Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2024-00411 Solar - BLD Inspections - 5/1/2024
INSPECTION CARD Mason County ON615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www,masoncountywa.gov PERMIT# BLD2024-00411 PROJECT ADDRESS 2260 E Spencer Lake Rd Shelton, WA 98584 PARCEL# 221325000030 PROJECT DESCRIPTION Installing PV system on rooftop. OWNER YAGLE KRISTEN L&JAMES C ADDRESS 7346 21ST AVE NE PHONE CONTRACTOR A&R SOLAR ADDRESS 3211 MARTIN L KING JR WAY SOUTH SUITE B PHONE 253-707-9937 CONTRACTOR LICENSE RSOLAS'825P9 LENDER INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments BLD-Final Inspection J Lk Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360427-9670 ext 352 www.masoncountywa.gov B DD2024-00411 ROOF MOUNT SOLAR PANEL- RESIDENTIAL PROJECT DESCRIPTION: INSTALLING PV SYSTEM ON ROOFTOP. ISSUED: 04/01/2024 SITE ADDRESS: 2260 E SPENCER LAKE RD SHELTON EXPIRES: 09/28/2024 PARCEL: 221325000030 APPLICANT: YAGLE KRISTEN L&JAMES C OWNER: YAGLE KRISTEN L&JAMES C 7346 21ST AVE NE 7346 21ST AVE NE SEATTLE,WA 98115 SEATTLE,WA 98115 CONTRACTOR: A&R SOLAR 3211 MARTIN L KING JR WAY SOUTH SUITE B SEATTLE,WA 98144 253-707-9937 GENERAL CONTRACTOR'S LICENSE: A&R SOLAR License: RSOLAS'825P9 3211 MARTIN L KING JR WAY SOUTH SUITE B Expires: 11/19/2024 SEATTLE,WA 98144 253-707-9937 FEES: Paid Due Final Inspection $80.00 $0.00 Solar/PV Base Fee $30.00 $0.00 Solar/PV Fee $19.00 $0.00 State Fee-Residential $6.50 $0.00 Technology Surcharge $1.60 $0.00 Totals : $137.10 $0.00 REQUIRED INSPECTIONS BLD-Final Inspection CONDITIONS Printed by:Nikita Huckabey on:04/03/2024 11:48 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-00411 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. The installation of solar(thermal or photovoltaic)energy systems to provide space heating or cooling, hot water and swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International Mechanical Code, Uniform Plumbing Code, the International Fire Code, and be shall be listed and labeled in accordance with UL1703. Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the inspection by the Mason County Building Inspector. Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings. Not less than two-3-foot wide access pathways shall be provided from the eave to ridge. Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be available at time of inspection. Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use invertors listed for the utility interaction Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number, collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are compatible with the collector. Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit. Solar energy collectors, controls, dampers,fans, blowers and pumps shall be accessible for inspection, maintenance, repair and replacement. The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be constructed of noncombustible materials,flashed and sealed to prevent entry of water, rodents, and insects. The building inspector may require additional information, including an engineered design, to verify that existing roof or floor construction are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for inspection. All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. Printed by:Nikita Huckabey on:04/03/2024 11:48 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-00411 OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Nikita Huckabey on:04/03/2024 11:48 AM Page 3 of 3 OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. --------TO BE COMPLETED BY APPLICANT------- © Project Information Property Owner Name: James C&Kristen L Yagle Project Address: F22'1325000030 cel# 2260 E Spencer Lake Rd City: Shelton State.WA ZIP: 98584 Day Phone: (206)402-8836 Contractor Name A AND R SOLAR SPC Contractor License#: RSOLAS*903JM Contractor day phone: 206-707-9937 Describe project: Conventional framed built dwelling or garage, Pole structure,steel building,etc. Installing photovoltaic system on roof of conventional framed home. Note: Manufactured/mobile homes require L&l Approval PV system description Installing 13.53 kW DC, 11.40 kW AC OUTPUT PV system. (include manufacturer Installing (33) REC410AA Pure modules, and (1) SolarEdge and model#of PV SE1140OH-US inverter. modules and inverters): ©Determine if your project qualifies for expedited permitting: Yes No 1. PV system is designed and proposed for a detached one-or two-family dwelling or townhouse not more than three stories above grade or detached accessory structure that ❑ is code compliant to setbacks and height,or code allows expansion of nonconformity for solar modules. [IRC 101.2] 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ the local jurisdiction. 