Loading...
HomeMy WebLinkAboutBLD2004-00953 SFR, Garage - BLD Permit / Conditions - 7/15/2004 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 01 RESIDENTIAL BUILDING PERMIT BLD2004-00953 OWNER: WILLIAM BERG RECEIVED: 6/17/2004 CONTRACTOR: LICENSE: EXP: ISSUED: 7/15/2004 SITE ADDRESS: 1150 E NORTH BAY RD BELFAIR EXPIRES: 1/15/2005 PARCEL NUMBER: 122171200.051 LEGAL DESCRIPTION: TR 5-A OF GOVT LOT 1 LOTS: 1-2 OF SP #1838 1150 E NORTH BAY RD BELFAIR PROJECT DESCRIPTION: DIRECTIONS TO SITE: SFR/GARAGE 1.5 MILES NORTH OF ALLY ON NORTH BAY ROAD. General Information Construction & Occupancy Information Square Footage Information No. of Bedrooms: 5 Type of Constr.: V-N Type of Use: SF Insp. Area: No. of Bathrooms: 4 Occ. Group: R-3, U-1 Lot Size: Deck: 743 Type of Work: NEW Fire Dist.: 5 No. of Stories: 2 Occ. Load: Building:1,871 Garage-Attached 759 Valuation: Building Height: 30 Occ. Status: Primary Basement: Unfin. R-3 2,162 Manufactured Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: W 5 3.0 Ft. Shoreline: 72.0 Ft. Water Body: NORTH BAY Rear: E 72.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: N 100.0 Ft. Shoreline Desig.: Rural Year: Serial No.: Side 2: S 20.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 2 Exhaust Hood 1 Plan Check Fee CMH 6/17/2004$1,195.58 B12004 Hosebibs 6 Furnace<100K 1 Planning Review Fee CMH 6/17/2004 $155.00 612004 Kitchen Sink 1 Gas Outlets 2 EH Plan Review CEW 6/29/2004 $75.00 B12004 Laundry Tray 1 Propane Tank 1 Adjust Plan Check Fee JRN 7/10/2004 -$160.16 Bi2o04 Lavatories 4 Ventilation Fan 6 Building State Fee JRN 7/10/2004 $4.50 1312004 Showers 1 Heat Pump 1 Building Permit Fee JRN 7/10/2004$1,592.95 B12004 Water Closets (Toilets) 4 Propane Stove 1 Mechanical Fee JRN 7/10/2004 $167.70 B12004 Water Heaters 2 Dryer Vent 2 Mechanical Base Fee JRN 7/10/2004 $23.50 812004 Bath Tubs 3 Plumbing Fee JRN 7/10/2004 $139.00 B12004 Clothes Washer 1 Plumbing Base Fee JRN 7/10/2004 $20.00 B12004 Total $3,213.07 BLD2004-00953 Please refer to the following pages for conditions of this permit. 1 of 4 CASE NOTES FOR B LD2004-00963 CONDITIONS FOR B LD2004-00953 1) Contractor re is Oal s e governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. Ther r isks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-098o signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X / r 2) Per applicant, e ,o remain unfinished. A separate permit will be required to be obtained prior to finishing any unfinished areas. X 3) All approv 4ansquired to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be gran an, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department urther inspections being performed or approvals granted. X 4) In accordance with the Uniform Building Code and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that require a� ss shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the acce " road. a numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Buildi, a ment requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdi and the Uniform Building Code will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections X 5) The plan review cheq list and c rections, along with the Energy Compliance Worksheet (when applicable) are pa of the approved plans and must remain thereto. It ' the resp ibility of the applicant to make the corrections indicated on the pans. Once the p ns are marked "APPROVED", they shall not be change a out authorization from the Building Official. The permit holder is responsib o retain the complete approved set of plans on site for the u ' o e project. Failure to comply and/or removal of approved documents ill sult in failure of required building inspections. X 6) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X BLD2004-00953 Please refer to the following pages for conditions of this permit. 2 of 4 FF Any changes in proposed constyl!iction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building artment prior to c nstr chi n. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If docume s'ar mov d, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall b c ept zf the Building Department prior to any further inspections being performed or approvals granted. X 8) All construction ust meet exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County and the S at'p o ashitlgton. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would e$u `perraif revocation. X v 9) All changes to " pP(ove wilding plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance or reg lat�bst reviewed and approved by Mason County prior to construction. X �. 10) The construction of t e er,4*ttprject is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Cods sand adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be ma Iesting additional inspections. X 11) All propane tanks must be installed in accordance with the Uniform Fire Code and all applicable Mason County ordinances. All propane tanks filled on site must be located a minimun f 10' from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system air intake (direct ve applia c , ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane tanks less than 125 al ns m st al u be located a minimum of 5' from any building opening (foundation vents, windows, doors etc), property line or easement. If a propa ank-Is evosed to probable vehicular damage, protective bollards must be installed. X 12) All propane tanks ust be inst lied in accordance with the Uniform Fire Code and all applicable Mason County ordinances. All Propane tanks between 125 and 500 gallo s mu t b ocated a minimum of 10' from any building, property line, public way, possible source of ignition (electrical outlets, electrical fixtures, o p ors;-etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. If a propane tank is exposed to probable vehicular a :e, rq ective bollards must be installed. X 13) All propane tank stl1 statt9d in accordance with the Uniform Fire Code and all applicable Mason County ordinances. All propane tanks must meet the installati nui mepCs and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks. X �. 