMP
SITE ADDRESS: 1890 W SHELTON VALLEY RD SHELTON EXPIRES: 09/09/2024
PARCEL: 420274100010
APPLICANT: MATHENY MARVIN S&VICKY OWNER: MATHENY MARVIN S&VICKY
1890 W SHELTON VALLEY RD 1890 W SHELTON VALLEY RD
SHELTON,WA 98584 SHELTON,WA 98584
CONTRACTOR: FULLING GREG&JOY
Po Box 880
Rochester,WA 98579
3602733300
GENERAL CONTRACTOR'S LICENSE: AMERICOOL HEATING AND A/C LLC License: AMERIHC833KP
P O BOX 880ROCHESTER,WA 98579 Expires: 05/17/2025
360.273.3300
FEES: Paid Due
State Fee-Residential $6.50 $0.00
Mechanical Fees $33.00 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Final Inspection $80.00 $0.00
Mechanical Base Fee $30.00 $0.00
Totals : $154.50 $0.00
FIXTURES
(3ty Mechanical Fixtures
1.0000 Air Handlers- Miscellaneous
1.0000 Heat Pumps)
Printed by:Nikita Huckabey on:04/03/2024 10:51 AM Page 1 of 3
ALAK—
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2024-00290
REQUIRED INSPECTIONS
Mechanical/Plumbing Final Inspection
CONDITIONS
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished.Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy
code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth
in the WSEC and international mechanical code.
Printed by:Nikita Huckabey on:04/03/2024 10:51 AM Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
pN"C Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2024-00290
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Nikita Huckabey on:04/03/2024 10:51 AM
Page 3 of 3