3. Rooftop is made from lightweight material such as a single layer of composition shingles, ❑ metal roofing, lightweight masonry,or cedar shingles. 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.21 ❑ 5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all required electrical permit(s) must be obtained from the Authority Having Jurisdiction to ❑ administer the electrical code. [IRC M2302.21 6. The installation shall meet the requirements of the International Fire Code as amended ❑ by WA State. [IRC M2302.21 7. The PV system is designed for the wind speed of the local area, and will be installed per ❑ the manufacturer's specifications. [IRC M2302.2.1(1)] 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] ❑ 9. Total dead load of modules,supports, mountings, raceways and all other appurtenances ❑ weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] 1 Enter total dead load of system(lbs/ftz): Click here to enter text. 10. To address uplift,modules are mounted no higher than 18" above the surface of the ❑ roofing to which they are affixed. [IRC M2302.2.1(4)] 11. Supports for solar modules are installed to spread the dead load across as many roof- framing members as needed to ensure that no point load exceeds fifty(50) pounds. ❑ [IRC M2302.2.1(5)] 12. The photovoltaic modules and supporting structure shall be constructed of noncombustible materials or fire-retardant treated wood equivalent to that required for ❑ the roof construction. [IRC M2302.2.1] 13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, ❑ rodents,and insects. [IRC M2302.2.21 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. ❑ [IRC M2302.2.31 Comments: Click here to enter text. If you answered yes to all of the above questions,the project qualifies for the over-the- counter permitting process. Q Submit this Checklist, Site Plan, and other required permit application forms to: [insert contact info for jurisdiction having authority] 0* As the property owner or authorized representative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. Applicant Signature: ,rQAt� Date:3/28/2024� �'� Applicant Name (Please Print):Anna Stevens - Project Admin 253-737-9680 --------TO BE COMPLETED BY MASON COUNTY STAFF------ Qualifiesfor OTC Building Permit? ❑Yes ❑No Permit Application#: Staff Initials Date: 2 .EE ALPHA PURE R E C PRODUCT SPECIREATIONS SOLARS MOST TRUSTED .... 1971t3S[71.7t0.1t .__ .... ,. Cell t e: 132half-cut REC heterojunction cells withlead-free, 1. 901[ YF gapless technology,6 strings of22cellsinseries - El153.7[6.05] Glass: 3.2 mm solar glass with anti-reflective surface treatment �� 1100t43.31+ in accordance with EN 12150 BacksheeC Highly resistant polymer(black) 6.0 o1 [024t0.01t Frame: Anodized aluminum(black) _ Junction box: 3-part,3bypass diodes,lead-free IP68rated,in accordance with IEC 62790 G ry StaubliMC4PV K8T4/KST4(4mm=) nxos ° Connectors: [a.43xo.Ot] in accordance withlEC62852,IP68onlywhenconnected Cable: 4mm'solar cable,1.1m+1.2m 305�xo lzoola7.z] - in accordance with EN 50618 10.a .o21 -� Dimensions: 1821x1016x30mm(1.8Smz) 1s3.7[e.asl j Weight: 20.5 kg -- __�_.�..-45[7.91 22.5(0.91 f.. 671_t3 RQ4 t012] _ Origin: Made in Singapore 30[1,21 Measurements in mm[in] Power Output-PM,x(Wp) 390 395 400 405 410 IEC 61215:2016,IEC 61730:2016,UL 61730 Watt Class Sorting-(W) 0/+5 0/+5 0/+5 0/+5 0/+5 IEC62804 PID IEC 61701 Salt Mist Nominal Power Voltage-VMS (V) 41.5 41.8 42.1 42.4 42.7 IEC62716 Ammonia Resistance F Nominal Power Current-IMPP(A) 9.40 9.45 9.51 9.56 9.61 ISO11925-2 Ignitabi[ity(Class E) Open Circuit Voltage-V0C(V) 48.6 48.7 48.8 48.9 49.0 IEC62782 Dynamic Mechanical Load Short Circuit Current-lu EC61215-2:2016 Hailstone(35mm) (A) 10.22 10.25 10.28 10.30 10.35 !EC62321 Lead-freeacc.to RoHS EU 863/2015 Power Density(W/m') 211 214 216 219 222 ISO14001,ISO 9001,IEC 45001,IEC 62941 Panel Efficiency(%) 21.1 21.4 21.6 21.9 22.2 takelihNay Power Output PMnx(WP) 297 301 305 309 312 oVE �,, ,�k u C E rr�1 a� waYEe<�Pat Lead F,ee igsc Nominal Power Voltage-VMPP(V) 39.1 39.4 39.7 40.0 40.2 O Nominal Power Current-I (A) 7.59 7.63 7.68 7.72 7.76 Z MPP Nominal Module Operating Temperature: 44°C(t2°C) Open Circuit Voltage-V0C(V) 45.8 45.9 46.0 46.1 46.2 Temperature coefficient ofP,,: -0.26%/°C Short Circuit Current-IX(A) 8.20 8.24 8.28 8.32 8.36 Temperature coefficient ofVOC: -0.24%/°C Values at standard test conditions(STC:air mass AM 1.5,irradiance 1000 W/M2.temperature 25*C),based on a production spread with a ffi Temp eraturecoecientofl 0.04%-C tolerance ofP V�&Ix*3%within one watt class.Nominal module operating temperature(NMOT:air mass AM1.5,irradiance 800W/m', sr / temperature 20VC,windspeed 1 m/s).'Where xxx indicates the nominal power class(P_)at STC above. 