July 26, 2010
Olympia Federal Savings
P.O. Box 337
Belfair, WA 98528
RE: Griffey's Stream Buffer Restoration Bond Release
To whom it may concern,
I am writing in regard to account number 0330032755, which is a joint interest bond held by you for Ryan
Griffey and Mason County. I am requesting that the full bond amount of$500 be released to Mr. Griffey
and that Mason County be cleared of all interest in this account.
Thank you for your assistance in this matter.
Sincerely,
Rebecca Hersha
Planner
Mason County Planning Department
(360)427-9670 x287
cc: Ryan Griffey • PO Box 262 • Allyn, WA 98524-0262
wT- -T -
'�EPr29-2005 THU 04: 13 PM OLYMPIA FEDERAL FAX NO, 3602756003 P. 02
Sfp 20 05 07: 35a Diana Griffea 3602753165 P• I
MASON COUNTY BOND FORM
Type of Permit: �;Yi�2.rv.i r �.•rc�-�
Type of Improvement: N o r j t-6
Project location: C<`
Legal Description of Property:
r! Ro,rge
With reference to the above-identified matter,this will certify that this institution has a
savings account(or loan)for the above-referenced owner/developer/contractor for-the
project so identified. In consideration of the permitted improvement,and in lieu of a
performance bond,this institution hereby agrees that it will freeze the following sums of
money for the indicated improvement pending written authorization for release of said
funds by in.the amount of$ �Cb•GG Dollars.
The total sum indicated will be withheld by this institution from any disbursements of
any kind until written authorization has been received by this institution from Mason
County to release the sum of money indicated by the written authorization from the
County.
The design,location;materials and other specifications for the indicated improvement are
those required by Mason County as appears in the above-referenced docurnent/pemai't,
and shall be in cotpphance with the Mason County Resource Ordinance, Chapter 8.52
Mason County Code as ameuded.
Thee funds shall/ b •be held by the institution for a period of three years. rn the event that
_ G1 y� � C.(� (responsible parry's flame)does not comply with the
aforementioned rNuiremen ,Mason County may demand, and the institution shall
make,payment to Mason County of said funds so that the necessary repairs can be
perf��)=tned immediately to Masora County standards. The institution shall not be liable to
&V`4ee A (responsible patty's name) for any disbursement of
said funds to Mason CounVA The conditions in this agreement may only be amended or
revoked by express written con 'tion o Mason County.
Signatureg Responsible P44-f' Date
r �
Confidential Page 1 Form Revised:03/25/03
SEP-29-2005 THU 04: 13 PM OLYMT FEDERAL FAX NO, 3602756003 P. 03
odP ca, u;D uv: ,7oa uiana ciriffev 3602753165 p. 2
i
.J
Accepted: a CA
Name of Rkik/Phoua Number
Approved:
ntle: -A �-
Bank Address
Date
b 3�si��2-� �s' •
Account Number
STATE OF WASNINGTON,
County of m It�D n (Individual Acknowiedgem=t)
I, �i11 LVi e, AV1V\ ` ,Notary Public in and for the State of
Washington,residing at do hereby certify that
on this day of �' ,20 < ,personally appeared
before me L — to me Imown to be the individual
described herein and who executed as instrument and acknowledged that
signed and sealed the same as ' free and voluntary act and deed for the uses
and purposes hcrain mentioned.
GIVEN UNDER MY#AND AND OFFICIAL SEAL this 2-0 day of
-1� 20
Public in an for the State of
_ -'."a ►,R Fa gton, residing at
s r u1 said
�Z'%ter
C My Commission expires
v
Confidontiai Page 2 Form Revised,03M/03
Page 1 of 3
Rebecca Hersha - RE: buffer mitigation
From: Rebecca Hersha
To: Ryan Griffey
Date: 7/26/2010 10:21 AM �� �7 I-)�/ non
Subject: RE: buffer mitigation TO BE KEPT IN THE
FAnCEL
FILE—
Hello Ryan,
I visited your property on 7-19-10 and found your restoration to be adequate and am sending a letter to
Olympia Federal Savings to release your bond.
