Loading...
HomeMy WebLinkAboutBLD2009-00975 Deck - BLD Permit / Conditions - 11/25/2009 Inspection Line(360�427-7262 s, MASON COUNTY DEPT. OF COMMUNITY,DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2009-00975 OWNER: HARRY WESSNER RECEIVED: 11/5/2009 CONTRACTOR: LICENSE: EXP: ISSUED: 11/25/2009 SITE ADDRESS: 470 E RASOR RD BELFAIR EXPIRES: 5/25/2010 PARCEL NUMBER: 122064201000 LEGAL DESCRIPTION: S1/2 N1/2 N1/2 SE W OF RAZOR RD PROJECT DESCRIPTION: DIRECTIONS TO SITE: DECK South on 106 at Rasor Rd. site on right. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: VB Type of Use: SF Insp. Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: 552 Type of Work: DECK Fire Dist.: 2 No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Primary Basement: Manufactured Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: E 143.0 Ft. Shoreline: Ft. Water Body: SEPA?: No Model: Width: Ft. Rear: W 200.0 Ft. Slope: Ft. Shoreline Desi Side 1: IN150.0 Ft. g Not Applicable Year: Serial No.: Side 2: S 66.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty Type Qty. Type By Date Amount Receipt Plan Check Fee TW 11/5/2009 $99.61 S12009000 Building State Fee DLC 11/17/200 $4.50 S1200900o Building Permit Fee DLC 1 111 712 00 $153.25 S12009000 Total $257.36 BLD2009-00975 Please refer to the following pages for conditions of this permit. 1 of 3 CASF. NOTES FOR BLD2009-00975 CONDITIONS FOR BLD2009-00975 1) Owne�/ gent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 1_ y 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X /jC_ 3) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department/prior to any further inspections being performed or approvals granted. X L 4) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or remo,v_J of approved documents will result in failure of required building inspections. X L_ lei- 5) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. 6) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X BLD2009-00975 Please referto the following pages for conditionsof this permit. 2 of 3 7; All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County'prior to construction. 8) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X )12-. Z// 9) All property lines shall be clearly identified at the time of foundation inspection. X 10) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason CC.qunty ordinances and building regulations. X / - - Z/, 11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWN ER OR AGENT. DATE: BLD2009-00975 Please referto the following pages for conditions of this permit. 3 of 3 co o CONCRETE MECHANICAL MANUFACTURED HOME rn O Date By (p 0 Footings I Setbacks Gas Piping Ribbons N oIntenor Date By Interior-Date By pate By m 4 Exterior Date By Exterior-Date By Set- up Point Load I Isolated Footings INSULATION Date By = BG I SLAB INSULATION D Date By Data By FIRE DEPARTMENT � Foundation Walls Floors Date By < Date By Data By DECKS FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING Vault Date By Dale By OTHER Groundwork Attic Type. Date By Date By Date By D.w.v DRYWALL Type- DateInL Brace Wall Date By W By Date B r y FINAL INSPECTION 0 w Water Line Fire Separation C Dale By Date By Date By O co tD `° Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments y CD o CA 0 v Zn N r O 8 a 0 E, m 0 Z cD O J