'The temperature coefficients stated are linear values Operational temperature: -40...+85'C Standard RECProTrust Panels per pa[let: 33 Maximum system voltage: 1000V Installed byan REC No Yes Yes Panels per 40ftGP/high cube container: 792(24pa[[ets) Certified Solar Professional Maximum test load(front): +7000 Pa(713 kg/ml)' System Size All Q5kW25-500kW Panels per 13.6 m truck: 924(28 pallets) Maximum test load(rear): -4000Pa(407kg/m2)' Product Warranty(yrs) 20 25 25 Panels per 53 ft truck: 891(27pa1[ets) Max series fuse rating; 25A Power Warranty(yrs) 25 25 25 Max reverse current: 2SA Labor Warranty(yrs) 0 25 10 'See installation manual for mountinggm5tructlons. Power in Year 1 98% 98% 98% Typical low irradiance performance of module at STC: r Design load-Test load/1.5[safetyfactor) Annual Degradation 0.25% 0.25% 0.25% Power in Year 25 92% 92% 92% See warranty documents for details.Conditions apply -_._-. _...i.._.._.._.-._.'. Irradlance(1N/m1) 0 Availablefrom: _ n N N m O 2 K �� O Founded in 1996,REC Group is an international pioneering solar energy company dedicated to empowering consumers with clean,affordable solar power.As Solar's Most Trusted,REC is committed to high quality,innovation,and a[ow carbon footprint in the solar materials and solar panels it manufactures. o Headquartered in Norway with operational headquarters in Singapore,REC also has regional hubs in North America,Europe,and Asia-Pacific. a Z. . www.recgroup.com Single Phase Inverter Z • C with HD-Wave Technology m for North America X SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US / _1 SE760OH-US / SE10000H-US / SE1140OH-US '..'..' YEAR TY r I AN - Ln ® o o o • A solar[' —11 ® ® solar,—-- —HD U © p p p O ® p 0 Optimized installation with HD-Wave technology / Specifically designed to work with / UL1741 SA certified,for CPUC Rule 21 grid compliance power optimizers / Record-breaking efficiency / Extremely small / Quick and easy inverter commissioning directly from a smartphone using the SolarEdge SetApp / Built-in module-level monitoring / Fixed voltage inverter for longer strings / Outdoor and indoor installation / Integrated arc fault protection and rapid shutdown for NEC 2014 and 2017,per article / Optional: Revenue grade data,ANSI C12.20 690.11 and 690.12 Class 0.5 (0.5%accuracy) solaredge.com solar=ee Sin le Phase Inverter Wit HID-Wave Tec nology for North America SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/ SE760OH-US / SE10000H-US / SE1140OH-US APPLICABLE TO INVERTERS WITH PART NUMBER SEXXXXH XXXXX8XX4 OUTPUT Rated AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ ✓ ✓ ✓ Vac (211-240-264) AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ Vac (183-208-229) AC Frequency(Nominal) 59.3-60-60.5": Hz Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A Current @240V Maximum Continuous Output 16 24 48.5 A Current @208V Power Factor 1,adjustable-0.85 to 0.85 GFDI Threshold 1 A Utility Monitoring,Islanding Protection,Country Configurable Yes Thresholds INPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W Maximum DC Power @208V - 5100 - 7750 15500 W Transformer-less,Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc Maximum Input Current @240V`2 8.5 10.5 13.5 16.5 20 27 30.5 Adc Maximum Input Current @208Vi1 - 9 13.5 - 27 Adc Max.Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600kc,Sensitivity Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V % 98.5 @ 208V Nighttime Power Consumption <2.5 W °-For other regional settings please contact SolarEdge support A higher current source may be used;the inverter will limit its input current to the values stated Sin le Phase Inverter Wit HD-Wave Technology for North America SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/ SE760OH-US / SE1000OH-US / SE1140OH-US ADDITIONAL FEATURES Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional) Revenue Grade Data,ANSI C12.20 Optional" Inverter Commissioning with the SetApp mobile application using built-in Wi-Fi Access Point for local connection Rapid Shutdown-NEC 2014 and 2017 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect STANDARD COMPLIANCE Safety UL1741,UL1741 SA,1-11-169913,CSA C22.2,Canadian AFCI according to T.I.L.M-07 Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI) Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size/AWG Range 