Sincerely,
Rebecca Hersha, Planner 2
Mason County DCD
360-427-9670 ext. 287
>>> On 7/8/2010 at 6:41 PM, in message <BAY148-w55528792309C7A178AE3FBD4B50@phx.gbl>, Ryan
Griffey <rgriffey65@msn.com> wrote:
Rebecca,
The paths were not drawn into the plan because the property was overgrown by blackberries and nettles.
Some of the blackberries were 15' tall in the trees. It was impossible to navigate. When I planted the cedar
trees I hand chopped them out and over the course of three years they were finally manageable. I haven't
planted anything other than cedar trees and ferns at this point because the small plants get overtaken by
invasive species such as buttercups/blackberries. I've tried to keep those at bay by weedeating on a regular
basis. I've let the salmon berries/nettles/thimbleberries/alders and maple trees grow without much
interruption.
The other issue is that the property was extensively damaged by flooding, I believe in the winters of 2006
and 2007. Lucas Creek runs through the property and Coulter Creek runs along the border as well as
a seperate channel that was created by a beaver dam upstream of the property. When it floods the whole
lower portion the the property is covered in two feet of water and silt.
I think I planted about 40 cedar trees overall and I think all but three of them have survived.
If you want me to put more plants in I will do so at my first opportunity.
Thanks,
Ryan Griffey
Date: Thu, 8 Jul 2010 08:27:10 -0700
From: Rebecca H @co.mason.wa.us
To: rgriffey65@msn.com
Subject: RE: buffer mitigation
file://C:\Documents and Settings\RebeccaH\Local Settings\Temp\XPgrpwise\4C4D6IA9... 7/26/2010
Page 2 of 3
Oh ok, that's fine. I wonder why Lee Boad didn't draw them in. Well, I will just be looking to make sure the
plants are all there, per the HMP, and healthy.
Sincerely,
Rebecca Hersha, Planner 2
Mason County DCD
360-427-9670 ext. 287
>>> On 7/7/2010 at 7:36 PM, in message <BAY148-w6107618EF35B6B4BE304E9D4B40@phx.gbl>, Ryan
Griffey <rgriffey65@msn.com> wrote:
The paths were put in before I ever took possesion of the property.
In addition, I never received written notice from the county that they had to come out.
Ryan Griffey
Date: Wed, 7 Jul 2010 11:14:58 -0700
From: Rebecca H@co.mason.wa.us
To: rgriffey65@msn.com
Subject: buffer mitigation
Hell Mr. Griffey,
Please refer to the email below that I sent to you in January 2009. 1 will be performing a site visit within
the next month to see that you have removed the gravel walkways within the buffer and completed the
mitigation as detailed in your approved Habitat Management Plan (for VAR2005-00002 and BLD2005-
01233). This is a courtesy warning that if the above has not been completed, Mason County will open an
enforcement case on the parcel and may issue fines and schedule a public hearing.
Thank you.
Sincerely,
Rebecca Hersha, Planner
Mason County DCD
(360) 427-9670 extension 287
****************************************************************
1/5/09
Hello Mr. Griffey,
Your request for a bond release was forwarded to me recently. Thank you for your efforts to restore the
critical areas and buffers for your Variance (VAR2005-00002). However, I see that you have not submitted
the three annual monitoring reports required in the County's Staff Report and the Hearing Examiner's
Decision. These reports shall be prepared by a qualified biologist detailing the condition of the restoration
area.
Also, on January 2, 2009 I visited the site. I found the following inadequacies:
file://C:\Documents and Settings\RebeccaH\Local Settings\Temp\XPgrpwise\4C4D61 A9... 7/26/2010
Page 3 of 3
1. You created graveled walkways in or within the buffers of the wetland and streams. These gravel
walkways were not in your approved Habitat Management Plan.
2. I found several cedar trees planted, but very few shrubs, ferns, and groundcover. Trees shall be 10
feet apart, shrubs shall be 4 feet apart, and ferns shall be 3 feet apart. This planting density was not
observed on January 2, 2009..
