HomeMy WebLinkAboutBLD2004-01299 Cancelled MFG Home - BLD Permit / Conditions - 6/16/2004 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext. 352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
i�
RESIDENTIAL BUILDING PERMIT BLD2004-01299
OWNER: BETA TRUST RECEIVED: 8/12/2004
CONTRACTOR: LICENSE: EXP: ISSUED: 9/16/2004
SITE ADDRESS: 210 E TEEPEE LN BELFAIR EXPIRES: 3/16/2005
PARCEL NUMBER: 122077590651
LEGAL DESCRIPTION: TR 65 OF SURVEY 5/94-96
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
MANUFACTURED HOME - SW ON RASOR. LEFT ON UNDERLINE. RIGHT ON TEE PEE LN. LOT IS
ON RIGHT SIDE
General Information Construction &Occupancy In mation Square Footage Information
No.of Bedrooms: 3 Typfic.
ns r.: V-N
Type of Use: MH Insp.Area: OT No. of Bathrooms: 2 1-0R- Lot Size: Deck:
Type of Work: NEW Fire Dist.: 2 No. of Stories: 1 o Building:
Valuation: Building Height: 16 St s: ar Basement:
Manufactured Home Info ' n S tba I f m n Shoreline& Planning Information
Make:BENDIX Len(th:
66 Ft. Front: N 0 Ft. oreline: Ft. Water Body: NONE
Rea S 5. Slope: Ft. SEPA?: No
Model: Wi 28 Ft. ide W 75.0 Ft.
Shoreline Desig.: Urban
Year:1980 Serial SD3089AB E 122.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixt es Mechanical Fixtures FEES
Type Type Qty. Type By Date Amount Receipt
Mobile Home Submittal Fee NJP 8/12/2004 $214.50 S22004
Planning Review Fee NJP 8/12/2004 $155.00 S22004
Address Fee GMM 8/27/2004 $140.00 S22004
Building State Fee LDK 8/31/2004 $4.50 S22004
Mobile Home Issuance Fee LDK 8/31/2004 $214.50 S22004
EH Plan Review CEW 9/1/2004 $75.00 S22004
Total $803.50
BLD2004-01299 Please referto the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
BLD2004-01299
CONDITIONS FOR
BLD2004-01299
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-4 . The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X ,7
2) The Uniform Fire Code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such ro � onnect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X
3) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that
require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the
access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted
by the jurisdictio �nd the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting
inspections
_ ZJX
4) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X - ,
5) The "approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then
approval will not fie granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Dep rtt nt prior to any further inspections being performed or approvals granted.
X �-.•��
6) Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State
Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present
to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified
installer responsible for each major part of the installation. RCW43-63B.090
An approved,Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD certification tag or temporarily
located in plain site within tf�e of the home's front entry. There shall be one certification tag for each certified installer accounting for the work that each
installer performed or in d. certification number and signature of the certified installer responsible for each major part of the installation.
WAC365-210 X ✓7�t
BLD2004-01299 Please refer to the following pages for conditions of this permit. 2 of 4
7) If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the instructions of the American
National Standards Institute (ANSI). To order the ANSI instructions you may either get an order form from the Mason County Building Department or you
can contact the Offfice of Manufacturing Housing (360) 725-2800.
8) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X
9) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. ccupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation&I-
10) X
REQUIRED INSPECTIONS (Footing Inspection-prior to pour, Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all
responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the
inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by the Mason
County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been
discovered. I further understand that this investigation will be scheduled as tirpie allows. Until resolution of any/all problems no occupancy(Final
Inspection)will be granted for the residence.
OWNER/CONTRACTOR(indicate which) Signature X
11) This permit is l for the place t and installation of the manufactured home only and does not imply approval or review for any other items indidcated on
the plot plan. X
12) All changes to "ap roved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or r ion, must be reviewed and approved by Mason County prior to construction.
X
13) The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including
installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be
clearly marked in the installation instructions.
14) Owner/applicant must obtain a seperate per ` f r the placement of any size propane tank serving a fixed appliance within a dwelling structure or unit
prior to the placement of the tank. X
15) All property lines shall be clearly identified at the time of foundation inspection. X
16) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason CouL-0
nces and building regulations.
X
17) All permits expire 1,,80 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder ha wd action from being taken. No more than one extension may be granted.
X
BLD2004-01299 Please referto the following pages for conditions of this permit. 3 of 4
18) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and flashi ' Install metal connectors approved for contact with the new types of pressure treated material.
X r
19) All upland areas disturbed or newly creat d construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt
fencing or straw matting). X
20) ApproverC dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
This permit becomes null and void if work orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or th agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described property and str cture for r i w a nspection. /
OWN ER OR AGENT: _ ,�.•� DATE:_ q ! C�
BLD2004-01299 Please refer to the following pages for conditions of this permit. 4 of 4
CONCRETE MANUFACTURED IIO
` - ME GHANICAL -__~.
Footings/Setbacks Date Bp Ribbons
Date
L- B .• , Gas Prping Date g
Foundation ally y
Date` By Set-up
Date By INSULATION . Date
B G 1 Slab Insulation B y
I Floors _ Final
_j Date BY Date By Date By
FRAMING WaIls FIRE DEPT
Date By Date
PLUMBING . B y Date B y
Attic OTHER
Groundwork Date
By
Date By WALLBOARD NAILING
D.W.V. Date By
Date By FINAL INSPECTION
Water Line Date g
Date By y
`!Pi:OF 3NSpE aV bate By
m FSu b�(LES7"
m- c
CD
m
o
. o
8
a ,
0
rn
CD
m
V - i
.r
J
0
.y,
J
Mason County Dept. of Community Development
Mason County Bldg. 3
426 W. Cedar
P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma
rioShelton, WA 98584 (360) 275-4467 Belfair
Notice to Obtain Final Inspection
November 07, 2007
GREG BALDWIN
2709 WETMORE AVE
EVERETT WA 98201
Case No.- BLD2004-01299
Parcel No.- 122077590651
Project Description- MANUFACTURED HOME -
The Mason County Department of Community Development is currently reviewing all
permits that are expired and have not been approved for occupancy and use.
Pursuant to Mason County Code, Title 14 Building and Construction, a permit and
final inspection for this type of activity is required under the 2006 International
Building Code and your property is currently in violation status of occupancy and use.
Please contact our office to make the necessary arrangements 21 days from
the date of this letter. Failure to contact our office to make the necessary scheduled
inspections will result in enforcement actions.
To bring your site into compliance, you must schedule an inspection. One (1) $64.00
site investigation fee will need to be paid prior to inspection along with any
outstanding fees currently due on your building permit. For every inspection required
after that, you will be charged $64.00 again, per inspection until final inspection and
conditions are met.
To schedule an inspection, please call (360) 427-9670 ext. 262.
If you should have any questions regarding this notification, please contact me at
(360) 427-9670 ext 359.
Sincerely,
Terry Ryari
Mason County Department of Community Development
Cc- Property File
November 07, 2007 BLD2004-01299