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG DC Input Conduit Size/#of Strings/ AWG Range 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG Dimensions with Safety Switch in/ (HxWxD) 17.7 x 14.6 x 6.8 /450x370x174 21.3 x 14.6 x 7.3/S40 x 370 x 185 mm Weight with Safety Switch 22110 25.1/11.4 26.2/11.9 38.8/17.6 lb/kg Noise <25 <50 dBA Cooling Natural Convection Operating Temperature Range -40 to+140/-40 to+600) T/-C Protection Rating NEMA 4X(Inverter with Safety Switch) Revenue grade inverter P/N:SEx)=H-USOOOBNC4 Full power up to at least SOY/122T,for power de-rating information refer to:https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf O SolarEdge Technologies,Inc.AN rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED By SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc NI Ro H S other trademarks mentioned herein arc trademarks of their respective owners.Date:512019A'01/ENG NAM.Subject to change without notice. The Right Way! S-5-U Clamp The S-S-U clamp is by far our most popular and most versatile clamp. It fits about 85%of the standing seam profiles manufactured in North America—including most structural and architectural profiles. It can be used on N vertically oriented seams and, by rotating Othe clamp 90 degrees, it can also be used G on most horizontal 2" seam profiles. i" Its simple design,generous dimensioning and multiple hole orientations are what make the S-S-U clamp so versatile for use with the S-5!` snow retention products, such as ColorGard-", as well as with other 0 heavy-duty applications. 0 Installation is as simple as setting the = specially patented round-point setscrews into the clamp, placing the clamp on ' 4 }' the seam,and tightening them to the ` = specified tension.Then,affix ancillary .. !� items using the bolt provided with the y ++ product. Go to www.S-5.com/tools � E N for information and tools available for °' 0 E0 properly attaching and tensioning S-5! V clamps. L6 ICU � S-5-U Mini Clamp MThe S-S-U Mini is a bit shorter than the S-S-U and has one setscrew rather than two.The mini is the choice for attaching Q all kinds of rooftop accessories:signs, Al-d walkways, satellite dishes,antennas, N rooftop lighting, lightning protection The S-5-U clamp is our M'd 3 systems, solar arrays,exhaust stack most popular and versatile M +6 bracing,conduit,condensate lines, clamp, fitting about 85% Of mechanical equipment—just about LO M anything!* the standing seam profiles N 's= in North America. MOO 'S-5!mini clamps are not compatible with,and should not M be used with S-5!SnoRail"/SnoFence'"or ColorGard'snow W�y.� retention systems. W strengthThe of • is in its simpledesign. patented slightlysetscrews will dimple the metal seam material but • pierce it— leaving roof The Right Way! The S-5-U and S-5-U Mini clamps are each furnished with S-5-U Clamp the hardware shown to the right.Each box also includes a bit tip for tightening setscrews using an electric screw M10 hole gun.A structural aluminum attachment clamp,the S-5-U 2.00" from edge of part mm) is compatible with most common metal roofing materials (51.00 mm) excluding copper.All included hardware is stainless steel.Please visit www.S-5.com for more information including CAD details,metallurgical compatibilities and specifications. 7.50" The S-5-U clamp has been tested for load-to-failure results (38.00 mm) on most major brands and profiles of standing seam ��`� roofing. The independent lab test data found at www.S-5.com can be used for load-critical designs and 0.90" 0.54" applications.S-5!®holding strength is unmatched in the (23.00 m ) .00 mm industry. Example Profiles Note:Install both 0.40" ® setscrews onsame -� �mm) side of clamp. (3 S-5-U Mini Clamp i II� M8 holes centered 1.18 on part (30.00 mm) 1.50" (38.00 mm) 0.901, For horizontal seams under 0.65"do not use this clamp.Visit (23.00 m ) .5a•' (14.)0 mtf, www.5-5.com for more detailed information and proper clamp to use. 0.40" (10.00 mm) 1.50" (38.00 mm) Please note:All measurements are rounded to the second decimal place. S-51°Warning!Please use this product responsibly! Distributed by Products are protected by multiple U.S.and foreign patents.Visit the website at www.S-5.com for complete information on patents and trademarks.For maximum holding strength,setscrews should be tensioned and re-tensioned as the seam material compresses.Clamp setscrew tension should be verified using a calibrated torque wrench between 160 and ISO Inch pounds when used on 22ga steel, and between 130and 150 inch pouncisforall othermetalsand thinner gauges of steel.Consult the S-51 website at