Loading...
HomeMy WebLinkAboutMEP2018-00027 - MEP Application - 11/30/2018 ® MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP J2A') —Qd&7 ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMEN*,CC Mason County Resource Ordinance(Chapter 17.0 I MCC) � ENVIRONMENTAL PERMIT APPLICATION 6� U,1��A'OV 3.1 8 The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical is under the authority of Chapters 36.32,36.70A,39.34,58. 17,76.09,84.33,84.34 and 90.58 RCW. r St/be t PL EAS E PRINT 1.PROP ERTY OWN ER Name: Glenn Carlson(Commissioner)-Port of Grapeview Mailing Address:PO Box 3,Grapeview,WA 98546 Work Phone:(360)275-5020 Email Address:portofgrapeview2@gmail.com Home/Cell Phone:(206)200-5452 Fax#: If an agent is acting for the property owner during the permit process, complete#2. 2.AUTHORJZED AG ENT Name:Ann Boeholt— Soundview Consultants,LLC Mailing Address:2907 Harborview Drive,Suite D,Gig Harbor,WA 98335 Work Phone:(253)514-8952 Email Address:ann@soundviewconsultants.com Home/Cell Phone: Fax#:(253)514-8954 3. PROJ ECT SITE Address: 5054 E Grapeview Loop Road Grapeview,WA 98546 Parcel#: 12105-51-63003 and 12405-51-63004 Legal Description: DETROIT#2 BLK:63 TR 3&TLS and DETROIT#2 BLK:63 TR 4&T.L.&VAC PTN ST&ALLEY Directions to Site: Starting from Allyn,WA,drive south 0.8 mil e o n State Route 3.After crossing Sherwood Creek Bridge,turn left onto Grapeview Loop Road and travel 3 miles.Turn left onto Griswwold Avenue.The Port of Grapeview boat ramp is just north of Fair Harbor Marina. Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. !\Community Development\PACNEP Page I oft Revised June 20 10 � _ 1 4. State which section requires permit: Frequently Flooded Areas,Chapter 17.01.090 and Fish and Wildlife Habitat Conservation Areas,Chapter 17.01.110 5. Identify current use of the property with existing improvements: One of the subject properties is currently undeveloped with a dysfunctional creosote timber pile bulkhead present along the shoreline below the OHW.The other subject property has a well maintained concrete bulkhead and single family residence. 6. Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets,if needed): As mitigation for the proposed floating dock to the south removal of a dysfunctional timber pile bulkhead is proposed as well as the removal of approximately 1,275 square feet of angular stone and restoration,and the installation of a diffuser tee on an existing stormwater outfall pipe. 7. Describe why the action requiring this permit cannot be avoided. The removal of the timber pile bulkhead,angular stone and installation of a diffuser tee are proposed as mitigation for the floating dock proiect located to the south of the subiect property.The timber piles and angular stone are located below the OHW therefore restoration of these areas will require work below the OHW. 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes ©° 9. Identify any surface water on or adjacent to property(circle one): altwate Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one):If septic is located on project site, include records. Connected to Septic Connected to Community Septic 11. Identify existing water suppl(circle one): Public Water Supply well 12. Type of Job(circle one): ew Add Alteration Repair Demolition Other: Ann Boeholt November 27,2018 Print Name Signature Date 1,(onmmnity DevelopmentTACMEP Page 2 or- Revised hme 20 10