Loading...
HomeMy WebLinkAboutBLD2002-01688 RV Carport - BLD Permit / Conditions - 5/22/2003 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 1P* Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2002-01688 OWNER: DAN DUBIAK RECEIVED: 1/3/2003 CONTRACTOR: LICENSE: EXP: ISSUED: 5/22/2003 SITE ADDRESS: 561 E QUAIL HILL RD BELFAIR EXPIRES: 11/22/2003 PARCEL NUMBER:,w122094390150' LEGAL DESCRIPTION: TR 15 OF SW SE NOW PARCEL B OF SP#379 AF#343351 561 E QUAIL HILL RD BELFAIR PROJECT DESCRIPTION: DIRECTIONS TO SITE: RV/STORAGE HWY 3 TO ALLYN. RIGHT ON NORTH BAY PAST FISH HATCHERY. LEFT ON QUAIL HILL RD. SECOND TO LAST HOUSE FROM TOP. LEFT SIDE OF ROAD General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms. `Type of Constr.: V-N Type of Use: SF Insp. Area: No. of Bathrooms: - y Occ. Group: U-1 Lot Size: Deck: Type of Work: ACC Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building: Garage-Detached 1,296 Valuation: Building Height: 16 c c. Status: Basement: Manufactured Home Information Setback Inf60yTpji Shoreline& Planning Information Water Malae: Length: Ft. Front: Ft. e: Ft. SEPA?: Model: Width: Ft. Rear: Ft. e: Ft. Shoreline Desig.: Side 1: Ft. Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee BLR 1/3/2003 $274.01 1673 EH Plan Review ADR 1/8/2003 $35.00 B12003 Building State Fee MRG 1/13/2003 $4.50 612003 Building Permit Fee MRG 1/13/2003 $421.55 B12003 Total $735.06 r BLD2002-01688 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR . BLD2002-01688 ` CONDITIONS FOR B LD2002-01688 �1 1) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X 2) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department r�or to any further inspections being performed or approvals granted. x (__ 3) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or X cont r ail� to post the address on site prior to requesting inspections. 4) The plan review check list and corrections, along with the Energy Compliance Worksheet (when applicable) are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans o site or the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspeCt� X 5) The "approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" plot plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the B� gpartment prior to any further inspections being performed or approvals granted. X CC,, JJ 6) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If ocuments are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charg ail be collected by the Building Department prior to any further inspections being performed or approvals granted. X 7) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County nd the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupai cy-would result in permit revocation. X , BLD2002-01688 Please refer to the following pages for conditions of this permit. 2 of 3 8) All changes to "approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County X dipa0e�egulation, must be reviewed and approved by Mason County prior to construction. 9) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the niform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspect r s all be made prior to requesting additional inspections. X 10) All property lines shall be clearly identified at the time of foundation inspection. X 11) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure t�alequest a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-oori}¢It . -with Mason County ordinances and building regulations. X 12) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for actiA for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the per h Id h ve prevented action from being taken. No more than one extension may be granted. X 13) The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical report or assessment. Structures and /or land modifications (grading, cuts, fills, etc.) required in the geotechnical-rep�irt/;assessment, may require a seperate permit. The geotechincal report/assessment shall remain attached to the approved building plans. X (o � 14) Proposed�ct�rre(s) must maintain a minimum of a 20' setback from all property lines, easements and 25' from all County and State Road right of ways. X � I 15) Approved per dimensions and setbacks on submitted site plan. X This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence f continuation of w is a progress inspection within the 180 day perod. Final inspection must be approved before building can be occupied. OWNER OR AGENT: ��_� DATE: _S —7 �7 BLD2002-01688 Please refer to the following pages for conditions of this permit. 3 of 3 00 r 0 o CONCRETE MECHANICAL MANUFACTURED HOME 0 N Footings I Setbacks Date By Ribbons b 08 Date By Gas Piping Date B y 00 w Foundation Walls Date B y Set-up Date By INSULATION Date B y B G / Slab Insulation Floors Final Date By Date B y Date B y FRAMING Walls FIRE DEPT Date By Date B y Date B y PLUMBING Attic OTHER Groundwork Date By Date By WALLBOARD NAILING D.W.V. Date By Date By FINAL INSPECTION Water Line Date By Date By Date B y _ ....................::......::. 2 y' -D b' �� ale— 257 % cc cm cn 0 0 ch Cn 0 Gd C� r d �d N O 3_ N x i O O� 00 Z 00 0 Building Permit # (?�>2 MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 ORRECTION NOTICE Job Location `r6l "W This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection ❑ OK to ❑ This is not a complete inspection Department C,4to Date � ~ Inspector Do * NO *T ', MO OV ' TH11-4 TAB IP14Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360) 427-9670 Local (360)482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection November 08, 2007 DAN DUBIAK 481 NE OLD BELFAIR HWY BELFAIR WA 98528 Case No.: BLD2002-01688 Parcel No.: 122094390150 Proiect Description: RV / STORAGE The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $64.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $64.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 359. Sincerely, Terry Ryan Mason County Department of Community Development Cc: Property File November 08, 2007 BLD2002-01688