www.S-S.com for published data regarding holding strength. Copyright 2013,Metal Roof Innovations,Ltd.S-5!products are patented protected. S-9 aggressively protects its patents,trademarks and copyrights.Version 031113. XR Rail Family The XR Rail Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. l XR10 XR100 XR1000 XR10 is a sleek,low-profile mounting XR100 is the ultimate residential XR1000 is a heavyweight among rail,designed for regions with light or mounting rail. It supports a range of solar mounting rails. It's built to handle no snow. It achieves 6 foot spans,while wind and snow conditions,while also extreme climates and spans 12 feet or remaining light and economical. maximizing spans up to 8 feet. more for commercial applications. 6'spanning capability 8'spanning capability 12'spanning capability • Moderate load capability Heavy load capability Extreme load capability Clear&black anodized finish Clear&black anodized finish Clear anodized finish Internal splices available Internal splices available Internal splices available Rail Selection The following table was prepared in compliance with applicable engineering codes and standards. Values are based on the following criteria:ASCE 7-10, Roof Zone 1, Exposure B, Roof Slope of 7 to 27 degrees and Mean Building Height of 30 ft. Visit lronRidcie.com for detailed span tables and certifications. 100 j I 120 None 140 XR10 XR100 XR1000 160 100 120 10-20 140 160 100 30 160 100 40 - 160 50-70 160 80-90 160 AM& IRONRIDGE XR Rail Family Solar Is Not Always Sunny Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of \� ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails are the structural backbone preventing these results. They resist uplift, protect against buckling and safely and efficiently transfer loads into the building structure. Their superior spanning capability 0114- � requires fewer roof attachments, reducing the number of roof penetrations and the amount of installation time. g, Force-Stabilizing Curve Sloped roofs generate both vertical and lateral forces on mounting rails which can cause them to bend and twist.The curved shape of XR Rails is specially designed to increase strength in both directions while resisting the twisting.This unique feature ensures greater security during extreme weather and a longer system lifetime. Compatible with Flat& Pitched Roofs Corrosion-Resistant Materials XR Rails are IronRidge offers All XR Rails are made of 6000-series compatible with a range of tilt leg aluminum alloy,then protected with an ' A FlashFoot and options for flat anodized finish.Anodizing prevents surface other pitched roof roof mounting and structural corrosion,while also providing attachments. applications. a more attractive appearance. �. XR Rails O XR10 Rail XR100 Rail XR1000 Rail Bonded Splices ,i ,mot..r-ems. A low-profile mounting rail The ultimate residential A heavyweight mounting All rails use internal splices for regions with light snow. solar mounting rail. rail for commercial projects. for seamless connections. • 6'spanning capability 8'spanning capability 12'spanning capability Self-drilling screws • Moderate load capability Heavy load capability Extreme load capability Varying versions for rails • Clear& black anod.finish Clear& black anod. finish Clear anodized finish Forms secure bonding Clamps & Grounding O UFOs Stopper Sleeves Grounding Lugs Microinverter Kits Universal Fastening Objects Snap onto the UFO to turn Connect arrays to Mount Mls or POs to XR bond modules to rails. into a bonded end clamp. equipment ground. Rails. • Fully assembled & lubed Bonds modules to rails Low profile Bonds devices to rails • Single, universal size 6 different sizes Single tool installation Kit comes assembled • Clear& black finish Clear& black anod. finish Mounts in any direction Listed to UL 2703 Attachments O FlashFoot2 Slotted L-Feet Bonding Hardware Flush Standoffs AMC 411ttl Flash and mount XR Rails Drop-in design for rapid rail Bond and attach XR Rails Raise Flush Mount System with superior waterproofing. attachment. to certified attachments. to various heights. • Twist-on Cap eases install Secure rail connections T& Square Bolt options Works with vent flashing • Wind-driven rain tested Slot for vertical adjusting Nut uses 7/16"socket 4"and 7" lengths • Mill & black finish Clear& black anod. finish Assembled & lubricated Ships assembled Resources Design Assistant ,stiP��6, NABCEP Certified Training Go from rough layout to fully Earn free continuing education credits, 'NABCEP engineered system. For free. while learning more about our systems. -- Go to