14) Fuel piping sha beCinectecLatf er the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of insp ct est.pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not bed until the final inspection has been n performed and approved by a Mason County building inspector. X �l 15) The placement of small propane tanks are not nor ,a ly ,uu ject to a permit review by the Planning Department-, however, propane tanks are subject to Planning Department regulations. Such regulations tyf jar�fy- nsist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think such features ax t (nearby your property, please contact the Planning Department so that exact setback requirements can be determined. X BLD2004-00953 Please refer to the following pages for conditions of this permit. 3 of 4 roperty lines shall be clearly identified at the time of foundation inspection. X - 17) All building permits sh 11 'ave a i pl-inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a fin I I pe ti_ n or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with M on oun y ordinances and building regulations. X 18) All permits expire 110 days aftorJpermit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a peri d of xeeed' g 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have re ght d tion from being taken. No more than one extension may be granted. X — J) 19) Pressure treated o d nufacjPGred after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and as ing. Ins II metal connectors approved for contact with the new types of pressure treated material. X 20) 1. Developers and individuals shall be required to control erosion during construction. Removal of vegetation shall be avoided and any areas disturbed should be restored to prevent erosion and other environmental impacts. 2. The existing natural vegetative buffer shall remain undisturbed by any construction and/or development activities on the parcel. 3. The provisions and recommendations of the Habitat Management Plan shall be enacted. A copy of the Habitat Management Plan shall be kept onsite and made available to inspectors. 4. All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). 5. A detailed planting plan, with species composition, number, and distribution shall be provided to and approved by Planning staff prior to final approval of the building permit. 6. A monitoring plan shall be enacted whereby a qualified biologist shall submit a report detailing the condition of the restoration area. This report shall be due on the anniversary date of the issuance of the building permit and shall be submitted annually for three years. 7. A survival rate of 90% of plantings is required each year during the three-year monitoring period. If survival falls below 90%, the applicant shall replant to restore the required survivalsurvival percentage and shall extend the monitoring report the necessary period to address the replantings. 8. A restoration bond shall be a tablished with Mason County in the amount necessary to perform the restoration. 9. No degradation of water qu l�ty shall occur as a result of this project. 21) A site inspection by ni g ff is required prior to final permit approval. Please contact Rick Mraz at (360) 427-9670 ext 577 to schedule the inspection. X This permit becomes null and void if work or�onstruction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of c`ntin afion of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means f rogress inspection. The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the abo de cr d property and structure for review and inspection. OWNER OR AGENT: __— ------------ DATE: _ / '/ V BLD2004-00953 Please refer to the following pages for conditions of this permit. 4 of 4 J G C OYCA. ET MECHANICAL MANUFACTURED H OME- U Footings Setbacks Date 03 . 05r- By Ribbons Date Z By Gas Pipin /D� oT & Date B y w Foundation Walls Date p'�By � Set-up Date By ��_. INSULATION Date By B G I Slab Insulation Floors Final Date By Date 4a S G7�5- B y"t( , Date B y FRAMI G Walls FIRE DEPT Date 3D 5 By Date D 0,�By G5 Date By PLUM ING Attic '/ ��� OTHER Groundwork Date�`1 OS By Date By WALLBOARD NAILING D.W.V. p Date y-/<=S— By Date 03 ,A0 �-- By h FINAL INSPECTION . Water Lie Date , 9 By Date B Date B y 3 y .:..::.:..:.........:I.................................................................... �-fl alibloq f It lot IL S FA r � g CD f 3 k 317 IS t7d co - 3129105 3&)k ge MEt a 5 W AU l2 b� i3 bS Atop W1 c71c r AwCD jv r u� CGS la 'Ey Z5- 9-1 3 S �J� rry In 1.-o{C S 0� 0Arad })r f� ppp- I ' j4f f } « 4 �V Bradley-Noble Geotechnical Services A Division of The Bradley Group, Inc. PO Box 12267, Olympia WA 98508-2267 Phone 360-357-7883 9 FAX 360-867-9307 29 June 2004 Mrs . Donna Berg P.O. Box 340 Belfair, Washington 98528 Subject: Recommendations for improvement to site soils for support of foundation for your new residence to be constructed at 1150 E . North Bay Road, Allyn area of Mason County, Tax Parcel Number 122171200051 . Dear Mrs . Berg: As requested, I met with you and your site work contractor at the above site in order to evaluate site soil conditions and to present recommendation for improvement to the subgrade to ensure support for your new residence. At the time of our site visit, an existing residence had been razed, foundations removed, and the former crawl space area was open. We observed ground water flowing through the former crawl space. From our conversation, we understand that your new residence will occupy the area of the former residence on this site. The new residence will have a building footprint of 41 x 61 feet with a 26 x 29 garage to be constructed in the southwest corner of the residence. We understand that the new residence will be of 1 . 