Please closely review the mitigation section of your approved Habitat Management Plan. When you feel
that the mitigation is complete, please hire a qualified biologist (like Lee Boad) to submit annual monitoring
reports to Mason County Planning, for three consecutive years.
Thank you.
file://CADocuments and Settings\RebeccaH\Local Settings\Temp\XPgrpwise\4C4D61A9... 7/26/2010
Ryan Griffey
Replanting Plan
Page 2 of 2
1. Planting will be as per the recommendations in the Habitat Management Plan:
Trees- 10' on center
Shrubs-4' on center
Ferns- 3' on center
Trees: western red cedar
Shrubs: salmonberry
Ferns: sword fern
Groundcover: kinnikinnik
Coastal strawberry
2. Zone A, located along both sides of Lucas Creek will consist of western red cedar
and sword fern with one row of salmonberry down each side of the stream. It will
include the thinning and eventual removal of invasive/non-native species, mostly
of which is Himalayan Blackberry. Removal of Blackberry bushes will occur as
replanted materials take over.
3. Zone B, located in the current designated Wetland Zone and part of the currently
cleared area will be planted with western red cedar, kinnikinnik and sword fern.
In order to restore this area a significant amount of grass and comfry will be
removed by hand.
4. Zone C, is inhabited by a very large old growth spruce as well as a big leaf maple
tree. This area transmits very little light and therefore will be left natural. I do
not believe that anything will grow well in this area.
5. A majority of the cedars will be 3ft. and larger to help prevent the Blacktail Deer
from eating them.
r
surrounding land use. The size of the proposed structure appears to be consistent
with the surrounding single-family residences as noted in the response to question
one. The proposed location for the new structure will be in an area that contemplates
the least impact on critical areas.
S. The public interest will suffer no substantial detrimental effect. The proposal is
consistent and compatible with the surround land uses. The structure will be built to
current Mason County codes.
6. The granting of the variance is necessary for the placement of any structure on this
lot due to the required buffer/setbacks from streams and wetlands.
IX. Conclusions. Upon the above discussion the proposal is consistent with the
variance criteria detailed in Section 17.01.150. Staff recommends approval of the
proposal subject to the conditions listed below.
1. Developers and individuals shall be required to control erosion during
construction. Removal of vegetation shall be avoided and any areas disturbed
should be restored to prevent erosion and other environmental impacts.
2. The existing natural vegetative buffer shall remain undisturbed by any
construction and/or development activities on the parcel.
3. The provisions and recommendations of the Habitat Management Plan shall
be enacted.
4. All upland areas disturbed or newly created by construction activities shall be
seeded,vegetated or given an equivalent type of erosion protection(silt
fencing or straw matting).
5. A detailed planting plan, with species composition, density, and distribution
shall be provided to and approved by planning staff prior to final approval of
the building permit.
6. A monitoring plan shall be enacted whereby a qualified biologist shall submit
a report detailing the condition of the restoration area. This report shall be
due on the anniversary date of the issuance of the building permit and shall be
submitted annually for three years.
7. A survival rate of 90%of plantings is required each year during the three-year
monitoring period. If survival falls below 90%, the applicant shall replant to
restore the required survival percentage and shall extend the monitoring report
the necessary period to address the replantings.
8. A restoration bond shall be established with Mason County in the amount
necessary to perform the restoration prior to final approval of building permit.
9. No degradation of water quality shall occur as a result of this project.
10. A title notification of habitat management plan shall be recorded with the deed
prior to final approval of the building permit(Attachment 10).
X. Choices of Action.
1. Approval of the Variance request.
2. Denial of the Variance request.
Lee Boad Habitat Management Planning and Wetland Services
PO Box 2854 •Belfair, WA 98528 . 360-620-0618 • leeboad anhctc.com
REC'E �f ?
f'"V :'
Griffey Residential Construction Project _
Habitat Management Plan
Parcel12209-24-00041
Prepared for:
Ryan Griffey
PO Box 181
Allyn,WA 98524
Prepared by:
Lee Boad
Lee Boad Habitat Management Planning and Wetland Services
PO Box 2854
Belfair,WA 98528
leeboad@hctc.com
Table of Contents
Griffey Residential Construction Project Habitat Management Plan
1.0 Introduction.......... 2
........ ....................................................
