HomeMy WebLinkAboutMIS93-0358 - MIS Permit / Conditions - 7/14/1993 OQ
� o
o
" " O00o
0- z
oQL
cn
� 0 �
O ()
:3 (D
0-
00Q
CJI
00
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date/-Zoo-4-�-> by D Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
OQ
008 D
0 D Cn
x0
00
o � z
n
° CO
� = c
cnN z
3
O n
Z3 (D
�
0-
OQ
00
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date by
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by