Loading...
HomeMy WebLinkAboutCOM2022-00003 Replace Generator, Refridgeration, Fence, Doors - COM - 5/3/2024 fmMASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 ' COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 BELFAIR:360.275-4467,EXT 352 Buildlnq,Plannin%Environmental Health,Community Health ELMA:360-482.5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number COM2022-00003 Date Issued 02/11/2022 Issued By Project REPLACE/RELOCATE GENERATOR&REF CONDENSER,ENCLOSE W FENCE AND INSTALL DOORS IN MECHANICAL ROOM OUTSIDE THE QFC, Site Address 201 NE State Route 300 Applicant QUALITY FOOD CENTER#70500101 Contractor Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW COMMERCIAL PERMIT Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "'THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.-- PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks -24•Z2 Slab "(-Z4•ZZ J� Footing Perimeter 'j•24 2-z- J 7L Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing '1•yZ.-yZ J l-L, Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical r s t Gas Piping -2,31 OEM Rc erL;#1¢5 Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building --z 'R_ Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other r14s 71 rttS �'Gt4yc Z l t�t` ✓�xw� 44N+ -,,-8.2-4 J7L (?W) f � Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us F 2-00003 NEW COMMERCIAL PERMIT ESCRIPTION: REPLACE/RELOCATE GENERATOR& REF ISSUED: 02/11/2022 R, ENCLOSE W FENCE AND INSTALL DOORS IN AL ROOM OUTSIDE THE QFC, EXPIRES: 08/10/2022 ESS: 201 NE STATE ROUTE 300 BELFAIR PARCEL: 123294290001 APPLICANT: QUALITY FOOD CENTER#70500101 OWNER: QUALITY FOOD CENTER#70500101 C/O NICKEL&CO, LLC C/O NICKEL&CO, LLC CINCINNATI,OH 45202 CINCINNATI, OH 45202 1.360.953.8517 VALUATIONS: FEES: Paid Due Project Valuation (BID, 45000.00 $45,000.00 Technology Surcharge $23.57 $0.00 ESTIMATION-) Building Permit Fee $641.46 $0.00 State Fee-Commercial $25.00 $0.00 Plan Check Fee $416.95 $0.00 Mechanical Base Fee $30.00 $0.00 Mechanical Fees $56.00 $0.00 Plumbing Fees $9.00 $0.00 Plumbing Base Fee $25.00 $0.00 Total: $45,000.00 Totals : $1,226.98 $0.00 FIXTURES (tyt Mechanical Fixtures (sty Plumbing Fixtures 4.0000 Other 1.0000 Other REQUIRED INSPECTIONS Setback Inspection Mechanical Inspection Footing Inspection Generator Installation Printed by:Genie Mcfarland on:02/11/2022 11:46 AM Page 1 of 3 r � Mason County Mason County - Division of Community Development l' 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2022-00003 Rough- Plumbing Inspection BLD-Final Inspection CONDITIONS * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * All property lines shall be clearly identified at the time of foundation inspection. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * The foundation/footing must be placed on undisturbed, firm-native soil. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. Printed by:Genie Mcfarland on:02/11/2022 11:46 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2022-00003 * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * The equipment sound readings noted on the approved plans shall be maintained. Any equipment installed exceeding the approved documents sound readings or equipment in violation of state or local statutes shall be mitigated through proper identification of sound levels by a qualified person or firm and shall be mitigated to reduce any excess sound levels to at or below allowed levels. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Auth 4 d Agent: Date: Printed by:Genie Mcfarland on:02/11/2022 11:46 AM Page 3 of 3