Loading...
HomeMy WebLinkAboutBLD2006-02111 SFR - BLD Permit / Conditions - 1/8/2007 16C (' w5 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF 60i ITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2006-02111 OWNER: JAY YANAMURA RECEIVED: 12/13/2006 CONTRACTOR: LICENSE: EXP: ISSUED: 1/8/2007 SITE ADDRESS: STATE ROUTE 302 BELFAIR EXPIRES: 10/24/2007 PARCEL NUMBER: LEGAL DESCRIPTION: TR 4-D OF SURV 15/99 TR 4 OF SP#2033 PROJECT DESCRIPTION: I.�{j DIRECTIONS TO SITE: New SFR 1 t,' D� Hwy 302 to address. Cell tower on site. General Information Construction &Occupancy Information Square Footage Information No.of Bedrooms: 3 Type of Constr.: V-B Type of Use: SF Insp.Area: No.of Bathrooms: 4 Occ. Group: R-3, U Lot Size: Deck: 300 Type of Work: NEW Fire Dist.: 5 No.of Stories: 2 Occ. Load: Building:1,972 Valuation: Building Height: Occ. Status: Seasonal Basement:1,407 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: E 10.0 Ft. Shoreline: 86.0 Ft. Water Body: Case Inlet Rear: W 86.0 Ft. Slope: Ft. SEPA?: Model: Width: Ft. Side 1: S 5.0 Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: N Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 Exhaust Hood 1 Plan Check Fee KKK 12/18/200 $920.78 S22006000 Hosebibs 5 Fireplace 2 Planning Review Fee KKK 12/18/200 $155.00 S22006000 Kitchen Sink 2 Furnace<100K 0 EH Plan Review TW 12/21/200 $75.00 S22007000 Laundry Tray 1 Gas Outlets 7 Building State Fee JRN 12/26/200 $4.50 S22007000 Lavatories 5 Propane Tank 1 Building Permit Fee JRN 12/26/200 $1,447.35 S22007000 Showers 3 Ventilation Fan 5 Mechanical Base Fee JRN 12/26/200 $23.50 S22007000 Water Closets (Toilets) 4 Heat Pump 0 Mechanical Fee JRN 12/26/200 $131.90 S22007000 Water Heaters 1 Dryer Vent 1 Plumbing Fee JRN 12/26/200 $124.00 S22007000 Bath Tubs 1 Plumbing Base Fee JRN 12/26/200 $20.00 S22007000 Clothes Washer 1 Address Fee BLJ 12/29/200 $140.00 522007000 ADJUST--Mechanical Fee CMH 8/17/2007 $110.05 S12007000 ADJUST--Plumbing Fee CMH 8/17/2007 $27.80 S12007000 Total $3,179.88 BLD2006-02111 Please referto the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2006-02111 CONDITIONS FOR BLD2006-02111 1) Appro,ed per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 2) Co act r registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647- 982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) The Le/rna4onal code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such ro ds connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X ye OWNER MUST SHOW PROOF F SATISFACTORY WATER SAMPLE AND WELL REPORT PRIOR TO TEMPORARY/PERMANENT OCCUPANCY OF THE RESIDENCE. X 5) All approved plans are requir d to Ze on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depart t prior to any further inspections being performed or approvals granted. X 6) In accords ce with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads,"all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X 7) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or remova f approved documents will result in failure of required building inspections. X BLD2006-021 Please referto the following pages for conditions of this permit. 2 of 5 8) All slabs within the heated space shall be insulate to a minimum R-10 for at least 24". Monolithic slabs shall be insulated around the perimeter from the top of the slab to the bottom of the footing X 9) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 10) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: IV, Window(Max U-Factor):0.40, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.40 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-30, Slab Insulation R-10. X 11) Per 2003 IRC -SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BASIC W4ND SPEED (3-SECOND GUST)the wind speed for Mason County is 85 MPH. X 12) Per 2003 I C - SECTION R905- REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accordaQce with the applicable provisions of this section and the manufacturer's installation instructions. X 13) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X Qlv 14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged grid shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit re cation. X 16) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X BLD2006-02111 Please referto the following pages for conditions of this permit. 3 of 5 17) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X 18) CONS RUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspe r shall be made prior to requesting additional inspections. X 19) All property lines shall be clearly identified at the time of foundation inspection. X 20) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Coun r rdinances and building regulations. X 21) All permits pire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder hay r vented action from being taken. No more than one extension may be granted. X 22) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, conneMor and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X l 23) This parc ' located in a smoke management zone. Please contact a fire warden at (360)427-9670 ext. 459 for further information. X 24) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approve ite Plan"to ensure these structures are shown and meet the setback conditions listed. X 25) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X BLD2006-02111 Please refer to the following pages for conditions of this permit. 4 of 5 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: DATE: t' BLD2006-02111 Please refer to the following pages for conditions of this permit. 5 of 5 o t CONCRETE MECHANICAL MANUFACTURED HOME y _o Date By Z 0 Footings t Setbacks Ribbons D Gas Piping oN interior Date By Interior-Date BY Date By C i=irterrar Date 8y Exterior-gate B set-up Ruin:toad I Isolated Footings INSULA71ON Date By BG f SLAB:INSULATION D ta$te By Date By FIRE DEPARTMENT < Foundation Walls Floors Date By Late -Z V.07 BY,051P4Date E DECKS FRAMING Walls Date By Date . - O B Data <l l/-c�`3 y' %` PROPANE TANKS PLUMBING Vault Date 8 y Date By OTHER Groundvmj-k Attic Late By Type- Date BY Date BY t]_Va1.V DRYWALL Typeg /d Int Braca 1NaIl Danz _ By 03 Date �S �.7 BY Date try FINAL INSPECTION p v Water Line I Fire Sepe ration m Data By Date By Date CD m Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments 0 � 7 8 5�xr� Wk a �' rvlt t ac) i 1to _s �, t o fi2cz� c n,�•" r Ln 22 W,4CZ vL vat/ o vJU� 1✓ ? if'/fit �—L� �77Pao D WCii0, iiliP