HomeMy WebLinkAboutBLD2009-00018 Garage - BLD Permit / Conditions - 2/12/2009 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
5014 Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2009-00018
OWNER: DONNA KEARY RECEIVED: 1/12/2009
CONTRACTOR: LICENSE: EXP: ISSUED: 2/12/2009
SITE ADDRESS: 42 E NAHUM LN BELFAIR EXPIRES: 8/12/2009
PARCEL NUMBER: 122164390017
LEGAL DESCRIPTION: LOT: B OF SP#2801 S 17/222
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
New Attached Garage. SOUTH HWY 302 1 MILE PAST FISH HATCHERY TURN LEFT ON NAHUM
LN, TURN RIGHT ON FIRST DRIT DRIVEWAY, SITE IS ON LEFT SIDE
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.: V-B
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: U-1 Lot Size: Deck:
Type of Work: ACC Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement: garadd 507
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 52.0 Ft. Shoreline: Ft. Water Body: Case Inlet
Rear: W 25.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: E 97.0 Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: S 60.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee KKK 1/12/2009 $208.81 S22009000
Planning Review Fee KKK 1/12/2009 $205.00 S22009000
EH Plan Review KKK 1/12/2009 $41.00 S22009000
EH Plan Review ADR 1/22/2009 $62.00 612009000
Building State Fee RTB 1/26/2009 $4.50 612009000
Building Permit Fee RTB 1/26/2009 $321.25 612009000
Total $842.56
BLD2009-00018 Please refer to the following pages for oonditions of this permit. 1 of 5
CASE NOTES FOR
BLD2009-00018
CONDITIONS FOR
BLD2009-00018
1) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. New front setback is
52 feet fi m road easement.
X
2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There arNpotential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-80¢�6 0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X r/
3) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads nnect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X
4) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
A. Drainfield/ Reserve requires a 10ft setback from all footing/foundations.
B. Septic tank(s) requires 5ft setback from all footing/foundations.
C. N f ndation drains within 30ft, down gradient of drainfield/reserve area.
X
5) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are *d for this proposed development and
construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X
6) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be grante . In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Depart m t to any further inspections being performed or approvals granted.
X
7) Owner/ s responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
BLD2009-00018 Please refer to the following pages for conditions of this permit. 2 of 5
8) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removW
proved documents will result in failure of required building inspections.
X
9) This str cture is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
per it II be applied for, reviewed and approved prior to the change.
X
10) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
11) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approv I will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Buil in epartment prior to any further inspections being performed or approvals granted.
X 14
12) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement,
inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the
owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel
prior to the commencement of any development activities. "NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes
an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are
responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system
of this, or any other, parcel. You may also wish to 9onsult with the septic design professional involved with the project. By calling for a final inspection of
the building permit the owner/agent/contractor wledging that all components of the stormwater management system have been installed as
approved on the stormwater site plan. X
13) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical c crete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X
14) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
internatio Ole
s and Mason County Regulations unless a "Change of Use" permit is applied for, reviewed and approved.
X
15) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
charge M
ll be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
BLD2009-00018 Please referto the following pages for conditions of this permit. 3 of 5
16) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit r o tion.
X
17) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project
X
18) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordin ce r regulation, must be reviewed and approved by Mason County prior to construction.
X
19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the int rnational codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspe all be made prior to requesting additional inspections.
X
20) All property lines shall be clearly identified at the time of foundation inspection. X
-J&
21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason Cou ty ordinances and building regulations.
X
22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder-hak prevented action from being taken. No more than one extension may be granted.
X
23) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connect nd flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X ► o , a
24) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these str ctures meet the setback conditions listed.
X
BLD2009-00018 Please referto the following pages for conditions of this permit. 4 of 5
25) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Appr Site Plan"to ensure these structures are shown and meet the setback conditions listed.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner o the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described propert and struc a for review inspection.
OWNER OR AGENT: DATE: ( 'p- 0?