5-story, wood-frame construction. Continuous perimeter footings will be used for support of exterior wall loads . Strip footing or pier pad footings will be used for support of interior bearing walls . A crawl space will be included in the design solution. Site soils offer poor support for the new footings . Soil profile in the construction area consists of alluvium and fill that has been deposited over about two feet of peat. The peat crops out in the former crawl space excavation. Peat is considered to be an infinitely compressible soil for its thickness . Under 04061401 Page 1 of 4 t - 04061401 Page 2 of 4 the peat layer, we find a compact sand associated with a depositional history of Vashon recessional outwash soils (Qvr) The sand layer varies in thickness and is underlain by Vashon subglacial till (Qvt) . ' In this area, the subglacial till is weathered to depth and is excavatable using standard construction 04uipment. Subglacial till is for all practical purposes impermeable. The site is located at the base of slope. From work we have done to the west of this site along Highway 3, we have found thin recessional outwash soils over subglacial till. The flow of water from the slope is to the east towards North Bay of the Case Inlet which fronts this property. We expect that the flow of water from this area during periods of heavy or prolonged rainfall is great. Saturation of the soils above the subglacial till may extend to the surface. Sheet flow of storm water from North Bay Road is also directed to your site. We understand from our conversation with you and your site work contractor that extensive drainage is proposed to intercept and control both ground water and surface water flowing towards your building site. We concur with the proposed scope of work including interception of surface flow from the highway and construction of french drains on the west side of the building site. To provide foundation support, we recommend that the alluvial soils and peat be removed to expose firm mineral soils . This removal must extend a minimum of one foot horizontally for each foot of removal or a minimum of three feet outside of building lines to provide lateral support . Into the excavation, we recommend that quarry spall in the six- to ten-inch size be placed. Quarry spall do not contain fines and will allow for the flow of any ground water not captured by the drain system and so prevent ponding of water in the crawl space . Compaction control using standard test methods are not possible when coarse material is used. When more than 30% by weight is retained above the 3/4-inch screen, standard testing procedures are not possible. For compaction control, we recommend that the use of a 04061401 Page 3 of 4 firm and non-yielding surface be used for control . We have no objection to the placement of a finer grade material to cap the quarry spall section. The last foot of the structural fill section may use a 3-inch minus, well graded crushed rock to facilitate fine grading operations . Footings may be cast on the structural fill section. Foundation loads are distributed by the structural fill section and imposed onto the firm to dense native soils . We do not expect that significant long-term total or differential settlements will occur for foundations placed on the structural fill section constructed as discussed. Your site work contractor proposed to place a geotextile support fabric between the quarry rock section and native soils . We have no objection to the use of a geotextile. Depending on manufacture and product specification, geotextiles may be of low permeability. Provisions may be required to allow for the collection of water ponded by the geotextile, and positive drainage must be ensured for the quarry spall section. If geotextile is used, it should extend up the excavation walls to provide a barrier between the native soils and the quarry rock structural fill section. With the high ground water levels at this site, use of a high quality vapor barrier to aid in reducing moisture in the crawl space is recommended. At this site, use of a 30 to 40 mil neoprene liner, similar to the product used for pond liners may be beneficial . This is more durable than a visqueen type of product. The neoprene can have joints welded and can be attached to the foundation to prevent moisture from entering the crawl space . Roof rain leaders should be collected into a tightline system with the water conveyed into the existing drainage system below the area of construction for disposal . Construction of a perimeter footing drain placed at the base of the footing is recommended. We recommend that rigid PVC pipe be used for the footing drain as it is more resistant to crushing and positive slope to drain can be more easily ensured. The footing drain may be connected into the existing 04061401 Page 4 of 4 drainage system at an elevation such that backup into the footing zone cannot occur. We also recommend that cleanouts be provided for both the roof rain leader and footing drain systems to facilitate future maintenance. Backfill against foundation walls should be a clean, freely draining material . This will permit any water to flow rapidly to the footing drain and prevent ponding against the foundation walls . Maintaining a positive slope of at least 2% for five feet away from the foundation walls recommended to prevent surface storm water from flowing towards the foundation. Storm water from driveways and roadways should be collected into either catch basins or trench drains . This water should be disposed of in an approved manner to allow filtration of water before entering Puget Sound. With placement of footings on a structural fill section as discussed and good drainage practices, we expect that the proposed construction will not have any foundation support or wet crawl space issues . If you have any questions, or if we may be of additional service to you on this project, please contact us at our Olympia office. Cordially, BRADLEY-NOBLE GEOTECHNICAL SERVICES x� ct W ash, % �9f David C. Strong, L.E.G. SZ` 1129 p�`h O d GeO� DAVID C. STitONG Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar Not$ P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection November 06, 2007 WILLIAM BERG PO BOX 340 BELFAIR WA 98528-0340 Case No.: BLD2004-00953 Parcel No.: 122171200051 Proiect Description: SFR/GARAGE The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $64.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $64.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 359. Sincerely, .J Terry Ryan Mason County Department of Community Development Cc: Property File November 06, 2007 BLD2004-00953