Loading...
HomeMy WebLinkAboutBLD2008-01309 Cancelled Reroof - BLD Permit / Conditions - 10/22/2008 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box f 186 , Not$ Shelton,WA 98584 MECHANICAL PERMIT BLD2008-01309 OWNER: STEVEN, ROCKEY RECEIVED: 10/22/2008 CONTRACTOR: EXCALIBUR ROOFING (360)432-8837 LICENSE: EXCALRR998KA EXP: 3/30/2009 ISSUED: 10/22/2008 SITE ADDRESS: 370 E POINTES DR EAST SHELTON EXPIRES: 4/22/2009 PARCEL NUMBER: 121195000157 LEGAL DESCRIPTION: HARTSTENE POINTE LOT: 157 PROJECT DESCRIPTION: DIRECTIONS TO SlTE. REROOF HARTSTENE POI General Information Setback Information Type of Use: SF Insp.Area: ont: Ft. Shoreline: Ft. Type of Work: RR Fire Dist.: 5 Rear: Ft. Slope: Ft. Valuation: Side 1: Ft. Side 2: Ft. Mecha ical Fixtures FEES Type Type By Date Amount Receipt Building State Fee KS 10/22/200 $4.50 S120080000 Re-Roof Fee KS 10/22/200 $110.00 S120080000 Total $114.50 BLD2008-01309 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2008-01309 CONDITIONS FOR BLD2008-01309 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 11_800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. 2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 1 V en 1, 3) SINGLE RAFTER JOIST ROOF REPLACEMENT SHALL BE INSULATED TO A MINIMUM OF R-30 ALLOWING FOR A MINIMUM OF ONE INCH CONTINUOUS VENTED AIRSPACE ABOVE THE LEVEL OF INSULATION. X 4) Existing roof shall be insulated to a minimum of R-30 if: The roof is uninsulated or insulation is removed to the level of the sheating, OR All insulation in ZZro f/ceiling was previously installed exterior to the sheating or nonexistant. 5) Per 2003 IRC -SECTION 1609 -WIND LOADS- 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 X�S CCI�ID SPEED (3-SECOND GUST)the wind speed for Mason County is 85 MPH. 6) Per IRC- SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in apcorclance with the applicable provisions of this section and the manufacturer's installation instructions. XIL46 7) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with M son County ordinances and building regulations. XL&i BLD2008-01309 Please refer to the following pages for conditions of this permit. 2 of 3 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be oocupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the ow.brs behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described ev and structure for review and inspection. In OWNER OR AGENT DAT IA E: l V BLD2008-01309 Please refer to the following pages for conditions of this permit. 3 of 3 o CONCRETE Gas Piping MANUFACTURED HOME p o -- Intenvr-Date By — — 0 Footings!Setbacks Extercx Date By Ribbons Data By INSULATION Date By coo Foundation Watts BG!SLAB INSULATION Set-up .N.I Date By Date By Date By FRAMING Floors FIRE DEPARTMENT m Gate BY Date BY Date By waft PLUMBING Date By DECKS Date By Groundwork Vault TANKS Date By Date BY Date BY Attic o.w.v Date BY OTHER Date By DRYWALL Type. Date By Water Lime Date By Type: Date BY Int.Brace Wall Date By W BNY MECHANICAL FDlareeSepefation FINAL INSPECTION a co Date By Date By Date B7 ap s Pass or Request Inspect. E Type of Insp. Fail Date Date Done By Comments a o a v CD m 0 8 a o' 0 v m O J