HomeMy WebLinkAboutBLD2021-01751 Cancelled - BLD Inspections - 5/2/2024 615 W.Alder St.Bldg 8,SHELTON,WA 98584
MASON COUNTY
SHELTON: 360-427-9670 EXT 352
COMMUNITY SERVICES
j BELFAIR: 360-275-4467, EXT 352
Building,Planning,Environmental health,Community Health
ELMA: 360-482-5269, EXT 352
-- www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2021-01751 Date Issued 02/15/2022 Issued By
Project NEW SUNROOM ADDITION OFF OF EXISTING LIVING ROOM.UPPER FLOOR DECK TO BE REMOVED&
REPLACED
Site Address 481 E Leeds Dr
Applicant THOMPSON JEFFREY M&DEBRAH R
Contractor
Contractor Phone 2015 IBC, IRC,IFC,IEC,IMC,8 � `
Primary Code UPC Type
CA
Permit Type ADDITION OR REMODEL- Occupancy
yp RESIDENTIAL p y
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home ULUL
Concrete Foot/Runners Final
Other
Mason County
Mason County - Division of Community Development
�� �■ 615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
CANICEILLED www.co.mason.wa.us
FXISTING
1-01751 ADDITION OR REMODEL-
RESIDENTIAL
ESCRIPTION: NEW SUNROOM ADDITION OFF OF ISSUED: 02/15/2022
IVING ROOM. UPPER FLOOR DECK TO BE REMOVED &
EXPIRES: 08/14/2022
ESS: 481 E LEEDS DR SHELTON
PARCEL: 320221490122
APPLICANT: THOMPSON JEFFREY M & DEBRAH R OWNER: THOMPSON JEFFREY M &DEBRAH R
481 E LEEDS DR 481 E LEEDS DR
SHELTON,WA 98584 SHELTON,WA98584
978-604-8171
ARCHITECT: Williams-Architecture
PO Box 102
Shelton,WA 98584
360-426-0511
VALUATIONS: FEES: Paid Due
R-3 VB Residential, one- 180.00 $26,699.40 Technology Surcharge $16.40 $0.00
and two-family Planning Review Fee $240.00 $0.00
Uncovered Deck 154.00 $2,310.00 Plan Check Fee $323.07 $0.00
Covered Deck/Carport 110.00 $2,420.00 Change in Tenant- Minor EH $125.00 $0.00
Plan Review
State Fee-Residential $6.50 $0.00
Building Permit Fee $497.03 $0.00
Total: $31,429.40 Totals : $1,208.00 $0.00
REQUIRED INSPECTIONS
Setback Inspection Framing Inspection
Footing P tt
Ins ection.....-.e................ ..4._a....... Rough-Plumbing ins c i Cal
Foundation Wall-Pre-Pour Inspection Mechanical Inspection
Underfloor Inspection Insulation Inspection
Shearwall Inspection BLD-Final Inspection
Printed by:Genie Mcfadand on:02/15/2022 08:18 AM
Page 1 of 6
Mason County
I
Mason County - Division of Community Development
\ 615 W. Alder St. Bldg.8
LE D Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01751
CONDITIONS
* The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not
allowed without the approval of the Mason County Fire Marshal.
* Before renovating or remodeling activities in pre-1978 residential buildings or child occupied facilities and to ensure your
compliance with applicable Washington lead regulations, contact the WA State Department of Commerce Lead Paint
Program at; (360)586-5323 or email Ibpinfo@commerce.wa.gov. Visit www.commerce.wa.gov/lead for further information.
* The international code requires a fire apparatus access road for everyfacility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* WIND LOADS-Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind
speed for Mason County is 85 MPH.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* Concrete used for basement walls, foundation walls,exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* The foundationtfooting must be placed on undisturbed,firm-native soil. Place min.of 12"below natural grade.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* 'A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space
where the furnace is located, a utility room, or an approved location inside the building. When located on the elctrical panel,
the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired
Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab,
basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the
solar heat gain coefficient(SHGC) of fenestration. Where there is more than one value for each component, the certificate
shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service
water heating equipment, duct leakage rates including test conditions as specified in WSEC Section R401.3 & R402.4.1.2,
and air leakage results if a blower door test was conducted.
Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air
changes per hour when tested with a blower door in accordanve with IECC/.WSEC Section R402.4.1.2.
The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution
panel. Air leakage testing is not required for additions less than 500 square feet. Reference IECC/WSEC R402.4.1.2.
Compliance certificates are available online at the WSU Energy program website titled, " WSEC 2015 Certificate" and are
available in '/<or sheets. The Mason County Permit Center will also have some available.
Printed by:Genie Mcfadand on:02/15/2022 08:18 AM
Page 2 of 6
\ Mason County
Mason County - Division of Community Development
L L
E 0 615 W. Alder St. Bldg.8
E Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01751
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
The plan review check list and corrections are part of the approved plans and must remain attached. vIt is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* Adopted IECC/Washington State Energy Code Compliance has been approved as follows:
Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window (Max U-
Factor):0.30, Skylight (Max U-Factor):0.50, Doors (Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation
R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10.
Credits:
Fuel Normalization Credit(2)- Heat Pump 1.0
3.2 Air-source centrally ducted heat pump with minimum HSPF of 9.5.
" Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level
of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of
fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or
created.
CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
Printed by:Genie Mcfarland on:02/15/2022 08:18 AM
Page 3 of 6
,
Mason County
tMason County - Division of Community Development
..�- 615 W. Alder St. Bldg.8
Shelton, WA 98584
�.� 360-427-9670 ext 352
I L ED
www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01751
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
" All property lines shall be clearly identified at the time of foundation inspection.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
Printed by:Genie Mcfariand on:02/15/2022 08:18 AM
Page 4 of 6
Mason County
1 Mason County - Division of Community Development
�1
615 W. Alder St. Bldg.8
Nilton,WA 98584
C A�� `E LED 360-427-9670 ext 352
L www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01751
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.)Septic tank(s)requires 5ft setback from all footing/foundations.
C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
* A separate inspection in addition to the inspections required in the IBC, Section 110 shall be required in accordance with
the 2015 IBC, Section 1705.12.2 and Section 1707.1. The additional inspection is required when shear wall fastener
spacing is required to be 4 inches or less. The shear wall schedule shown on sheet designate wall(s)type and
with fastener spacing 4 inches or less.
The required inspection may be performed by the Mason County Building Department, a WABO certified inspector, certified
to inspect lateral connections, the Engineer of record (EOR), or an authorized representative of the (EOR). The special
inspectors duties and responsibilities shall be as specified in Chapter 17. When a third party inspector is used to perform the
inspection, special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton,
WA 98584 and also available on site for review by the Building Official. Inspection reports shall be completed and submitted
to the Mason County Building Department in a timely manner and shall be submitted prior to the framing inspection of said
project.
* All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this
proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION.
* Attic Ventilation: IRC section R806
Enclosed attic and rafter area shall be supplied with cross-ventilation.The net area shall not be less than 1/150 of the area
of the space to be ventilated. If 50%and not more than 80%of the ventilating area is provided from the upper portion of the
space to be ventilated, then 1/300 is allowed.
* All wall cavities serving as exterior walls, exposed during construction or remodeling work shall be insulated to the full
depth of the wall cavity and inspected prior to covering. Insulation R-values shall be as follows: 2x4 wall cavities min. R-15
and 2x6 wall cavities min. R-21.
Printed by:Genie Mcfadand on:02/15/2022 08:18 AM
Page 5 of 6
Mason County
Mason County - Division of Community Development
1
•- - 615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
CANCELLED www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01751
* All replacement windows shall be installed per manufacturer's specifications and be flashed per IRC/WAC Section R703.4.
All installations shall meet requirements for safety glazing per R308.4. WSEC requires a U-factor of.30 or less in all heated
spaces. Existing, non-conforming, egress window openings are not required to be enlarged, but it is highly recommended.
Egress windows replaced in an existing opening shall be brought into compliance with current codes if a product is available
for this application. Building plans/permit are required for windows in new, enlarged or relocated openings these installations
must meet all current codes.
Windows and doors shall be installed in accordance with the manufacturer's written installation instructions and shall be
available during inspections.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authoriz d�Agent: 1'/ Date: s
Printed by:Genie McFarland on:02/15/2022 08:18 AM
Page 6 of 6