IronRidge.com/design Go to IronRidge.com/training 0 :00 ,,A_ /lr IRON RIDGE UFO Family of Components Simplified Grounding for Every Application The UFO family of components eliminates the need for separate grounding hardware by bonding solar modules directly to IronRidge XR Rails. All system types that feature the UFO family—Flush Mount, Tilt Mount and Ground Mount—are fully listed to the UL 2703 standard. UFO hardware forms secure electrical bonds with both the module and the rail, resulting in many parallel grounding paths throughout the system. This leads to safer and more reliable installations. Stopper Sleeve Universal Fastening Object(UFO) The Stopper Sleeve snaps The UFO securely bonds solar modules to XR onto the UFO,converting it into Rails.It comes assembled and lubricated,and 1 a bonded end clamp. can fit a wide range of module heights. o ��►i�����y yid Bonded Splice Each Bonded Splice uses self-drilling screws to form a secure connection.No bonding strap needed. M'' Grounding Lug A single Grounding Lug Bonded Attachments connects an entire row The bonding bolt attaches of PV modules to the and bonds the L-foot to the - grounding conductor. rail. It is installed with the same socket as the rest of the system. System Diagram - - - - - - - - - - - - - - - - - -m- - - - - - - - - - - - - - _ _ - , - - - - - - - - - - - - - - - - - -m- - - - - - - - - - - - - - _ _ - - - - - - - - - - - - - - - - - -m- - - - - - - - - - - - - - - - l - - - - - - - - - - - - - - - - - -m- - - - - - - - - - - - - - - - O UFO j Stopper Sleeve • Grounding Lug m Bonded Splice ---L Ground Wire 4 Approved Enphase microinverters can provide equipment grounding of IronRidge systems, eliminating the need for grounding lugs and field installed equipment ground conductors(EGC).A minimum of two microinverters mounted to the same rail and connected to the same Engage cable is required. Refer to installation manuals for additional details. UL Certification Cross-System Compatibility The IronRidge Flush Mount, ount Tilt Mount, and Ground Mount XR Rails d �/ XR1000 Only Systems have been listed to UL 2703 by Intertek Group plc. UFO/Stopper .i .I .I UL 2703 is the standard for Bonded Splice N/A evaluating solar mounting Grounding Lugs 1 per Row 1 per Row 1 per Array systems. It ensures these devices Microinverters Enphase- M250-72, M250-60, M215-60, C250-72 will maintain strong electrical and & Power Darfon - MIG240, MIG300, G320, G640 mechanical connections over Optimizers SolarEdge- P300, P320, P400, P405, P600, P700, P730 an extended period of time in extreme outdoor environments. Fire Rating Class A Class A N/A Modules Tested or Evaluated with over 400 Framed Modules OGo to IronRidge.com/UFO Refer to installation manuals for a detailed list. o :00 ,��_ /lr IRONRIDGE Class A Fire Rating Background All roofing products are tested and Fire Testing Process classified for their ability to resist fire. Test Setup Recently, these fire resistance standards Solar Modules y Solar modules are given a Type were expanded to include solar equipment classification based on their as part of the roof system. Specifically, this materials and construction. requires the modules, mounting hardware Mounting System and roof covering to be tested together as Mounting is tested as part of a system that includes type-tested a system to ensure they achieve the same modules and fire-rated roof covering. ` fire rating as the original roof covering. Roof covering Roof covering products are given a These new requirements are being adopted Fire Class Rating of A, B or C based throughout the country in 2016. on their tested fire resistance. Burning Brand Test IronRidge Certification IronRidge was the first company to receive a Class A Fire Rating—the highest possible rating—from Intertek Group plc., a Nationally Recognized Testing Laboratory. A burning wooden block is placed on module as a fan blows at 12 mph. IronRidge Flush Mount and Tilt Mount Flame cannot be seen on underside of roof within 90 minutes. Systems were tested on sloped and flat roofs in accordance with the new UL 1703 Spread of Flame Test & UL 2703 test standards. The testing 2000 evaluated the system's ability to resist 9 flame spread, burning material and structural damage to the roof. Refer to the table below to determine the requirements for achieving a Class A Fire Rating on your next project. Flame at southern edge of roof is aimed up the roof as a fan blows at 12 mph.The flame cannot spread 6 feet or more in 10 minutes. Fire Rating* F lush Mount kN Any Slope Type 1, 2, & 3 Class A 7 Tilt Mount <_6 Degrees