BLD2009-00018 Please referto the following pages for conditions of this permit. 5 of 5
C,1
o CONCRETE MECHANICAL MANUFACTURED HOME m
o
C) Footings/Setbacks Date By Ribbons
Gas Piping
Interior Date t U Q By,,,,�,/ Interior-Date By Date By
Exterior Date 2G B:Iv' Exterior-Date B 0
� Set-up
O
Point Load/Isolated Footings INSULATION Date By Z
BG 1 SLAB INSULATION
Date By Data By FIRE DEPARTMENT D
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING Walls Date By
Date /Z� LB' By � Data �- Z -/a By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Date B Date 7 Z 8 ��' By Type:
y Date By
D.w.v DRYWALL Type:
Date By
Int.Brace Wall Date By W Date By FINAL INSPECTION p
v Water Line Fire Separation ' CD
Date By Dale By Data B
Y
m rD
Pass or Request Inspect. c
5 Type of Insp. Fail Date Date Done By Comments o
00
o 0 ,q2'�1 ►Q /?�
_
tU �
O
8 g� ri?�� 4r 12-2,3•cv-r It
/ i N w_ C/mac
W S
S �•ni huh'c c— v � �/�—
10&9 Add
C
- - _ rZe_
~ V
L
den
�_ ��- � ' ► ' ohs=A' -z���� r� I � �, H�� �����j+
��. �,w�.� O��y-04 ,7 ZWL0c� d�°� 740
APP
MASON OUN�0VF0
DCD SITE PLAN REQUIR D TO BE ON S'ITEv u
CH GES SUBJECT TO APPROVAL
(S 88W51-E 270.08') — , Date 3 a
S 88004'47"E 270.10'
20' ASEMENT PER AFN 635835
�4 [S tmBY VACATED.
10
I- -
= - - - - - - -5a',o g� r50.007ERt.IlVE
�� DRAINMLD r
`• ��
I j I�2`PARCE 2 3-9001? I F 00
OR io
PAR N . l 16-4 , I PER SP 2$01 _ 3
`
XI
i 30 7 0
L
a _ 50`oa - L _ ._
x S�,
.o.o o� M �°LANNIcolG:
.AR EL I j ( ! ��y ' ALL SETBACKS ARE MEASURED
s �
No. 121.1643- 001 1 FROM THE FURTHEST
Ai : 1 00 ACRES I ; b o �. PROJECTION OF THE BUILDING
W T LINE
88°37'10"W 87.86' i �_ BLOCK WALL -
_ I RR TEE Wes. , N � .�1� PLANNING
g�aSZ08
I I RECEIVED
I
JAr' 12 2009
r ��,�- MASON COUNTY
Name !Oh�"XX Parcel# aa,, (p -y 3 I BLD#
f-
Y
Mason County
Department of Community Development
Small Parcel Stormwater Management Application/Worksheet (page 1 of 2)
Per Mason County Code,Title 14, Chapter 14.48 a stormwater site plan is required whenever a building application is
made for residential development, or redevelopment', with more than 2,000 square feet of impervious surface'.
'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development
including construction, installation or expansion of a building or other structure,and/or replacement of impervious surface that is not
part of a routine maintenance activity, and land disturbing activities associated with structural or impervious redevelopment.
2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas,
concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the
natural infiltration of stormwater. Open, uncovered retention/detention facilities shall not be considered as impervious surfaces.
Surface Type Length X Width = Area * All dimensions in feet
Buildings X =
X = Measurements for buildings are taken at the
X _ perimeter of the farthest projections(example:
eaves/gutters)
X = 6o'l
Driveways X =
X = Length of drive begins at the right of way
X =
Parking Areas X =
X = Any paved, gravel or packed area per definition
X _ above table
Patios/Walks X =
X = Any paved, gravel or packed area per definition
X _ above table
Others X =
X = If the total.irnpervious area of the proposed site
X = development is greater than 2000 square feet a
4 Srnal(Parcel Stormv�ater Site-Plan is Required
ri
If the Total Impervious Surface Area ' THAN 2000 Squa Fee , ease read,acknowledge and sign below.
Based Upon the information you have ovided a Stormwater Site Plan IS NOT req fired for this development activity.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor. I
further knowledge that the information provided is accurate and employees of Mason County are granted access to the above-
descr' e property fo revie and inspection as may be required.