2.0 Project Description... ...... ........................ ......... ....................2
3.0 Property Description............... ........ 2
......................... .............
4.0 Applicable Setbacks.............. 4
.... .................................... ... ....
5.0 Species Information............ ......... ............ ............................4
6.0 Potential Development Impacts......... ... ...... ..................... .........5
7.0 Mitigation Measures......... ...................... 6
.. ......... ...... ... ...... ...
7.1 Preservation of Critically Important Plants
7.2 Seasonal Consideration of Construction Activities
7.3 Recommended Best Management Practices
7.4 Riparian Corridor Restoration
7.5 Minimizing Wetland Impacts
8.0 Monitoring... .................. .......................... g
.................... .....
9.0 Conclusion... ................ g
..... ........................... ............. ... .....
Recommended Citation:
Lee Boad Habitat Management Planning and Wetland Services. January 2005.
"Griffey Residential Construction Project,Habitat Management Plan and Wetland
Report". Belfair, WA. Prepared for Ryan Griffey.
1
1.0 Introduction
At the Request of Ryan Griffey, a Habitat Management Plan and Wetland Report has
been prepared for the proposed residential construction at 461 Coulter Creek Road. This
parcel is mapped in Section 9 of Township 22 North, Range 1 West. The property is
recorded by the Mason County Tax Assessor's Office as Parcel #12209-24-00041. All
observations reported in this report relate to this parcel unless otherwise stated.
2.0 Project Description
This report addresses the proposed construction of a single-family residence within the
protected buffer of a Type 3 Stream and a Category U Wetland Vegetation Area. The
proposed construction site utilizes an area of the property that has been maintained as a
cleared and graveled area for several decades. By using this location,disturbance to the
stream buffer and wetland vegetation area within the ownership is minimized to the
maximum extent. The recommended building footprint within the buffer totals 1,800
square feet. The proposed building size and site location has been recommended to result
in no net loss of function or value to the stream buffer or wetland vegetation area.
3.0 Property Description
The property consists of 1.12 acres located on Coulter Creek Road in Allyn, Washington.
Coulter Creek and an associated side channel flow through the northern section of the
property. Lucas Creek,a Type 3 Tributary to Coulter Creek runs through the western
section. The riparian area surrounding Coulter Creek consists of a partially fragmented
conifer/deciduous forest and scattered palustrine emergent/scrubshrub wetlands. The
northern portion of Lucas Creek is also associated with the above-mentioned wetland.
Within the property,the southern section of Lucas Creek consists of mature deciduous
trees with an under-story heavily impacted by invasive exotic species that have
significantly hindered riparian succession.
The cleared and managed upland area makes up .29 acres of the total ownership
(approximately 12,350 square feet). Nearly all of this area lies within the stream buffer
and wetland vegetation area.
2
4 tZ
A ..g �
Figure 1. Proposed building location
Figure 2. Lucas Creek(100' from building site)
3
Figure 3.Wetland location in relation to proposed building site
4.0 Applicable Setbacks
This site is within the jurisdiction of Mason County. Ordinance 17.01.110 identifies Fish
and Wildlife Habitat Conservation Areas adopted by Mason County.
