Loading...
HomeMy WebLinkAboutPond Letter - MEP Application - 12/22/1998 GARY YANDO,DIRECTOR �oN.STA o P A U N u DEPARTMENT OF COMMUNITY DEVELOPMENT r- o T z PLANNING - SOLID WASTE- UTILITIES N Y y BLDG. I • 411 N. 5TH ST. • P.O. BOX 578 1864 SHELTON,WA 98584 • (360) 427-9670 December 22, 1998 Larry DeMers 301 E Underline Road Belfair, Washington 98528 RE: POND PROJECT ON YOUR PROPERTY (PN 12207-75-00550),-, AT 301 E UNDERLINE ROAD, BELFAIR Dear Mr DeMers: This letter is a follow-up on our discussion and site visits to your property. During mid- summer 1998, I visited your property to look at the site of a pond that you wanted to create on your 5.04 acre property. We discussed the dimensions of the area and the location of the planned pond. I observed a seasonal drainage and shallow, saturated soils in the area of the pond and that the pond location was isolated from adjacent properties around your parcel. You described that your contractor would excavated below the grade of the drainage and utilize the clay soils exposed in order to seal the bottom and sides of the pond. You said that you planned to create the earthen berm at lowest point of the drainage so that you could retain a portion of runoff to a level above the excavated area. I suggested that the overflow culvert be placed at the grade of the original soil level to assure that it will stay in place. You completed a Mason Environmental Permit application so that the county had a description and drawing of the proposal. You and your contractor went ahead a constructed the pond as you described (removal of vegetation and woody debris, excavation to original grade, sloped banks covered with uncovered clay materials, and installed culvert in berm at original grade). You had me visit the site on November 23, 1998 to verify how you constructed the pond. I observed that the pond was indeed functioning by capturing the runoff from rainstorms that occurred in the previous two weeks. The water level on that date had not reached the culvert bottom. Loose materials from the sloped banks had collapsed into the water and had not yet settled out. One bank to the north of the berm needed some pulling back to control slumping into the pond. The outlet end of the culvert needed additional rock on the bank to reduce potential erosion from flows coming out the pond. In your phone call around December 14, 1998, you said that the waters of the pond are now clear, that the additional rocks have been placed downhill of the culvert, and that water is flowing through the culvert with no problems with erosion. The next step is to prepare to Recycled revegetate the banks of the pond. I have enclosed a booklet on erosion control plantings that help to choose what plants that you can use for revegetating the banks and around the pond. You may also want to talk to Mason Conservation District about replanting a pond, since they work with farmers and landowners on land management techniques; their office is in Shelton and their number is (360) 427-9436. In conclusion, the proposed pond has been constructed successfully (following what you planned and some of my recommendations). Getting the slopes revegetated is the next important task to get done. You may contact me for any other questions that you may have by telephone (360) 427-9670 ext. 365. Sincerely Allan Borden Senior Planner PERMIT NO. DATE RECEIVED MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT INTERIM RESOURCE ORDINANCE (Chapter 17.01 MCC) Courthouse Annex III, 426 W. Cedar/P.O. Box 578, Shelton, WA 98584, 427-9670/1-800-562-5628 ENVIRONMENTAL PERMIT APPLICATION The purpose of the Interim Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34, and 90.58 RCW. PLEASE PRINT #1 Owner Phone# 7 Site Address Fire District # City i, it _State Zip Owner Mailing Address Me, U t Q V City State Zip Lien/Title Holder Addres ( r4v 4JL q City State Zip ���= 1 #2 P ceI N ( - Legal Description No . -cf 3 8 Parcel Size e(Gr #3 Direc ions to site (Please attach m p) on t u r er Wreq �'- -7#4 rn tat w at 5ecti� d a permit: Long-Term Commercial Forest, Chapter 17.10.060; _ Inholding Lands, Chapter 17.01.062; _ Mineral Resource Lands, Chapter 17.01.066; f� Wetlands, Chapter 17.01.070; _ Critical Aquifer Recharge, Chapter 1 f.01.08u; _ Aquatic marldgernerii Ars.oas, Chapic-, 17.0.. Geologic Hazard Area: _ Frequently Flooded Areas, Chapter 17.01.090; _ Landslide Hazard Areas, Chapter 17.01.100; _ Seismic Hazard Areas, Chapter 17.01.102; _Erosion Hazard Areas, Chapter 17.01.104. #5 Identify current use of property with existing improvements: 51, o,�-� c� I i]SP— #6 Identify and describe the proposed project, including the type of materials to be used, construction methods, principal dimeH�x other er 'Went i ormation (At h additional sheets if needed): a z /? Q_ #7 Any Neater on or adjacent trc, prop srty: S ltwat,3r_I al-e_PPond w_� 'etland Seasonal runoff Other #8 Will there be an alteration of a wetland and/or wetland vegetation area? _Yes )4 No #9 If septic is located on project site, include records. Connect to Septic? Community Septic? Public Water Supply? Well? #10 Type of Job: New Add Alt Repair Demolition Other Af This permit is granted pursuant to the Interim Resource Ordinance (Chapter 17.01 MCC) and nothing in this pe ,it shell excuse the applicant from compliance with any other federal, state, or local statutes, ordinances or regulations apb icable to this project, but not inconsistent with the Interim Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. Show following on the site plan Lot Dimensions Flood Zones Existing Structures Fences Structure Setbacks Driveways Water Lines Shorelines Drainage Plan Topography Septic System Wells Proposed Improvements Easements Indicate Directional by (N, S, E, W) Name of Flanking Street in relation to plot plan. APPLICANT TO DRAW SITE PLAN BELOW _ f IAIv'EW4 Sept,t Moto r Pump © s- �o►+ti S I(OOSE 6/ i(l � PoNp �qS t u ve APPLICANT TO DRAW TOPOGRAPHY BELOW W S� jJor qoy�se �or DEPARTMENTAL REVIEW FOR OFFICIAL USE ONLY ,:. : - Comments Planning: Environmental Health: Building Plan Review: Occupancy Group: Fire Marshall: Other: FEES Conditions: e TOTAL FEE Accepted by: Date: 1610 ONE VId,.00 NOSVVI 8661 o AON u ii`i::i i r