Type 1, 2, &3 Class A 'Class A rated PV systems can be installed on Class A,B,and C roofs. Frequently Asked Questions What is a "module type"? What attachments and flashings are deemed compatible with Class A? The new UL1703 standard introduces the concept of a PV module type, based on 4 construction parameters Attachments and their respective flashings are not and 2 fire performance parameters. The purpose of constituents of the rating at this time.All code-compliant this classification is to certify mounting systems without flashing methods are acceptable from a fire rating needing to test it with every module. standpoint. What roofing materials are covered? What mounting height is acceptable? All fire rated roofing materials are covered within this UL fire testing was performed with a gap of 5", which is certification including composition shingle, clay and considered worst case in the standard. Therefore, the cement tile, metal, and membrane roofs. rating is applicable to any module to roof gap. What if I have a Class C roof, but the jurisdiction Am I required to install skirting to meet the fire now requires Class A or B? code? Generally, older roofs will typically be "grandfathered No, IronRidge achieved a Class A fire rating without any in", and will not require re-roofing. However, if 50%or additional racking components. more of the roofing material is replaced for the solar installation the code requirement will be enforced. What determines Fire Classification? Where is the new fire rating requirement code listed? Fire Classification refers to a fire-resistance rating system for roof covering materials based on their ability 2012 IBC: 1509.7.2 Fire classification. Rooftop to withstand fire exposure. mounted photovoltaic systems shall have the same fire classification as the roof assembly required by Section Class A-effective against severe fire exposure 1505. Class B -effective against moderate fire exposure Class C-effective against light fire exposure Where is a Class A Fire Rating required? What if the roof covering is not Class A rated? The general requirement for roofing systems in the IBC refers to a Class C fire rating. Class A or B is required for The IronRidge Class A rating will not diminish the fire areas such as Wildland Urban Interface areas(WUI) and rating of the roof, whether Class A, B, or C. for very high fire severity areas. Many of these areas are found throughout the western United States.California What tilts is the tilt mount system fire rated for? has the most Class A and B roof fire rating requirements, due to wild fire concerns. The tilt mount system is rated for 1 degrees and up and any roof to module gap, or mounting height. Are standard mid clamps covered? Mid clamps and end clamps are considered part of the PV"system", and are covered in the certification. More Resources Installation Manuals Engineering Certification Letters Visit our website for manuals that include UL 4 We offer complete engineering resources 2703 Listing and Fire Rating Classification. and pre-stamped certification letters. Intertek Go to IronRidge.com Go to IronRidge.com o :00 ' AA u� f _ 1 9 F I •1 ?7' 0 A P PV Module(s) Building Height I Rafters or Manufactured trusses, 24" O.C. (sample) Attachment point layout for ar - 48" O.C. Max. o Attachment Detail PV MODULE XR RAIL (E) STANDING SEAM I A METAL ROOF 657 ft.' 21% :nGu , - - - -- r� b - Z41 B T' 01 r d " o r r r r -- - - r 3� Located less than 10' from net meter and less than 10' from tap — — — — — — — Z I I Service entrar o N — I Supply Side Connection v__ 4/0 XF o 705.11 2/0 XI I I • I — — — - - — — — — — — #6GEc Neutral Bar w/ bonding jumper I Qp I (Existin( QI Main Service (1ph 240V S Main Breaker Bus Rating: I QTY Watts Output AC #of OCPD 33 1 nverter Specs u u Voltage Inverters )ptimizer 33 Solar Edge SE11400H 11400 47.5 240 1 60 1 ****N/A**** 0 0 O 0 0 OOH 1 ****N/A**** 0 0 0 0 0 Heavy Duty, Fuse, Lockable 1 Module Specs �1 —p for Disconnect (qty 1/pole) 2 Watts w Imp Vm Voc Isc or Di Monitoring 1 REC410AA Pure 410 9.61 42.7 49 10.35 -nptTemp. Adjusted 0 0 38.9 52.8 0 General Notes: Utility: Mason County PUD nar�i nirtnnra ('iirrant r)narntina \/nitaaa \/ r)rnn 1. EGC Where exposed to physical damage Output # of Total AC Comb. EGC AC Voltage OCPD Interconnection Calcs Site Conditions U Inverters out.