The a licable setbacks encompassing this property are as follows:
Habitat Type Buffer Building Setback from Buffer
Type 3 Stream 150' 15'
Type 1 Stream 150' 15'
Category II Wetland 85' 15' _
5.0 Species Information
Puget Sound Chinook(Oncorhynchus trhawvtsha) Threatened
Listed as threatened since March 24,1999 adult Puget Sound Chinook spawn in several
rivers and streams flowing into Puget Sound. In the vicinity of the proposed project area,
summer/fall Chinook spawn in Coulter Creek and Sherwood Creek. These stocks are
assumed to be of hatchery origin,as these particular systems do not uphold habitat
characteristics typical of"Chinook Systems". There are no nearby streams that would
support core populations of Puget Sound Chinook,
Designated Critical Habitat For Puget Sound Chinook
Critical habitat includes all marine, estuarine,and river reaches accessible to Chinook
Salmon in Puget Sound. Therefore, critical habitat is present within the vicinity of the
project area, The entire project footprint is above the Ordinary High Water Mark. There
will be no shoreline construction or modification associated with this project. The
4
restoration program associated with this project is designed to have a net benefit on the
riparian habitat.
Bull Trout(Salvelinus malma)-Threatened
Bull Trout typically inhabit very cold headwater streams. Suitable habitat for Bull Trout
is not present within the vicinity of the project area. Therefore,the proposed project is
not likely to have any adverse impacts on Bull Trout.
Bald Eagle(Haliaeetus leucocephalus)-Endangered
Stands of second growth,deciduous, and deciduous/coniferous mix forests are in
proximity to the project site. Wintering Bald Eagles have been observed in the vicinity of
the project area. Foraging habitat encompasses a large vicinity of the surrounding area
and is supported by the abundance of anadromous fish returning to Coulter Creek.
Foraging and nesting habitat will not be negatively impacted by the proposed project, as
no vegetation removal will occur. The restoration program associated with the project
will likely have a net benefit.
Marbled Murrelet(Brachyramphus marmoratus)-Threatened
No old growth forests surround the site or are in vicinity of the project area. There are no
documented nesting sites around Coulter Creek.
Recovery or Management Plans Compliance
Management Recommendations for Bald Eagles are included in W.D.F.W.'s
Management Recommendations for Priority Species. This project is in compliance with
the recommendations in this document.
6.0 Potential Development Impacts
Vegetation Disturbance
The proposed construction zone is within an existing cleared and managed graveled area.
No vegetation disturbance or removal will be necessary to achieve project objectives.
Designated Critical Habitat for Salmonids
None of the actions described in the proposed project will destroy or adversely modify
designated critical habitat. All actions described in this plan will not jeopardize the
continued existence of any listed species.
Noise Pollution
A slight increase in noise from construction activities is anticipated during daylight
construction hours. This will not adversely impact listed fish species occurring in the
vicinity of the project area. It will not likely impact Bald Eagles. The project is not
located within the proximity to any observed nesting sites. No roosts have been observed
or documented within the radii of concern.
5
Temporary Increase in Sediment and Turbidity During Construction
The proposed work has the potential to temporarily increase turbidity and suspended
sediment within the project area. Best Management Practices have been recommended to
reduce the potential for temporary increases in suspended sediment and turbidity.
7.0 Mitigation Measures
7.1 Preservation of Critically Important Plants
Native vegetation within designated restoration and preservation zones will be protected.
Due to the distance between the proposed construction zone and identified restoration
zone, this should not be a problem.
7.2 Seasonal Consideration of Construction Activities
Wintering bald eagle may be present between October 31 and March 31. It is
recommended that any high noise level construction be minimized during these dates.
7.3 Recommended Best Management Practices
Recommended Best Management Practices for this project are as follows:
• Perform work during dry weather,
• Install silt fencing around the work area to prevent erosion and siltation of waters.
• Minimize amount of erodible soils at any given time to the maximum extent
feasible.
• Check all equipment daily for leaks. Refueling and lubrication of equipment
should occur off site. Don't store any fuel, lubricants, chemicals, or hazardous
substances outside overnight within the project area.
• Do not apply any chemicals when there is a possibility of rain.
• No construction equipment should be allowed in the wetland on site.
• Comply with all permits and requirements of the government authority or agency.
7.4 Vegetation Restoration
Riparian
Currently the existing riparian zone is disconnected by a section of lawn that extends into
the bankfull channel. It is recommended that this area be restored to a level that provides
a riparian continuum throughout the property. The most time and cost effective means to
accomplish this would be through planting native vegetation within the area adjacent to
the creek.
