HomeMy WebLinkAboutMIS94-0803 - MIS Permit / Conditions - 10/5/1994 Q
r. 00
ol D z
_ D7Nz
o �
w 100-
� Q
00
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback y date by Ribbons
date lb-,5/-9 by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date . by date by date by
FRAMING Walls FIRE DEPT.
date by date date by
PLUMBING Attic by OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by ddh
! by date by
Qx
bo
00 C:
0 QL
(P
Q � C
C/)
OD
10 D-
D
C.Ti --%
00
OD0
of
(D
0-+ ,
(C)
� Nz
:37 0,
:3
Q .
o n
:3 (D
00
10 0-
C)
Cyl
OD