—,4z,--- Owner/Agent/Contractor(circle one)Date:
If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet,please read, acknowledge and sign
the information provided on page 2 of 2.
Page 1 of 2
Name Parcel# BLD#
Mason County
Department of Community Development
Small Parcel Stormwater Management Application/Worksheet (page 2 of 2)
Based Upon the information you have provided a Stormwater Site Plan IS Required for this development activity.
"Title 14, Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater
Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website:
hup//www.co.mason.wa—us/code/commissioners/index.htm
Please follow the links to "Title 14, Chapter 14.48 Stormwater Management".
Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan
(Mason County Code Title 14 Chapter 14.48 section 14.48.70). You will receive a copy of the Public Works document
entitled "Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan". This document will assist
you in preparing the necessary information and plans for Public Works to review and approve. Per Department of
Public Works this document will constitute an approved plan if all of the relevant details* are to be installed in
their entirety AND no part of the stormwater system adversely affects any septic system (see Environmental Health
information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval.
A design by a registered professional may be required for more complex sites.
*These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan
on the pages that begin with "Handout"
PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE
A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed
in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel.
B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the
system will be located as not to adversely affect any septic systems on this,or any other,parcel.
If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works
Department can provide additional instructions, guidance and examples. (Section 14.48.130)contact Public works at:
Phone: (360)-427-9670 EXT. 450
Mail: P 0 Box 1850, Shelton WA 98584
Physical: 415 N 6th St, Shelton WA 98584
If this development has,or will have, a septic/drainfield system you may need to contact Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or
any other, parcel. You may also wish to consult with the septic design professional involved with the project. Mason
County Division of Environmental Health can be reached at:
Phone: (360)-427-9670 EXT. 352
Mail: P 0 Box 1666, Shelton WA 98584
Physical: 426 W Cedar St, Shelton WA 98584
A condition will be added to the building permit that states, in part,that all conditions the stormwater site plan will be met
prior to a request for final inspection of the building permit.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor. I
further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above-
described property for review and inspection as may be required.
X Owner/Agent/Contractor(circle one)Date:
Page 2 of 2
.NOS MASON COUNTY PERMIT NO. 000 ( 16
BUILDING PERMIT APPLICATION
426 W. Cedar- P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 - Belfair (360) 275-4467 - Elma (360) 482-5269 _`), Lv C r X
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner Y-v_',-zkCLA Company Name
Mailing A dresses 7 v n ►x& Mailing Address
City
> 4_ State Zip Code City State Zip Code
Phon ` / ��` Other P ���" � Phone Other Ph.
Lien#LTttte-Holder 360- 6 - 70' Contractor Reg. # Exp.
E mail address ' E Mail Address
Drivers Lic. # DOB Drivers Lic.# DOB
SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic
Connect to Water System Name of Water System
Well Sewer System Name of Sewer System —
PARCEL INFORMATION - 12 Digit Parcel No. Fire District
Legal Description
Site Address (Please include street name, street number and city)
Directions to site
Will timber be cut and sold in parcel preparation?Yes%No
Is property within 200'of Saltwater Lake River/Creek i ? Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs
Is this permit submittal the result of a Stop Work Notice,Correction Notice Qr other enforcement action?Yes/No
TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑
Use of Building Describe Work
No. of Bedrooms, No. of Bathrooms Square Footage- 1 st Floor 2nd Floor
3rd Floor Basement Deck— Covered Deck Other Sq. ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price $ Replacement Unit? Yes/ No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or the contractor. I further declare
that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all
the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work
proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or
agent on owners behalf, represents that the informaticn provided is accurate and grants employees of Mason County access to the above
described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is
not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY
MEANS OFA PROGRESS INSPECTION.INACTIVITYOF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THEAPPLICATION.
X � (/LL �C_ _' ._��--^---� Date:
Owner/Owners Representative/Contractor indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT Accepted by: 71 LA Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department og lei 1)
Planning Department - ,1'rp
Environmental Health Department
Fire Marshal
FEES
Building Permit Fee - T Site Inspection
Plan Review Fee (' - �/ EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood /Gas/ Pellet Stove Fee State Fee '
Violation Fee T - D Pre-Paid at Submittal
Valuation $ TOTAL FEES