Wetland Vegetation Area
An area of approximately 2,000 square feet located north of the house adjacent to the
wetland should be planted to enhance the function of the wetland vegetation area and
prevent future impacts resulting from residential land use.
6
.,.... .. .. "m.:,;�•-„_.�,6sw3waaea - "a �^iazn k*k ; "g-�,.a�aa3�� iw� :YesS-w1N�°.�d ^,�ac i'
Figure 4. A portion of the recommended restoration zones
Native Plantings
It is recommended that supplemental native plantings be installed within the identified
zones. These plantings should be installed to achieve the following densities:
Trees- 10' on center
Shrubs-4' on center
Ferns-3' on center
These densities would provide a moderately dense, structurally diverse plant community
within the restoration area. Any natural volunteer native vegetation can be counted
towards the target densities of restoration plants. After planting is finished, mulching any
disturbed dirt areas around the plants with straw will help protect the new plantings and
prevent erosion.
Native plant species that may be used within the restoration zone include:
Trees: western red cedar(Thuja plicata)
Shrubs: salmonberry(rubes spectabilis)
Ferns: sword fern(Polystichum munitum)
Groundcover: kinnikinnik(Arcostaphy1mv uva-ursi)
Coastal strawberry(Fragaria chdoensis)
7
These species have been recommended due to their high success rates associated with
similar projects. All planting should occur during winter dormancy. The optimum time
for planting is during February and March.
Exotic Species Removal
Much of the identified restoration zone is dominated by exotic species such as Japanese
Knotweed and Himalayan Blackberry. Such species are stubborn competitors for light
and nutrients and hinder riparian plant succession. These species should be removed
from the entire area between the house and stream. Reed cannarygrass(Phalarys
arundinacea)will need to be trimmed back from the 2-3 foot radius surrounding
supplemented plants for the first three years. Herbicides should not be used to achieve
this due to the proximity to the stream. 'Three cuttings during the growing season will be
sufficient to offset the rhizomes of targeted species.
7.4 Minimizing Wetland Impacts
The proposed building is to be located within the required 85-foot Wetland Vegetation
Area. The building site currently maintains minimal to no significance to the wetland
due to its cleared nature and relatively flat topography. The following measures are
recommended to minimize impacts to habitat features of the wetland.
• Direct light away from the wetland.
• Route additional runoff resulting from construction away from the wetland.
• Limit the use of pesticides within 150-feet of the wetland.
• Adhere to recommended Best Management Practices
8.0 Monitorinp,
Monitoring of the site will begin the first fall following tree plantings and maintained on
a seasonal basis. The information gathered will provide the following: 1)condition of
reintroduced plant species;2)the use of the site by wildlife species;3)any disturbance
caused by the development and its effect on protected zones and associated aquatic
habitat;4)any occurrence of exotic species within the restoration zones;5)any corrective
measures that may be deemed necessary to provide desired conditions. This monitoring
will be in effect for the duration of three years. The information gathered will be
provided in an annual report and submitted to the Director of Mason County Department
of Community Development.
9.0 Conclusion
This project involves constructing a residence with a footprint of 1,800 square feet. The
entire project lies within the protected buffer of a Type 3 Stream and partially within a
Wetland Vegetation Area. Based on current conditions the proposed building site
upholds minimal ecological significance pertaining to the health and habitat quality of the
8
stream or riparian corridor. Over 4,000 square feet of stream buffer and 2.000 square feet
of Wetland Vegetation Area will be restored through vegetation enhancement.
Preservation Measures,Restoration Measures,and Best Management Practices have all
been identified to avoid,minimize,and mitigate for proposed construction.
I trust this information is sufficient for your needs at this time. Thank you for choosing
me as your environmental consultant. If you have any questions feel free to call.
Lee Boad
Habitat Management Planning and Wetland Services
PO Box 2854
Belfair,WA 98528
360-620-0618
lceboad@hctc.com
Attached:Plot Map
9
Lee 130ad Halo Ma wemerrt Flaming and Wetland Services 2�4,3�' -__-- ------- __. .--------_._—_--255,79' — —-- - - - - -- '
Client;Ryan Gaffey Property, #12209 24 00041 ---- --
461 �Coulter Creek Road Coulter Creek
Ddfair,WA 98528
Side Channel \
4—
Lucaz Creek
\ \150' Duffer Cateopq II Wedand
169' Dwldvq 5etbackl 165' DuMN 5et6ack - \
150' Duffer Categona II Wedand \
--- I—t" Catrgay II Wed`'and l
I ` �
vcqctaw Upland Area Cl eared `
Forested Lvald 100' Du11dwq Seib /
Recam ,-Jed I 85 Duffer /
--- 100'----�!cratkn
Coulter Creek Road — — —
Lee DoM Hab�at Management Plarw N aid Wetland 5cmce5 ---—___-- 21-4.3T --- — —- — 23'5.19 ------- —
Cllet t,PJ4M Gaffey property. 412209 24 00041 1
461 �CaAer Creek goad CcAer Creek
Pelfair,WA 98y28
5ide Chanel
Lucas C4ek
Category II Weiland
�-
1� � � \ Categay II Weiland
scale; I.=60' � 'FO't?esta-anon \ �i
\ Za,e \
323,�9'
\\ \\ Weiland Vegetation Area
\ Keyta-atbn Zw
Category II Wetland
1 - - - 41-
Vegetated' /W.,d Area Cleared
� llplad
-�}y —{ farested Upland
I T Kecanmended
I h0'Dudd�q
Il 1
after Creek►Zaad
AFFIDAVIT OF POSTING NOTICE
STATE OF WASHINGTON )
) ss.
COUNTY OF MASON )
I, 0 4k 'e" M. H Iv do hereby certify that I posted .3 copies of
the attached IybTl� oi- Aye(,«A-Q-1� in 3 public places as follows:
one at 706i1� ( cpe�-rZ.K
one at \,-( C(�c'PF� Lt,�� ,I F'
one at �bST O��tc � (� C(�
In witness whereof,the party has signed this Affidavit of Posting Notice this 1-day
of 20 aS
By:
Address:
STATE OF WASHINGTON )
) ss.
COUNTY OF MASON )
Subscribed and sworn to me this / day of 200-5
BONNIE L CAP i
NOT,lRY PUBLIC tary Public fbf4fie Stat6 of Washington
ST-ATt. . -—ON
I 0
My Commission Expires June 6,2006 I Residing at 1
Commission Expires
---Notice of application for Variance from the Mason County
Resource Ordinance and Notice of Public Hearing
Notice is hereby given that Robert M.Griffey,who is the applicant for the following
proposal,has filed an application for a Variance.
The request for a variance from the Mason County Resource Ordinance No.77-93 is
to place a newly constructed home of 1,800 square feet within the buffer of a
tributary of Coulter Creek,a Type III stream,and the Vegetation Area and
Building Setback of a Category II wetland. Property location is 461 East Coulter
Creek Road,Belfair. Section 9 of Township 22 North,Range 1 West. Parcel#
12209-24-00041.
Date of complete application:February 8,2005.
The proposed development is reviewed as a Variance under the Mason County
Resource Ordinance No.77-93,specifically Sections 17.01.110 and 17.01.070,Fish
and Wildlife Habitat Conservation Areas and Wetlands,respectively,which detail
stream buffer and vegetation area requirements. Section 17.01.150,Variances from
Standards,establishes Variance procedures and criteria.The proposal requires a
Habitat Management Plan and Hearing Examiner approval.
A PUBLIC HEARING will be held by the Mason County Hearing Examiner on the
proposed project on Tuesday,April 12,2005 at 1:00 p.m.in the County
Commissioners Chambers,Bldg.1,411 N.5`h Street,Shelton,WA.
Please contact Charles Mead McCoy III of the Mason County Department of
Community Development at(360)427-9670,ext.294,with any questions or
comments on this development and variance.
H:\Word\Griffey RO Variance Public Notice.doc.ram