HomeMy WebLinkAboutBLD2018-00263 - BLD Permit / Conditions - 11/19/2018 00
o CONCRETE Gas Piping MANUFACTURED HOME y
o Interior-Date By -- -- . _ _ X
T Footings/Setbacks Ribbons --I
Extergr-Date By
o
INSULATION Da to By Date By
N m
w Foundation Walls BG J SLAB INSULATION Set-up Ir"
Date By Date By Date By �
FRAMING F1O° FIRE DEPARTMENT r
Date By Do to By M
Date By Walls
PLUMBING Dale. By DECKS
Date BY
Groundwork Vault TANKS
Da to BY
Da to By Date By
Attic
D.W.V
Date BY OTHER
Date By DRYWALL Type
Date By
Water Line DaFe By Type:
v Date By Int.Brace Wall Date BY 17,
v MECHANICAL Date FINAL INSPECTION
m Fire Seperaticn O
CD Date By Date By Date FSy
m
Pass or Request Inspect.
CD Type of Insp. Fall Date Date Done By Comments