Loading...
HomeMy WebLinkAboutBLD75-8688 - BLD Permit / Conditions - 11/28/1975 BUILDING PERMIT APPLICATION MASON COUNTY P. 0. Box 400 Shelton, Washinqton 98584 f l (wry (';DATE ISSUED PERMIT NO. OWNER �--7— �- MAIL ADDRESS —�-- ZIP PHONE AAAI DIRECTIONS TO 10B SITE MAIL ADDRESS Zip — LEGAL �7�-- t J (OSEE ATTACHED SHEET) DESCR. ,L 0 / p� 6_— jP� IO 0 CY MAIL ADDRESS PHONE CONTRACTOR (�e USE OF J MAIL ADDRESS PHONE LICENSE NO. BUILDING Class of work: 0 NEW ❑ADDITION krALTERATION 'Cl REPAIR ❑MOVE O REMOVE Describe work: Oov 'Oeo Q i�*l Valuation of work:$ PLAN CHECK FEE PERMIT FEE �®0, O SPECIAL CONDITIONS: APPLICATION ACCEPTED BY PLANS CHECKED BY A O FOR ISSUANCE BY Type of Occupancy „a Const. Group Division Size of Bldg. No.of Max. (Total)Sq. Ft. Stories Occ.Load CONTRACTOR AFFIDAVIT Special Approvals Required Received Not Require I Certify that I am a currently registered contractor in the State 'ZONING of Washington and the County of Mason and I am aware of the HEALTH DEPT. ordinance requirements regulating the work fcr which the permit F50110C WORRe Is Issued and all work done will be in conformance therewith. ROAD DEF27, Firm By - Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the contract or registration law RCW 18.27, and am aware of the Mason N O T I C E County ordinance requirements for which this permit is issued and that all work done will be in conformance therewith. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING. VENTILATING OR AIR CONDITIONING. f+ THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ( AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUC- TION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF ow4erDnk �-- Date j/ .�` 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION M.O. CASH 51FIE1-TON PRINTING CO.