(A) OCPD AC 47.50 240 1 60 Main Breaker 200 ASHRAESite: Seattle 0.00 0 0 0 47.5 60 410 Bus Bar 200 Low Temp(°F) 19 0.00 0 0 0 Max ?V CCD Allowed 40 High 2%Temp(°F) 84 EGC Imp Vmp Voc Isc Temp. Co V(oc) DC PV OCPD Device used 60 High 0.4%Temp("F) 91 9.61 42.7 49 10.35 -0.24 410 lap or Breaker'' Tap 38.9 52.8 olarEdge Optimizer Max current output: 1SA, Max Voltage: 480V Max Array POWer(STC): 13.53kW DC Max Continuous AC Power: 11.4kW A Solar Edge SE11400H ****N/A**** ****N/A**** 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 R 4 OA Pure ****SELECT**** ****SELECT**** 11 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 1 0 0 33 Array Specs (Adjusted for Temperature) lgeSE11400H **`*N/A* ** ****N/A**** 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 11.28 10.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.0 400.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 480.0 480.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AL CU Wire (QTY)Phase Neutral Neutral EGC Wire Type Conduit Min. 901C Temp Fill Derated 75'C Current Operating Gauge Conductors AWG QFY) (AWG) Type Conduit Rati nq Correct. Derate AmpaciW Rating (6)125% Voltage CU #10 2 N/A N/A #6 PV Wire 600V AIR N/A 40 1 100% 40.00 35 18.8 400 CU #1D 6 N/A N/A #10 THWN-2 EMT 0.75" 40 1 80% 32.00 3S 18.8 400 CU #6 2 #6 1 #10 THWN-2 EMT 0.75" 75 1 100% 75.00 65 59.4 240 CU #6 2 #6 1 #6 THWN-2 PVC 1" 75 1 100% 75.00 65 59.4 240 K) NEC 2020 690.13 (B) SOLAR PV SYSTEM EQUIPPED TION DOWN TURN RAPID SHUTDOWN SWITCH TO THE F "OFF"POSITION TO Ai SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY L) NEC 2020 690.56 (C) Qn, Located on or no more than 3' from the PLACARD SPECS service disconnecting means to which the PV G) NEC 690.54 system is connected MAX AC OUTPUT CURRENT: 47.5 A AC Letter Height:1/8" Maintain 1/4 border 1 • . VOLTAGE: + Interco vned) Red/White INVERTER #XX Hy NEC 690.53 MAX DC VOLTAGE: 4:+ + V DC • + • Letter Height:l/8" � � Maintain 1/4"border 1 Soiar E O) A&R Solar Requirement * if MAX CIRCUIT CURRENT OF Red/White Amer- multiple inverters TO DC CON + A . G' NEC 690.54 WARNING DUAL, POWER SOURCE Letter Height:1/8" (� SECOND SOURCE IS PHOTOVOLTAIC SYSTEM MAX AC OUTPUT V AC Maintain 1/4"border 1 Disconr • P) NEC 2020 705.12(C) & 690.59 OPERATING VOLTAGE: + Red/White to CAUTION: D• NOT mbiner used ADDITIONAL LOADS R) AHJ Requirement * if combiner used DISCONNECT,EMERGENCY DISCONNECTSERVICE S) NEC 2020 230.85(1) S440 SolarEdge Optimizer 33 JBox 1 Solar Edge SE11400H 1 60A 240V 2 Pole I Heavy Duty, Fuse, Lockable 1 DH222NRK FLNR - 60A Fuses for Disconnect (qty 1 /pole) 2 SolarEdge Consumption Monitoring 1 Tap connectors IPCS4002 2 pair of CT's 1 consumption monitoring IronRidge Racking BOM XR10 Black,14' 18 Kit, XR10 Bonded Splice BOSS 10 Universal Module Clamp, Black 76 Stopper Sleeve 30mm 20 Grounding Lug, Low Profile 5 Square-Bolt Bonding Attachment Hardware 71 1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt 33 End Caps, 10 sets(package) XR10 1 S-5 ! Clamp, Mill (Spacing: 48") 73 L-Feet, Mill 71 additional mounts for conduit included in mounts line item = 2 System Weights Racking Weight: 238.7(lbs) Total Weight: 1727(lbs) Weight/Attachment: 24.32(lbs) DeadLoad: 2.63(PSF) r MASON COUNTY PERMIT NO. DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING•PLANNING•FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 Mason County Bldg. III,426 West Cedar Street (360)275-4467 Belfair ext. 352 Shelton,WA 98584 (360)482-5269 Elma ext. 352 PLUMBING & MECHANICAL PERMIT APPLICATION OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:James C&Kristen L Yagle NAME:A AND R SOLAR SPC MAILING ADDRESS:2260 E spencer Lake Rd MAILING ADDRESS:9700 Martin Luther King Jr way S CITY:Shelton STATE:wA ZIP:9a584 CITY:Seatne STATE:wA ZIP:98118 PHONE:(208)402-8836 CELL: PHONE:206-707-9937 CELL: EMAIL:jimyagle@gmail.com EMAIL :permits@a-rsolar.com L&I REG#602707872(UBI#) EXP. 05/20/ 24 PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER):221325000030 LEGAL DESCRIPT ION(ABBREVIATED):none given SITE ADDRESS:2260 E Spencer Lake Rd CITY:Shelton DIRECTIONS TO SITE ADDRESS: TYPE OF JOB NEW ADD ALT x REPAIR _ OTHER USE OF BUILDING LOCATION OF FIXTURES/UNITS—1ST FLOOR 2ND FLOOR BASEMENT GARAGE OTHER PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No.of Fixtures Fees Fuel Type:Electric LPG Natural Gas Ductless_ Toilets Type of Unit No.of Units Fees Bathroom Sink Furnace Bath Tubs Heat Pump Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hose bibs Dryer Vent Other Solar Panel 1 Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or contractor.I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X 4m4ta, 'S�¢/sd 03/28/2024 Signature of Applicant Date XAnnaStevens-A AND R SOLAR SPC Owner/Owners Representative/Contractor Print Name (indicate which one) DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL